Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An Application Of Tree Classification Method In Analysis Of Longwall Shield Stability
By Yong-Ming Jiang
Longwall mining systems are extremely complex and expensive and require great caution for reliable and efficient operation. In many cases, ground control problems are the primary concern in longwall m
Jan 1, 1993
-
Geotechnical Constraints On A 6 M Single Pass Longwall
By Ross W. Seedsman
The feasibility of 6 m high single pass longwalling has been studied using Newlands Mine as a case study An intensive geological investigation identified a range of hazards but a mine layout was possi
Jan 1, 1992
-
Massive Pillar Failure--Two Case Studies
By David H. Tang
Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes
Jan 1, 1984
-
Support of Coal Mines in the United Kingdom
By James Arthur
In deep coal mining the support of the underground roadway is fundamental and without knowledge of the mechanics of ground control a mine is unlikely to be operating safely and efficiently. It is the
Jan 1, 2002
-
Salt Pillar Design Equation
By Leo L. Van Sambeek
Specification of properly sized pillars to support the overburden is one of the most challenging aspects of salt mine design. Interest in salt pillar design is heightened by the recent flooding of th
Jan 1, 1997
-
The Duncan Method of Partial Pillar Extraction at Tasman Mine
By Kent D. Mctyer
Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro
Jan 1, 2011
-
The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)
By Kent D. Mctyer
Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro
Jan 1, 2011
-
A Simplified Two-Dimensional Analysis Of The Roof-Pillar-Floor Interaction Problem In Coal Mines
A two-dimensional time-dependent analysis of a overburden-coal pillar-weak floor strata interaction problem is presented as a beam model consisting of a composite roof beam resting on multiple elastic
Jan 1, 1988
-
Shear Bond Characteristics in Grouted Cable Bolts
By Jian Yong Chen
The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o
Jan 1, 2005
-
Ground Control Techniques Utilizing Polymer Grid Structures (6a308b5b-e28a-436d-9aed-f102a6943d1b)
By Brian E. Travis
Lightweight polymer grids have recently been introduced to the mining industry. They are currently being used for roof and rib control, longwall shield recovery, safety guarding or barricade, highwall
Jan 1, 1992
-
Utilization of Ground-Penetrating Radar to Determine Roof Competency in Underground Limestone Mines
By Tim Ross
J. M. Huber Corporation's Quincey Mine. an underground limestone mine located near Quincy. Illinois, has operated successfully and safely for many years utilizing roof bolts on a very limited bas
Jan 1, 2002
-
Overview of Safety Considerations with Highwall Mining Operations
By George Gardner
The rapid growth of highwall mining in the Appalachian coalfields has resulted in unique safety concerns. Due to the concentration of activity at the base of the highwall and the potentially destabili
Jan 1, 2002
-
Case Studies Of Progressive Pillar Failure In Two Mines Using Wide Pillars
By Hamid Maleki
Results of geologic investigations, in-mine instrumentation, and numerical modeling are presented for two longwall mines in which pillars with large width-to-height ratios (8 to 9) are used. These inv
Jan 1, 2000
-
Investigation Into Cutting Characteristics Of Indian Coal Seams (bf5c67f9-81c7-4039-8f47-cd39420e2b8e)
By T. N. Singh
With a view to producing increased target output every year, Indian coal mining industry is fast moving towards mechanisation but the present approach of mechanisation suffers from lack of standardisa
Jan 1, 1992
-
Failure Mechanics of Multiple Seam Mining Interactions (f9d85dbe-da66-4f30-9b39-e277c41aff64)
By R. Karl Zipf
Multiple seam mining interactions caused by full extraction mining, whether due to undermining or overmining, frequently involve tensile failure of the affected mine roof. The adverse ground control c
Jan 1, 2005
-
Preventing Falls Of Ground In Coal Mines With Exceptionally Low-Strength Roof: Two Case Studies
By Christopher Mark
Mines with exceptionally low-strength roof (UCS <3,500 psi and CMRR <40) are much more likely to struggle with roof falls than other mines. Weak-roof is a particular problem for many room and pillar m
Jan 1, 2004
-
Prediction Of Longwall Support Loading At Southern Colliery, Queensland (a27f315c-1e91-4c85-b61a-2de1eb8e0d0f)
Roof conditions at Southern Colliery, the second Iongwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. Invest
Jan 1, 1992
-
Subsidence Monitoring Results, Thick Seam Longwall Mining In Wyoming
By Collin L. Stewart
A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog
Jan 1, 1995
-
Evaluation Of The Strength Behaviour Of Monolithic Packs (af92f0dd-9b80-4922-891e-7d098de9b5e7)
By S. I. Al-Ameen
Monolithic packing systems have gained in popularity as a gate side packing method, However, there has been no detailed investigation to assess their underground strength behaviour. This work includes
Jan 1, 1992
-
An Engineering Analysis Of "Squeeze" Failure Of Pillars In The Pittsburgh Coal Bed
By George Mishra
In mid-1979, J&L Steel Corporation experienced rapid failure of pillars after only two weeks' operation with a combination of full retreat and partial mining in the 154 Road Section of its Nemaco
Jan 1, 1981