Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Doing More with What We Already Know – Improving the Efficiency of Minerals Processing
By Joe Pease
"The demand for minerals and metals is increasing. Head grades of ore bodies are dropping. Remaining ores are becoming finer grained, more complex, and more logistically challenging. Mineral processin
Jan 1, 2015
-
Intelligence for Grouting Balance
By J. A. López-Molina, S. García, V. Castellanos-Pedroza
"Grouting aims to reduce the permeability of rock mass below a predetermined value and has been widely used in rock engineering field for a long time. However, the injection procedure needs several em
Jan 1, 2015
-
The Use of Gas Dispersion Measurements to Improve Flotation Performance
By Jan E. Nesset, Antonio DiFeo, James A. Finch, Jose Hernandez-Aguilar, Cesar O. Gomez
"The gas dispersion measurement sensors and methodology developed by the mineral processing group at McGill University have to-date been employed at a number of plants in Canada, Australia, the U.S.,
Jan 1, 2005
-
Statistical Multi-Scale Method of Mechanics Parameter Prediction for Rock Mass
By J. Z. Cui
In this paper a statistical multi-scale method for the mechanics parameter prediction of the rock mass with random distribution of multi-scale cracks/joints is presented. First the micro-structure of
May 1, 2009
-
Managing Pit Slope Displacements: Highland Valley Copper?s Lornex Pit Southwest Wall
By H. Warren Newcomen
The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s
May 1, 2002
-
Extension of the Comminution Energy Curves and Application to Stirred Milling Performance
By P. Radziszewski
"The comminution energy curve is a profoundly simple graphical technique that displays detailed operating efficiency information for industrial comminution processes. The database underlying the meth
Jan 1, 2016
-
Determination of Silver Bearing Minerals in the Lady Loretta ore
By Donald Leroux, Dave Scott, Giovanni Di Prisco
"The Lady Loretta lead-zinc deposit in Northwest Queensland, Australia contains an average of 5.9% lead, 17.1% zinc and 97 g/t silver. Ore mineralization is mostly comprised of fairly complex intergro
Jan 1, 2002
-
Successful Treatment of Complex Feeds through the Isasmelt™ and Albion Process™
By S. Nikolic, G. M. Stieper, D. P. Mallah, B. J. Hogg, P. B. Voigt
Copper feed materials processing is becoming more challenging, due to an incremental increase in the mineralogical and compositional complexity of these feeds. These complex and polymetallic feeds are
Jan 1, 2019
-
The Winning of Clays and Shales
By J. F. McMahon
Introduction The greater portion of the information presented in this paper was obtained in the course of an investigation on clay gathering and its cost in the provinces of Quebec and Ontario (1). F
Jan 1, 1933
-
Application of the Woodgrove Staged Flotation Reactor (SFR) Technology at the New Afton Concentrator (48th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 2016)
By K. Swedburg, M. Samuels
"The New Afton concentrator was commissioned in June 2012, reaching the design milling rate in September 2012. By late 2013, through a campaign of optimization and de-bottlenecking, it was recognized
Jan 1, 2016
-
Salitre Project Brazil
By Roberto Busato Belger
- Fertilizer Business Overview - Supply -Demand Balance in the World - Supply -Demand Balance in Brazil - Brazilian Market Growth Opportunities - Fosfertil Operations - Fosfertil Expansion Plan
May 1, 2010
-
The Pogo project: flowsheet development and design
By Eric Konigsmann
"The Pogo project is located on the Goodpaster River, 38 miles north of Delta Junction in east central Alaska. Sumitomo Metal Mining and Teck Corporation are planning to develop a 2,500 ton per day un
Jan 1, 2002
-
Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill Expansion
By D. B. Felsher
"Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill
Jan 1, 2015
-
A Review of Gas Dispersion Studies in Flotation Plants
By Jan E. Nesset, Julie Fournier, Jorge Torrealba, Colin Hardie
"Gas dispersion studies have been used to benchmark and optimize plant flotation performance for more than a decade, although this technology is not as widely in use as it likely should be based on th
Jan 1, 2015
-
Comparison of Flotation Grade Dynamics Enabled By Real-Time Measurement
By F. E. du Plessis
"The distinction between data suitable for process control and data subject to aliasing only becomes quantifiable with the availability of rapid real-time measurements. Expecting the dynamics of flota
Jan 1, 2012
-
Application of On-Line Visualization To Flotation Systems
By Jacob Masliyah, Zhiang Zhou, Dharamdat Christendat, Tshitende Kasongo, Kevin Hyland, Zhenghe Xu, Ted Kizior, Douglas Cox
"A novel on-line visualization system, previously developed at Syncrude Canada Ltd., has been modified to characterize rising bubbles, particles and particle-bubble aggregates in a flotation process.
Jan 1, 2000
-
Parallel Surface Fan Operation At Hoyle Pond Mine
By M. Desjardins
The Hoyle Pond underground mine, located in the Porcupine Gold Camp, east of the city of Timmins, Ontario, Canada, is the cornerstone of Goldcorp Canada Ltd?s Porcupine Gold Mines. Cut and fill, shrin
Aug 1, 2013
-
Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials
By E. Fried
Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa
May 1, 2007
-
Electrical Model of an Electrowinning Circuit Including Stray Current through Electrolyte Piping
By S. C. Richardson
The electrowinning (EW) circuit involves using DC current in the electro-deposition of metal ions dissolved in an electrolyte solution. This paper reviews a method to generate an electrical model of a
Jan 1, 2019
-
The Use of Mine Sequencing Controlled Through Numerical Modelling and Instrumentation to Destress a Highly Burst Prone Sill Pillar - Draft
In order to maintain a production rate of 6,000 tonnes per day from underground at the Williams Operating Corporation, two independent mining areas were required which created a long narrow sill pilla
Apr 1, 2005