The Pretreatment and Leaching of ChalcopyriteBy I. H. Warren, F. A. Forward, A. Vizsolyi
"Observations are reported on the pressure leaching of material produced by subjecting chalcopyrite to two types of heat treatment. Calcination of the mineral at 825°C, in the absence of oxygen, induc
Jan 1, 1968
-
Vanadium and Molybdenum Recovery from Industrial Wastes Using Cybber Ion Exchange ResinsBy A. Tikhonov, D. Kipper, V. Korovin, A. Olifirenko, Yu. Shestak
The present paper deals with vanadium and molybdenum sorption from industrial wastes and intermediate processing products using Cybber macroporous strong- and weak-base anionites. Vanadium and molybde
Jan 1, 2011
-
Using a Pit Optimization Tool to Calculate Oil Sands Mining InventoryBy L. Chunpongtong
ABSTRACT Oil sands production occurs on a massive scale, making orebody estimation a challenge. In rainy conditions, operators can have difficulty accessing ore at the mapped location. Without enough
Jan 1, 2014
-
Silica Removal from Uranium Process Streams by Polyethylene Glycol CoagulationBy B. Dyck, L. Verhelst
"Colloidal silica in Key Lake’s Solvent Extraction (SX) feed solutions has presented an operational problem for the mill throughout its history. The colloidal silica stabilizes aqueous continuous emul
Jan 1, 2018
-
Fluid Dynamics Studies of Bottom-Blown and Side-Blown Copper Smelting FurnacesBy Z. X. Cui, X. D. Ma, L. Contreras, X. Jiang
The bath smelting process is one of the key techniques applied in the current copper smelting production, which includes bottom-blown and side-blown furnaces differently from the direction of gas inje
Jan 1, 2019
-
HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground "CIM Connect 2025"By Karl Dufresne
Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron
Oct 1, 2024
-
The Geological Survery of CanadaBy F. W. Gray
Foreword: It is not my purpose, in this address, to write the history of the Geological Survey of Canada, which has from time to time been reviewed by the officers of the Survey itself, and by men m
Jan 1, 1932
-
Evaluation of E.M. Anomalies at SOQUEMBy E. Gaucher, M. St-Amant
"Among the electromagnetic surveys performed by SOQUEM in the last three years, a certain number of the more instructive cases have been chosen to illustrate the theory of electromagnetism by field ex
Jan 1, 1970
-
Investigation of Hydrodynamic Flow in Heap Leaching Using a CFD Computational ModelBy J. E. Gebhardt, D. McBride, M. Cross
Heap leach processes can encounter diverse flow conditions, such as infiltration into dry ore material, drainage, perched water tables and heterogeneous materials, leading to large variations in perme
Jan 1, 2014
-
The Development of Mine Revegetation Protocols for the Hudson Bay Lowland, CanadaBy D. Campbell
Mining activity is increasing in northern boreal and subarctic regions of Canada. This is the case in the far north of Ontario, especially in and near the Hudson Bay Lowland (HBL). De Beers Canada ope
Aug 1, 2013
-
Energy Conservation Measures at Syncrude Oil Sand Processing OperationsBy George J. Cymerman
Since 1978, Syncrude Canada Ltd. has been expanding steadily its oil sand mining and processing capacity while reducing unit energy requirements. At the current rate of ~180 M tonne/year oil sand, the
May 1, 2006
-
Coal Valley MineBy J. Keith Haddock
"Introduction The Coal Valley Mine is operated by Luscar Stereo (1977) Ltd. with the Alberta Energy Company having a minority interest. The mine produces 2.0 million tonnes of bituminous thermal coal
Jan 1, 1985
-
Essais de la diminution des rejets miniers par la séparation du stérile en milieu dense"Le présent article porte sur la diminution des rejets de concentrateurs produits durant l’exploitation et le traitement des minerais métalliques.Le minerai dilué envoyé au traitement a, très souvent,
Jan 1, 1997
-
Why Aren?t We Using More Thermal Coal in Canada? ? The Real ReasonsBy Roger K. M. Bellows
The last coal-fired power plant to be built in Canada came into operation in 1994. Since then, Canada?s electricity requirements have grown substantially but no new coal-burning plants have been built
May 1, 2001
-
Controlled Precipitation of Nesquehonite (MgCO3.3H2O) by the Reaction of MgCl2 With (Nh4)2CO3 At 303 KBy Y. Wang
In this study, homogeneous (unseeded) precipitation of nesquehonite (MgCO3.3H20) by the reaction of MgC12 with (NH4)2CO3 in supersaturated solutions at 30 °C was investigated. Factors which influence
Jan 1, 2007
-
A review of INCO’s mining automation efforts in the Sudbury BasinBy P. V. Golde, R. A. Poole, G. R. Baiden
"INCO is committed to proceed into the next century using automation and robotics to achieve safety and productivity goals necessary to enhance its competitive position. Stobie Mine, decades old, is t
Jan 1, 1998
-
Experimental Design Approach to the Effects of Chemical Composition on the Mechanical Properties and Machinability of Near-Eutectic Al-11%Si Casting AlloysBy Y. Zedan
In this study, the statistical design of experiments (DOE) was applied to study and regulate the properties of near-eutectic Al-11%Si alloys. Develop regression equations for such response variables a
Jan 1, 2011
-
Reasonable Prospect of Economical Extraction: Tools for Underground Mineral Resource ClassificationBy Juan Asalgado
The JORC and NI43-101 codes impose that mineralized material has a reasonable prospect of economical extraction to be classified as Mineral Resource. For deposits close to surface and amenable to op
Oct 1, 2009
-
The Spectrographic Laboratory of the Hudson Bay Mining & Smelting Co.By D. L. Griffith
THE realization by metallurgists of the important effect that traces of impurity may have upon the properties of a metal, and their steady demand for purer and still purer metals, have made the specia
Jan 1, 1940
-
Feasibility of iron recovery from Mount Wright tailing materialBy John A. Meech
"Oleic acid flotation of Mount Wright thickener underflow tailing material has been shown to be capable of increasing plant recovery by 3%. High levels of oleic acid addition (1.5 kg/t) are required,