Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Five Stress Factors Conducive To Bumps In Utah, USA, Coal Mines

    By Joe F. T. Agapito

    High stresses and adverse geology in deep coal mines in the state of Utah, USA, have caused numerous bumps. The larger bumps have been associated with seismic events with Richter magnitudes of 3.6 and

    Jan 1, 2000

  • SME-ICGCM
    Cost Preventive System To Control Unstable Roof In Main Line Haulage Entries

    By John Popovich

    The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc

    Jan 1, 2001

  • SME-ICGCM
    Cavability Study Of A Competent Roof - A Case Study

    By T. N. Singh

    An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.

    Jan 1, 1994

  • SME-ICGCM
    Coal Mine Geology in the U.S. Coal Fields: A State-of-the-Art-Review

    By Frank E. Chase

    During the past quarter century, coal mine geologists have evolved from providing a qualitative description of drill core and coal reserves into quantitative geotechnical specialists who bridge the ga

    Jan 1, 2006

  • SME-ICGCM
    In-Situ Coal Strength Determination - Case Studies

    By Kot F. Unrug

    Strength of coal is one of the governing factors in size determination of mine pillars, and therefore affects the percentage of extraction and thus, utilization of reserves. Coal strength is also impo

    Jan 1, 1995

  • SME-ICGCM
    STRATA III ? A Full-Spectrum Roof Control Concept

    By John H. Perry

    Strata III is a full-spectrum roof control system which provides the mine operator the ability to upgrade his roof control in place. The procedure is easily adaptable with current roof bolting techniq

    Jan 1, 1987

  • SME-ICGCM
    Stability Mapping as a Tool for Production Planning at Bowie No. 3 Mine

    By Collin Stewart

    Bowie Resources, LLC (Bowie) has been using the Stability Mapping System (SMS) developed by Dr. Keith Heasley, West Virginia University, since 2005. Seven three-entry longwall gateroads, four longwall

    Jan 1, 2007

  • SME-ICGCM
    Multiple-Seam Inter-Burden Stress Distribution Using Strip-Pillar Mining Method

    By Jin He

    Based on the simple-beam theory, a stress analysis model was established for undermining in multiple seam strip-pillar mining when the strip pillars were not columnized; the effects of various mining

    Jan 1, 2006

  • SME-ICGCM
    The Origin and History of U.S. Mine Resin

    By Carl Tom Blevins

    Resin was first introduced to U. S. mines in 1971 and first produced in 1973. The original polyester roof bolt resin was very expensive and limited to a single cartridge size and a single slow gel ti

    Jan 1, 2006

  • SME-ICGCM
    Ultra-Close Multiple-Seam Mining ? Analysis and Verification

    By Daniel W. Su

    This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int

    Jan 1, 2012

  • SME-ICGCM
    Detection of Abandoned Mines and Air Passages/Burning Centers of Mine Fires by Combined Electromagnetic Method

    By Shu Yan

    The high resolution resistivity method (HRRM) is developed specifically for detecting underground cavities and tunnels. HRRM has a special feature in that it can recognize and cancel static shift, whi

    Jan 1, 2005

  • SME-ICGCM
    Development of Timedependent Surface Subsidence Over the Total Extractions Areas of the Potash Beds Stoped with Interchamber Yield Pillars

    By M. P. Nesterov

    The method of predicting the time-dependent surface subsidence for gently-inclined potash deposits where total extraction using various sizes of yielding bamier pillars was discussed.

    Jan 1, 1998

  • SME-ICGCM
    Outcomes of the Landmark Longwall Automation Project with Reference to Ground Control Issues

    By Michael Kelly

    Inertial navigation technology has, for the first time, allowed the position of a longwall shearer to be mapped in three dimensions. Following the success of the technology in highwall mining and succ

    Jan 1, 2005

  • SME-ICGCM
    Yield Pillar Behavior At Jim Walter No. 7 Mine Stress And Strata Measurements Of Yield And Abutment Pillars

    By J. Brasfield

    Jim Walter Resources, along with the Rock Mechanics Branch of British Coal and Strata Control Technology Pty. Ltd., is presently studying the yield-stable-yield pillar design in use at the Blue Creek

    Jan 1, 1994

  • SME-ICGCM
    The Influence of the First Layer Thickness of Immediate Roof on its Stability

    By Lixun Kang

    Bedded structure is the characteristics of coal measures strata. Bedding planes, coal streaks and soft rock bands existing in roof strata destroyed its continuity in the direction perpendicular to the

    Jan 1, 2005

  • SME-ICGCM
    The Initial Collapse of the Overburden Over Longwall Panels

    By Gennaro Marino

    Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing

    Jan 1, 1987

  • SME-ICGCM
    Update: Analysis and Case Study of Impact?Resistant Steel Sets for Underground Roof Fall Rehabilitation

    By Dakota Faulkner

    Unexpected roof falls often occur in the entries or intersections of active mining sections in underground mines. For large roof falls (greater than 20 ft in height), it becomes dangerous and impract

    Jan 1, 2014

  • SME-ICGCM
    Yield Pillar Applications--Impact On Strata Control And Coal Production

    This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.

    Jan 1, 1984

  • SME-ICGCM
    Multiple Seam Mining Interactions: Case Histories from the Harris No. 1 Mine (b50cab1b-ba36-4377-a652-1d452c62f433)

    By Frank E. Chase

    The Harris No. 1 Mine, located in Boone County, WV, has been longwalling the Eagle Coalbed for over 30 years. Harris has experienced numerous interactions associated with the extensive room-and-pillar

    Jan 1, 2005

  • SME-ICGCM
    Presented at the 25th International Conference on Ground Control in Mining

    By David Dye

    Good morning, everyone, and thanks Syd for that fine introduction. I am honored to be here to help you celebrate 25 years of advancement and success in the important field of ground control. I wou

    Jan 1, 2007