Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Extension of the Comminution Energy Curves and Application to Stirred Milling Performance

    By P. Radziszewski

    "The comminution energy curve is a profoundly simple graphical technique that displays detailed operating efficiency information for industrial comminution processes. The database underlying the meth

    Jan 1, 2016

  • CIM
    Integration of Sensor Technologies at a Bucket Wheel Excavator for Identification of Material Type and Detection of Interface Layers

    By Martin Kesting

    The world wide growth dynamics and the continuously growing demand for energy, results in increasing energy prices. Looking from this point, the efficient exploitation of fossil fuel deposits has beco

    Oct 1, 2009

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013

  • CIM
    The First Electrolytic Copper Refinery in Australia at Wallaroo, South Australia

    By B. McHenry, A. E. Wraith, P. J. Mackey

    The Wallaroo smelter on the Yorke Peninsula, South Australia commenced smelting operations in 1861 treating ores from the nearby Moonta and Kadina mines. The plant expanded and modernized on several o

    Jan 1, 2019

  • CIM
    Parallel Surface Fan Operation At Hoyle Pond Mine

    By M. Desjardins

    The Hoyle Pond underground mine, located in the Porcupine Gold Camp, east of the city of Timmins, Ontario, Canada, is the cornerstone of Goldcorp Canada Ltd?s Porcupine Gold Mines. Cut and fill, shrin

    Aug 1, 2013

  • CIM
    Emergency Egress/Ventilation Raise Innovations in Directional Raise Boring & Remote Shotcrete Application

    By Eric Schraml

    Wardrop Engineering and the Placer Dome?s Campbell Mine Design Team utilized leading edge directional raise boring techniques and an innovative, remote controlled application of steel fibre reinforced

    May 1, 2002

  • CIM
    Speciation of Sorbed Gold

    By Stephen L. Chryssoulis, Stamen Dimov

    "Preg-robbing has been known for many years, where increased losses are suffered because dissolved gold is removed from solution by adsorption onto carbonaceous matter. In direct cyanidation circuits

    Jan 1, 2004

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • CIM
    Continuous, Real Time Pulp Chemistry Measurements and What They Tell Us about Metallurgical Performance

    By Kyle Selga, Christopher J. Greet

    "The Pulp Chemistry Monitor (PCM) has been installed and operated in a number of concentrators in Australasia, and has produced some very interesting results. PCM measures the pH, Eh, dissolved oxyge

    Jan 1, 2016

  • CIM
    Stope Stability Monitoring at the Goldex Mine

    By Patrick Frenette

    The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45

    May 1, 2011

  • CIM
    Optimizing Performance at the David Bell Mine Concentrator

    By K. Meyer

    "The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den

    Jan 1, 1991

  • CIM
    Networking Tertiary Education and Industry

    By J. F. Archibald

    This paper reviews the formation of the Canadian Mining Education Council (CMEC) and its terms of reference. CMEC considers that Canada?s mining schools represent a distinct competitive advantage to t

    May 1, 2002

  • CIM
    A study on the effects of potash contamination on the performance of hydraulic components using fire resistant fluids

    By K. Szafran, R. E. L. Seal, M. Tansey

    Conversion of hydraulic equipment to fire resistant fluids has been hampered by less than satisfactory component performance and in some cases, catastrophic equipment failure. Concern over identifying

    Jan 1, 1988

  • CIM
    Advantages of Tailing Disposal by Thickened Discharge

    By E. I. Robinsky

    "This paper describes a new, proven approach for tailing disposal. Not only is the disclosed system less damaging to the environment, it is also less costly to operate, to close down and maintain in p

    Jan 1, 1976

  • CIM
    SEM-XMAP: Scanning Electron Microscopy and X-Ray Dot-Mapping Applied to Cemented Paste Backfill

    By Serge Ouellet

    Identification and quantification of cementitious phases in cemented paste backfill (CPB) is difficult due to the fineness of tailings and the low binder content used in the mixture. Techniques such a

    May 1, 2007

  • CIM
    Teck’s Secondary Leaching Technology

    By H. M. Lizama, R. L. Stephens

    Secondary leaching of previously leached supergene copper ore has been developed and implemented at Teck’s Quebrada Blanca operations. This consists of using in-situ leaching techniques aided by geoph

    Jan 1, 2019

  • CIM
    Stabilization of Lead and Zinc Flotation Circuits at Galmoy Mine, Kilkenny, Ireland

    By Paul Laframboise, Nigel MacDonald, Mike Hallewell, Robert Thorpe

    "Galmoy Mine, owned by Arcon Mines Limited, has operated since 1997, and is one of three operating lead/zinc mines in Ireland. Changes in ore type starting in mid 2002 created challenges to metallurgi

    Jan 1, 2005

  • CIM
    Comparison of Artificial Neural Networks and a Geostatistical Method in Grade Estimation

    By Hamid Mahmoudabadi

    In the present paper, the performance of four approaches based on neural networks and geostatistical method for grade estimation are compared and analyzed their performance to find a proper method. Fo

    Oct 1, 2009

  • CIM
    Shaft Boring with Oil Weil Drilling Equipment at Lynn Lake

    By Peter A. Cain, John C. Folinsbee

    "A 4-ft.-diameter shaft has been drilled to a depth of 2,790 ft. in strong, hard, basic Precambrian rocks at Lynn Lake Manitoba. This was done on the property of Sherritt Gordon Mines Limited for the

    Jan 1, 1966

  • CIM
    Diagnosis of the Operation of a Hydraulic Classifier for Iron Ore Concentrate

    By C. Gosselin, G. M. Payenzo, C. Bazin, M. Desnoyers, G. Chevalier

    "ArcelorMittal Mines Canada operates hydraulic classifiers to reduce the silica content of an iron oxide concentrate from 4.5% to less than 1.2% SiO2. Sampling campaigns were conducted to develop a pr

    Jan 1, 2012