Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    ntroduction of the Autoloader at Mattagami Lake Mines

    By G Anders

    The mucking out of sub-level headings by slusher and by Autoloader is described, and the performance and costs of both methods are compared. The introduction of the Autoloader is taken as an example t

    Jan 1, 1965

  • CIM
    Design and Operation of the Key Lake Uranium Mill

    By M. Neven, R. A. Steane, E. Lam

    "The Key Lake uranium mill is located in Northern Saskatchewan. It treats a high grade, complex uranium and metal sulphide ore. The plant and process are in many respects unique, because commercial tr

    Jan 1, 1986

  • CIM
    The activation of magnesia in serpentine by calcination and the chemical utilization of asbestos tailings-a review

    By R. Le Houillier, M. Nagamori, A. J. Plumpton

    "Asbestos tailings are a typical serpentine, hydrated magnesium silicate, consisting primarily of antigorite and a few per cent of unrecovered fibrous chrysotile. Serpentine has unique thermal propert

    Jan 1, 1980

  • CIM
    Antamina Productivity Increase through Improvements Implemented in the Primary Crushing

    By Carlos León, David Estrella, Javier Linares

    "Recently, Antamina has completed an expansion program of its operations which increased the thoughput in grinding from acapacity of 109 to 130 ktpd. After commissioning, throughput could be exceeded

    Jan 1, 2013

  • CIM
    Self-Tuning Flotation Control at Brunswick

    By M. W. Franklin, D. W. Hendriks

    "Changing ore types, feed grades and c1rculat1ng loads are some of the many factors that can make flotation feed-back control difficult. To control a flotation circuit using conventional fixed-paramet

    Jan 1, 1986

  • CIM
    Radium-226 removal from a uranium mill effluent-physical/chemical treatment process development studies

    By R. Webber, D. Averill, L. Whittle, D. Moffeti, G. Kassakhian

    "This paper describes the recent pilot-plant work carried out on two alternative processes capable of producing an effluent containing less than 10 pCi/L total radium-226 activity and very close to 3

    Jan 1, 1980

  • CIM
    The Flin Flon Zinc Plant

    By John D. Carr

    Introduction The Flin Flon zinc plant operates on what is known as the low density or standard sulphate process, that is, the zinc is carried through the plant solution circuit attached to the SO4 or

    Jan 1, 1935

  • CIM
    A New Tool for Sag Hardness Testing

    By Glenn Kosick, John Starkey, Glenn Dobby

    "A practical new test has been developed for SAG hardness determination. Using two kilogram samples of minus one inch diamond drill core or crushed muck samples, the Starkey SAG Test has been shown to

    Jan 1, 1994

  • CIM
    A First Step towards Gas Dispersion Management: Manipulation of Gas Distribution in Flotation Circuits

    By James A. Finch, Jason S. Doucet, Cesar O. Gomez

    "Exercising control over the physical environment of flotation as a step towards process optimization is the driving force for characterizing gas dispersion in flotation cells, a subject of considerab

    Jan 1, 2006

  • CIM
    Visualization of Fine Bubbles and Their Role in Fine Particle Flotation

    By Wei Sun, Jaewon Choung, Zhenghe Xu, Zhangming Cui

    "High intensity conditioning has been demonstrated in a number of cases to enhance fine particle flotation. The improvement could be attributed to the enhanced formation of particle aggregates. Howeve

    Jan 1, 2006

  • CIM
    Waste dump management at Quintette Coal Limited

    By W. P. Tassie

    "The location of Quintette Coal Limited's pit and geologic nature of the dedicated reserves combine to introduce a number of factors which can adversely affect waste dump stability. These factors

    Jan 1, 1988

  • CIM
    La Fabrication de fer Préréduit Pour Utilisation au Four à Arc Électrique

    By A. H. Marquis

    Since the start-up of its first Direct Reduction Module in April 1973, S1DBEC has produced over 2 million tons of prereduced iron. During this period, SIDBEC has acquired comprehensive experience in t

    Jan 1, 1979

  • CIM
    Froth Based Indicators as a Tool for Flotation Diagnosis

    By Patrick Pelletier Jr., Pierre-Alexandre Bossé, Gianni Bartolacci, Ian Orford, Steve Parent

    "Over the last decades, many authors have shown the importance of froth in the flotation process. Mineral recovery is related to froth recovery and flotation. Selectivity is affected by froth characte

    Jan 1, 2006

  • CIM
    Use of gravity drainage and quasi-homogeneous dykes for containment of oil sand tailings (df9a2317-173a-4976-8412-bf4feb957a4f)

    By L. Nichols, H. Keele, K. Czajewski

    "The oil sands industry in northern Alberta disposes of the by-products of bitumen extraction into tailings ponds. The mix of tailings sand and mature fines, with gypsum added as a flocculent, constit

    Jan 1, 2008

  • CIM
    Optimization of the Xstrata Copper-Horne Smelter Operation Using Discrete Event Simulation

    By J. M. Simard, S. Morissette, P. Coursol, P. Mackey

    A new, powerful model is presented that focuses on plant logistics and scheduling aspects of the smelting, converting, fire refining and casting operations at the Horne smelter. This plant complex is

    Jan 1, 2009

  • CIM
    An interpretation of regional northwest-southeast folding in North America with special emphasis on Ontario: Structural and economic implications

    By S. V. Burr

    "A 28-year study of cross folds leads to the conclusion that the northwest-southeast folds recognized in many areas of North America are part of a regional pattern. Detailed examination of over 650 ge

    Jan 1, 1980

  • CIM
    A Dual Bound Approach To Damage-Based Finite-Element Modeling Of Tube Hydroforming

    By C. Butcher

    Numerical simulations of straight tube hydroforming of a dual phase steel were performed using both upper and lower bound constitutive models for porous ductile materials. The Gurson model is based up

    Jan 1, 2010

  • CIM
    Automatic Control at the Strathcona Concentrator for Presentation to the Canadian Mineral Processors

    By D. M. Doyle

    "The Strathcona Concentrator operations, the application of control systems in the crushing, flotation and tailing fill sections, and current and future computer control concepts are described in this

    Jan 1, 1974

  • CIM
    Plant Scale Trial of Isobutyl Xanthate at Raglan Concentrator Using Reference Distributions

    By Norman O. Lotter, Dominic Fragomeni, Lori J. Kormos, Guy Comeau, Antonio Di Feo

    "A performance opportunity was identified for the Raglan concentrator operation by changing the selection of xanthate from Potassium Amyl Xanthate (PAX) to Potassium Isobutyl Xanthate (PIBX). This opp

    Jan 1, 2009