Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Measuring Blast Movement to Reduce Ore Loss and Dilution

    By Darren Thorton, David Sprott, Ian Brunton

    Blasting causes movement of the rock and can be detrimental to the accurate delineation of the ore and waste regions within the resulting muck pile. The consequences can be ore loss and dilution. Howe

    Jan 1, 2005

  • ISEE
    Blast Design & Diagnostics Using Portable Solid State, High-Speed Videography Systems

    By Laura Bastemante, Bruce Vandenberg, Fred Huettig

    Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to loo0 frames per second. Up to 8 seconds of data can

    Jan 1, 1997

  • ISEE
    Wipfrag and Wipjoint - To Measure, Record and Predict Blast Results

    By John A. Franklin, Tom C. Palangio, Norbert H. Maerz

    WipFrag systems I and II have become the world standard in photoanalysis systems to measure fragmentation. Mines, quarries and excavating contractors can now easily measure blast results and track the

    Jan 1, 1997

  • ISEE
    Digital Detonators keep PA Coal Mine Operating

    By Douglas Bartley, Jay Elkin

    The state of Pennsylvania was at one time one of the leading coal producing states in the east. However, legislation and industry trends over the last 10 years have adversely affected the amount of bi

    Jan 1, 2003

  • ISEE
    Structural Response of Brick Veneer Houses to Blast Vibration

    By Adrian Moore, John Wilson, Alan Richards, Emad Gad

    Project C9040 – ‘Structure Response to Blast Vibration’, funded by the Australian Coal Association Research Program (ACARP), involved the investigation of the structural response from blast vibration

    Jan 1, 2003

  • ISEE
    Blasting Mitigation Measures Used to Control a Highwall Failure Risk

    By Jean-Sébastien Lambert, Joseph Kabuya, Richard Simon

    Managing a highwall failure risk in an open pit mine by controlling and mitigating the impact of vibrations produced by blasting operations is key to achieving safe and cost-effective operations. The

  • ISEE
    Analysis and Design of Blastwalls to Protect Public Structures From Malevolent Explosions

    By Dale Preece, Steven Sobolik, Richard Jensen

    Recent events demonstrate that civil and government facilities and structures face an ever-increasing need to be designed for protection against malevolent explosions. Modification of existing public

    Jan 1, 2000

  • ISEE
    The Actual Cost of Hole Deviation to the Mining Industry - A case Study at Nkana Division of the Former Zambia Consolidated Copper Mines Limited

    By Sam Kangwa, Thomson Sinkala

    In the mining industry, drilling accuracy has a significant effect on the economy of operations. In this paper, results from the Nkana Division of the former Zambia Consolidated Copper Mines are prese

    Jan 1, 2004

  • ISEE
    Next Generation Laser Surveying Systems! Blast Design and Analysis Software

    By Steve Colbum

    LTl’s MapStar LPS (laser positioning system) utilize both tripod mounted and hand held reflectorless distance meters. These are eye safe, easy-to-use, and specifically designed to endure the harsh env

    Jan 1, 2000

  • ISEE
    Sequence of Events During a Blast

    By Patrice Favreau, R. F. Ph. D. Professor Emeritus Favreau

    After Nobel invented dynamite, blasts were carried out by trial and error, without the use of equations based on the fundamental principles of Chemistry and Physics, although everyone accepted that sh

  • ISEE
    Techniques to Assess the Influence of Blast Design Parameters on Airblast and Blast Vibration

    By Robert Hivick, Frank Sames

    The control of environmental effects, especially blast vibration and airblast, has become a dominating planning criterion for most surface blasting operations. Compliance with existing regulations is

    Jan 1, 1999

  • ISEE
    New Lightweight Dragline Buckets

    By Rowan A' Murry Karstel

    One way to ensure dragline productivity is by Increasing the size of the dragline bucket. In August 1994, Optimum Colliery in conjunction with Van Reenen Steel, Northwest Applied Technology, SSAB of S

    Jan 1, 1998

  • ISEE
    Journal: Fifty Years in Explosive Engineering The Story of a Determined Immigrant

    By Milos Bila

    The second half of 2008 and the first half of 2009 brought up important anniversaries. My old passport from Czechoslovakia has a stamp with date 10-10-1968 at 10:00 AM, the exact time I crossed the bo

    Jan 1, 2010

  • ISEE
    Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures

    By Ewan Selers, Gary Cavanough

    Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech

    Jan 1, 2016

  • ISEE
    Analysis of Parameters of the Ground Vibration Produced by Bench Blasting at a Boron Open Pit Mine in Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Mehmet Aksoy, Kagan Ozdemire

    With increasing environmental constraints on the levels of disturbance induced by blasting operations upon nearby residents, there is an increasing need to be able to design cautious blasting with gre

    Jan 1, 2005

  • ISEE
    Geotechnical Influences on Blast Induced Stress Wave Propagation, Copper Cliffs, Ontario

    By Roger S. Jackson

    "This study interprets vibrations produced by single underground shots, recorded on surface by 135 digital seismographs laid out in four linear arrays. Several vibration anomalies were observed and ar

    Jan 1, 2010

  • ISEE
    Energy-based Vibration Predictor Equations and Blast Damage Index for Blasting Gallery Panels

    By Sri C. Sawmliana, P. Pall Roy

    Damage to underground roof and pillars in blasting gallery (BG) panels has been an increasingly important area of study in recent years due to the invention of new explosives and cord systems which ha

    Jan 1, 2004

  • ISEE
    "Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"

    By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo

    For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish

    Jan 1, 2016

  • ISEE
    Applied to a High Risk Case History

    By C Agreda

    The Cushion Blasting Technique applied to solve the high risk case history represented by a 10,704 TM rock locate at 120 M from the hydroelectrical plants of 350 KV each, is described, analyzed and di

    Jan 1, 2005

  • ISEE
    Evaluating Airblast Damage Complaints

    By Lawrence W. Gubbe

    Air blast associated with detonation of explosives in mining, construction or military applications is often responsible for complaints by people who live or work in the vicinity of the activity. Most

    Jan 1, 2004