Recovery of Copper from Industrial Waste Solutions by Cementation Using a Rotating Fixed Bed of Stacked Steel Screens Mining, Metallurgy and Exploration (49f84ae3-0f8b-4994-9964-9738b8967d3e)
By G. H. Sedahmed, S. A. Nosier, M. H. Abdel-Aziz, A. A. Mubarak, M. A. El-Naggar, E. G. Abdel-Aziz
The performance of a rotating fixed bed reactor in recovering copper from industrial waste solutions by cementation is studied under various conditions. The rotating fixed bed is made of stacked woven
-
Recovery of Copper from Industrial Waste Solutions by Cementation Using a Rotating Fixed Bed of Stacked Steel Screens Mining, Metallurgy and Exploration
By G. H. Sedahmed, S. A. Nosier, M. H. Abdel-Aziz, A. A. Mubarak, M. A. El-Naggar, E. G. Abdel-Aziz
The performance of a rotating fixed bed reactor in recovering copper from industrial waste solutions by cementation is studied under various conditions. The rotating fixed bed is made of stacked woven
-
Effective Planning Of Underground Space?Planning And Implementation Of The First Underground Water Reservoirs In Hong Kong
By T. H. Chan
As the University of Hong Kong and their advisors planned their new Centennial Campus it became clear that they would have to re-provide existing water reservoirs on an adjacent site with new salt wat
-
World’s largest hydraulic shovel, O&K’s RH 300, now operating at Chuquicamata, world’s largest copper mine
By Tim Neil, O&apos
Large is the applicable adjective here. The largest hydraulic shovel in the world, the largest copper mine in the world, the largest copper producing company in the world. The O&K RH 300 hydraulic
Jan 1, 1988
-
Lake Mead intake No. 3: TBM tunneling at high pressure
By Erika Moonin, Jim Nickerson, Claudio Cimiotti, Roberto Bono
"In response to the severe drought on the Colorado River basin and in order to preserve existing water capacity to the Las Vegas Valley, the Southern Nevada Water Authority contracted a new deep-water
Jan 1, 2015
-
Recycling Power Plant Fly Ash And Its New Application For Construction Materials - Preprint 09-037
By N. S. Kim
Economically favored Cr and Cu leaching out process from spent power plant fly ash (PPFA) had been investigated. PPFA, bearing of C, S, V, Ni, Cu and Cr, has been widely used as an assistant fuel in c
Jan 1, 2009
-
Toxic effects of deep-sea mining - can we apply shallow-water standard toxicity test protocols to the deep sea?
By Marina Carreiro-Silva, Cátia Cardoso, Bruce Shillito, Lisa Mevenkamp, Alastair Brown, Maria J. Bebianno, Juliette Ravaux, Inês Martins, Nélia C. Mestre, S. Sousa Vânia
Mineral extraction activities in the deep sea will expose the local fauna to potentially toxic compounds. However, very few data are currently available on the complex ecotoxicological risks to deep-s
Sep 1, 2014
-
The Influence of a Continuous Mining Machine and Roof/Rib Mesh on Magnetic Proximity Detection Systems Mining, Metallurgy and Exploration
By Jacob Carr, Christopher C. Jobes, Chenming Zhou, LaTasha R. Swanson, Jennica Bellanca, Jingcheng Li
Magnetic proximity detection systems (PDSs) are used with continuous mining machines (CMMs) to protect miners from striking and pinning accidents. Generators are used in a PDS to create magnetic field
-
The Influence of a Continuous Mining Machine and Roof/Rib Mesh on Magnetic Proximity Detection Systems Mining, Metallurgy and Exploration (f3f9caae-7ddd-4734-aba6-75a1893d7f35)
By Jacob Carr, Christopher C. Jobes, Chenming Zhou, LaTasha R. Swanson, Jennica Bellanca, Jingcheng Li
Magnetic proximity detection systems (PDSs) are used with continuous mining machines (CMMs) to protect miners from striking and pinning accidents. Generators are used in a PDS to create magnetic field
-
The Dulles Corridor Metrorail Project—Extension to Dulles International Airport and Its Tunneling Aspects
By V. Gall, J. Rudolf
The Virginia Department of Rail and Public Transportation and the Metropolitan Washington Airports Authority are undertaking the extension of Washington Metropolitan Area Transit Authority’s Metrorail
Jan 1, 2007
-
Past, Present, and Future of Texas Industrial Minerals Mining, Metallurgy and Exploration
By Brent A. Elliott, J. Richard Kyle
Texas is a major producer of industrial mineral resources required by the state’s ever-growing population that now exceeds 28 million. Texas typically ranks in the top three states for the value of no
-
The Importance Of Water Utilization For Maximizing Grinding Circuit Classification System Efficiency - Preprint 09-067
The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill?s grinding performance. The factors which affect cir
Jan 1, 2009
-
Landslides, Drought, And Brown Trout In The Red River, NM
By D. Conklin
Annual fish monitoring of the Red River, NM from the town of Red River to downstream of Questa, NM has been conducted since 1997. This long-term dataset, sponsored by the Chevron Mining Inc. Questa M
Jan 1, 2011
-
Amax Uses Practical Approach to Dewatering at Its Sleeper Mine
By W. David Tyler
Any mining or engineering-construction excavation that extends below the water table must be dewatered. In many situations, the ground is of low permeability or the workings extend only a short distan
Jan 1, 1991
-
Analyses Of Tunnel Stability Under Dynamic Loads
By B. Oraee
Tunnels as any other structures are affected by different loads and stresses. Generally, the loads on tunnels consist of both static and dynamic loads. These loads must both be considered in the tunne
Jan 1, 2011
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)
By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration
By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Constructing the Airside Road Tunnel, Heathrow Airport
By John Corcoran
INTRODUCTION Content of this Report The 1300m long twin-bore 8.1m diameter Airside Road Tunnels (ART) were excavated beneath the busy taxiways and stands of Heathrow Airport between 2002and 20
Jan 1, 2005
-
IntelliMine - Innovative technologies and concepts for the sustainable and intelligent Deep Mine of the future
By H. Hejny
"The mine of the future will exploit mineral raw materials at greater depths than today, requiring completely different approaches compared to today’s deep mines, in order to get mineral rights. Only
Jan 1, 2011
-
The DC WASA Anacostia River CSO Control Tunnel Project
By David C. Girard, Larry Williamson, Leonard R. Benson, Ronald E. Bizzarri
On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and floo
Jan 1, 2007