Search Documents

  • SME
    The Tailings Dam Monitoring And Pre-Alarm System (TDMPAS) And Its Applications In Mines

    By E. Sun

    Tailings disposal is a significant consideration for the mining industry, with the majority of the ore processed in most mining operations ending up as tailings. Several tailings dam failure accidents

    Jan 1, 2012

  • SME
    Demonstration Of The Advanced Radio Imaging Method (Rim): Ground Truth Results For Three-Dimensional Imaging Of Coal Seams

    By L. G. Stolarczyk, Y. Luo, S. S. Peng

    Detection and assessment of severe geological anomalies ahead of a longwall face greatly benefits the mining operation. Electromagnetic-based Radio Imaging Method (RIM) is one of the most promising ge

    Jan 1, 2004

  • AIME
    Who's Who in Mineral Engineering - The 1979 Directory of the Society of Mining Engineers of AIME

    Who's Who in Mineral Engineering - The 1979 Directory of the Society of Mining Engineers of AIME

    Jan 7, 1979

  • CIM
    Semi-Autogenous Grinding Circuit Reduces Capital Costs

    By H. C. Counsell, R. Webber

    "The mill at Denison Mines' Elliot Lake Operations started up in 1957, with a capacity of 6,000 tons per day. Over the years various plant modifications expanded th.is to 7 500 tons per day. In 1976,

    Jan 1, 1984

  • NIOSH
    IC 8271 Block-Caving Copper Mining Methods and Costs at the Miami Mine, Miami Copper Co., Gila County AZ

    By W. R. Hardwick

    This Information Circular describes the development of block-caving methods and practices by the Miami Copper Co. at the Miami mine in Gila County, Arizona. It is one of a series published by the Bure

    Dec 1, 1964

  • SME
    Current Ground Support Membrane Applications In North American Underground Mines

    By L. Lacerda

    Spray-on ground support membranes (GSM) or thin support liners hold today perhaps as much potential to impact underground (u/g) ground support operations as dry and later wet-mix shotcrete when introd

    Jan 1, 2002

  • SME
    U.S. Longwall Development Projected to Increase

    By James F. Kvitkovich, George V. Weisdack

    Editor’s note: This is the second part of a two-part series on longwall mining in the United States. Part one was published in the December 2005 issue of ME (pp. 21-26). It provided a history of lo

    Jan 1, 2006

  • NIOSH
    RI 2977 Rock barriers for coal mines

    By G. S. Rice, H. P. Greenwald, H. C. Howarth

    """Rock-dust barriers""5 as they are termed in this country, are for the purpose of confining a coal-dust mine explosion to the limited area in which it originates. These barriers were first tested in

    Jan 1, 1930

  • NIOSH
    IC 8550 Designing Blast Patterns Using Empirical Formulas - A Comparison Of Calculated Patterns With Plans Used In Quarrying Limestone And Dolomite, With Geologic Considerations

    By Joseph M. Pugliese

    This work was done by the Bureau of Mines to provide quarry operators with an uncomplicated, first-approximation method for designing blast patterns, considering geologic structure, and to show the va

    Jan 1, 1972

  • AUSIMM
    Paper No. 132. Milling And Treatment of Auriferous Ores in New Zealand.

    In dealing with the pulverization and treatment of auriferous ores, it may be stated that there is not one system of treatment applicable to all classes. In the southern portion of New Zealand the ore

    Jan 1, 1903

  • AUSIMM
    Mineralogy and Textures of Thackaringa Sulphide Ore (24fa3d6b-5e1a-4d95-911e-22279cdb9bf0)

    In his account of the Thackaringa sulphide ore, Lawrence (p. 92) reports the presence of valleriite as a minor accessory in chalcopyrite. He says that it is readily identified by its intensive anisotr

    Jan 1, 1967

  • CIM
    Encapsulation of Mercury in Gossan Tailings Murray Brook Mine, New Brunswick, Canada

    By Robert Harris, Peter Pheeney

    "The Murray Brook gold mine operated from September 1989 to March 1991. Approximately 1.2 million tonnes of gossan were mined from an open pit and treated at a rate of 900 tonnes per day. The facility

    Jan 1, 2001

  • CIM
    Cyanidation of a High Gold Flotation Concentrate

    By J. A. King, D. A. Knight

    "The Porgera orebody is located in mountainous terrain in Enga Province, Papua New Guinea. An underground mine has been developed which produces up to 2000 t/d of ore grading over 2 ozs Au/t. Some 79%

    Jan 1, 1992

  • AUSIMM
    Are Blasthole Samples that Bad and Reverse Circulation Samples that Good for Open Pit Grade Control? Story of a Trade-Off

    Past arguments advocating reverse circulation sampling against blasthole sampling are reviewed to present the debate under a different light. The advantages and disadvantages of each drilling method a

    Mar 1, 2010

  • AUSIMM
    Paste Backfill for Enterprise Mine

    By D Morrison, P Goodman

    The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cur

    Jan 1, 1998

  • SAIMM
    Continuous Blasting Improvements At Landau Colliery ? Synopsis

    By M. Rakoma

    Following the blasting fatality on 17 December 2009, Landau Colliery was forced to change from the blasting practices that had been utilized since the start-up of the mine. Since then, attempts have b

    Jan 1, 2013

  • NIOSH
    IN FOCUS?Cable bolts: a ?new support?

    By Thomas P. Mucho

    Cable bolts are emerging as the newest ?twist? for roof support in U.S. underground coal mines. For decades cable bolts installed in underground metal mines in the United States and Canada used cement

    Jan 1, 1998

  • AIME
    Mining - Interference Loads in Bedded Sequences

    By L. Adler

    Two basic cases involved in the design of an opening in bedded rock are: 1) where the beds deflect from each other so as to be separated; and 2) where the beds deflect onto their lower neighbor, loadi

    Jan 1, 1961

  • SAIMM
    The use of indirect distributions of selective mining units for assessment of recoverable mineral resources designed for mine planning at Gold Fields’ Tarkwa Mine, Ghana

    By J. Searra, M. Aboagye

    "For new mining projects or for medium- to long-term areas of existing mines, drilling data is invariably on a relatively large grid. Direct estimates for selective mining units (SMUs), and also for m

    Jan 1, 2015

  • AUSIMM
    Gold Potential, Mining and Processing of Turkey

    This article focuses on TurkeyÆs gold potential with respect to exploration, development and operation after 1985. Apart from TurkeyÆs geology, which offers a substantial number of volcanic-associated

    Jan 1, 2007