Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Foreword (7965683f-3b26-4771-bc18-123c6df66373)

    In late 1984, Council of the Australasian Institute of Mining and Metallurgy accepted a proposal to establish a Mineral Heritage Committee. This was to be involved in matters relating to mineral he

    Jan 1, 1987

  • AUSIMM
    Broken Hill - A Test Bed for Geology and Technology

    By D H MACKENZIE

    In common with several great orebodies and mineral camps around the world Broken Hill has been the subject of state-of-the-art technical and scientific scrutiny during its long working life. During

    Jan 1, 1992

  • AUSIMM
    The Central Eyre Iron Project – Process Selection and Design

    By D Connelly

    The Iron Road Limited Central Eyre Iron Project (CEIP) area, located on the Eyre Peninsula of South Australia, covers extensive Archaean iron formations that occur as coarse-grained magnetite bearing

    Jul 11, 2011

  • AUSIMM
    The Status of Risk Management in Australian Mining - A Best Practice Review

    In October 2005 Phelps Dodge mining, a US based company, visited several Australian mining companies and mine sites to ascertain the current applications of risk management methods in the organisation

    Jan 1, 2006

  • AUSIMM
    Development of the Sao Chico Gold Project, Brazil - ABSTRACT ONLY

    The Sao Chico gold project is located on the Tocantinzinho trend which is the most mineralised zone in the Tapajos Mineral Field of Brazil (see Figure 1). The Tapajos goldfi eld was the site of the bi

    Aug 1, 2010

  • AUSIMM
    Bursts in Coal at Leichhardt Colliery, Central Queensland and the Apparent Benefits of Mining by Shotfiring

    By Hanes J

    More than 200 bursts in coal occurred at Leichhardt Colliery prior to December 1978 during mine development in the 6 m thick Gemini seam at depths approximating 400 m. Three large bursts each displ

    Jan 1, 1980

  • AUSIMM
    ICP Analysis In Geochemical Prospecting-1

    In the late 1970's Western Mining Corporation, Exploration Division considered the purchase of a major multi-element spectrometer as an adjunct to our existing atomic absorption spectrophotom

    Jan 1, 1987

  • AUSIMM
    Monitoring Indices for the Support and Surrounding Strata System on a Longwall Face

    By He F, Zhu D

    How to monitor and control the support and surrounding strata system on a longwall face effectively is one of the major research problems in ground control. Based on observations on movements of t

    Jan 1, 1992

  • AUSIMM
    Recent Developments in the Gravity Concentration of Gold at Peko Mines LTD, Warrego N.T.

    From August 1962 to June 1976 Peko Mines Ltd. produced Gold Bullion at the Peko Control Mill using 18x24 Denver Mineral Jigs and strake tables. Gold ores treated during this period were obtained fr

    Jan 1, 1978

  • AUSIMM
    The Underground Fire, Sealing and Subsequent Recovery of Liddell State Coal Mine

    On Monday, October 25th, 1971 at approximately 12.15 a.m. the night shift proceeding underground discovered smoke at No.1 and No-3 cut throughs on the eastern side of the belt heading and in close

    Jan 1, 1972

  • AUSIMM
    Saxonvale Mine Development a Case Study in Project Planning and Project Management

    Saxonvale mine is a multi bench open pit coal mine developed to its Stage I capacity of 1.75 Mt/y of run of mine coal. Detailed engineering studies for the mine commenced in April 1980, approval t

    Jan 1, 1983

  • AUSIMM
    Linking Mineral Resource and Ore Reserve classification with technoeconomic study levels and forecast relative accuracy

    By D Reid, J McKibben, M Noppe

    International mineral disclosure standards and guidelines aligned with the CRIRSCO (Committee for Mineral Reserves International Reporting Standards) template were developed to inform stakeholders abo

    Mar 22, 2022

  • AUSIMM
    A Liberation Study of Autogenous and SAG Mills

    By Hayward N, Sutherland D, Wilkie G

    A pilot plant study has been made of the liberation characteristics of a nickel ore under different milling conditions. A series of runs were made ranging from fully autogenous grinding to semi-auto

    Jan 1, 1991

  • AUSIMM
    Pelletisation of New Zealand titanomagnetite ironsand for hydrogen direct reduction

    By B H. Yin, S Mendoza, M Nusheh' C W Bumby, A Zhang

    Hydrogen-direct-reduction of iron ore in a vertical shaft furnace is a potential process that could significantly reduce CO2 emissions from the steel industry. This approach requires the pelletisation

    Sep 18, 2023

  • AUSIMM
    Long-Hole Drilling for In-Seam Exploration

    By Hungerford F

    Long-hole drilling technology has rapidly advanced this decade beginning with rotary drilling/pump down camera surveying and culminating in down-hole motor drilling with cableless electronic surve

    Jan 1, 1988

  • AUSIMM
    Application of a Truck Simulation Model at Mt. Whaleback Mine

    By Butters S. E, Deslandes J. V

    The selection of loading and haulage equipment in a proposed or oper- ating mine is vital in ensuring the cost effective achievement of produc- tion targets. To assist in the evaluation of different h

    Jan 1, 1989

  • AUSIMM
    Leaching of Gold-Copper Ores Using Ammoniacal Cynide

    By Corrans I. J

    A wide variety of copper-bearing gold ores exist throughout the world which have yet to be processed economically for gold recovery. The copper minerals present in these ores can be many and varied

    Jan 1, 1992

  • AUSIMM
    Fragmentation Assessment Using the FragScan System: Quality of a Blast

    By B Tessier

    Checking the quality of a blast may be considered as subjective. Checking this quality will require measuring objective parameters. One of them is the resulting fragmentation of the blasted product. N

    Jan 1, 2001

  • AUSIMM
    The Economic Consequences of Drill Hole Deviation in Crushed Aggregate Production

    For many crushed aggregate producers will the finest fraction minus 4 mm represent a problem. The fine material will fetch a much lower price than the coarser products, and may even be difficult to se

    Jan 1, 1999

  • AUSIMM
    Model Studies of Mining Pillar Stability

    By Szwedzicki T

    Uniaxial testing was performed on model pillars to determine the effect of width to height ratio on pillar and surrounding rock mass stability. Samples were modelled in a shape similar to that of du

    Jan 1, 1994