Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Review of Comminution Practice

    By Ronald E. Hamilton

    "An attempt to review the recent literature on comminution reveals at once that the subject has many ramifications and that the applications are so diverse that there are very few general statements w

    Jan 1, 1976

  • CIM
    Induration Machine Advanced Process Control (APC) at the Iron Ore Company of Canada

    By Robert J. Kuhne

    The Iron Ore Company of Canada has successfully employed advanced process control (APC) to optimize the operation of their induration machines. A significant increase in machine throughput and a redu

    May 1, 2007

  • CIM
    Developments in the Hydrometallurgical Processing of Nickel Laterites

    By F. McCarthy, W. Zhang, R. McDonald

    "The processing of nickel laterites has been a topic of major interest at CSIRO for almost twenty years. During this period CSIRO has collaborated with other researchers and industry in developing a b

    Jan 1, 2017

  • CIM
    Electromagnetic testing of wire ropes — New developments

    By K. Leung, J. E. Udd, L. B. Geller, F. Kitzinger

    "Sixteen miners died tragically at the Paymaster gold mine in Timmins, Ontario, in February 1945 when a badly corroded hoist rope broke. The investigation of the Royal Commission that followed arrived

    Jan 1, 2003

  • CIM
    Gold Potential of a Hidden Archean Fault Zone: The Case of the Cadillac-Larder Lake Fault

    By O. Rabeau, M. Legault, A. Cheilletz, L. Z. Cheng, J. J. Royer, M. Jébrak

    "By compiling geological, structural, geophysical, and geochemical information into a 3D geological model, we evaluated the orogenic gold potential in the vicinity of a hidden segment of an important

    Jan 1, 2009

  • CIM
    A Non-Nuclear Density Meter and Mass Flow System Measuring Mining Slurries with Entrained Gas

    By R. H. Batey

    "The process control and cost of monitoring mining slurries is normally accomplished using a continuous mass flow system, conventionally embodying a volumetric magnetic flow meter and nuclear density

    Jan 1, 2013

  • CIM
    Influence of Shear Surface Geometry on Deformation Processes in Massive Landslides

    By K. S. Kalenchuk

    Massive landslides display complex deformation processes. For instance, slope movements of the Downie Slide, monitored using borehole inclinometers, extensometers, and survey monuments, show considera

    May 1, 2009

  • CIM
    Anode Furnace Nitrogen Gas Purging System at Kansanshi Copper Smelter

    By L. Hanschar, C. Bwalya, E. Mokola, K. Musonda, A. Makayi

    This paper describes the installation, commissioning and operation of porous plugs featuring nitrogen gas purging in both Anode Furnaces at the Kansanshi Copper Smelter (KCS), a greenfield copper smel

    Jan 1, 2019

  • CIM
    25 Years of Process Development: Gold Processing

    By K. P. Wright

    "Twenty-five years ago, there were about thirty-two gold mines operating in Canada; nine of these have been in continuous operation since then and are still operating. Three of these are part of the D

    Jan 1, 1987

  • CIM
    Statistical Multi-Scale Method of Mechanics Parameter Prediction for Rock Mass

    By J. Z. Cui

    In this paper a statistical multi-scale method for the mechanics parameter prediction of the rock mass with random distribution of multi-scale cracks/joints is presented. First the micro-structure of

    May 1, 2009

  • CIM
    LIDAR Geotechnical Mapping for the Construction of Deep Underground Science and Engineering Laboratory at the Former Homestake Mine

    By Zbigniew J. Hladysz

    A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the US National Science Fou

    May 1, 2011

  • CIM
    Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite Deposits

    By J. A. McLennan

    Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer

    Apr 1, 2005

  • CIM
    Prevention of Low Back Pain - A Challenge

    By C. Droun

    "Low back pains account for about 13 per cent of all compensation claims made to the Quebec Workmen's Compensation Commission and cost the employers a sum exceeding ten million dollars. The frequency

    Jan 1, 1973

  • CIM
    Potash Processing in Saskatchewan - An Update.

    By Carlos F. Perucca

    "Potassium is one of the three basic plant nutrients along with nitrogen and phosphorus. There is no substitute for potassium compounds in agriculture; they are essential to maintain and expand food p

    Jan 1, 2003

  • CIM
    Development of Oxidation Resistant Titanium Alloys by Niobium Addition

    By G. J. Ackland, K. Saksl, F. Brunke, M. Kohnke, B. Tegner, C. Siemers

    The application of titanium alloys is limited to 550°C due to their poor oxidation resistance. It is known that the addition of niobium decelerates the oxidation of titanium alloys whereas elements li

    Jan 1, 2014

  • CIM
    The Economics of Individually Motorized Rail Cars in Block Caving Operations

    By Scott A. Stebbins

    Cost evaluation models constructed specifically to evaluate the economic potential of an individually motorized railcar system of ore and waste transport demonstrate that the approach may be considera

    Nov 1, 2011

  • CIM
    Food Issues in Environmental Impact Assessments

    By R. Kwiatkowski

    Agenda ? Health Canada Protocol _ Screening Level Risk Assessments (SLRAs) Contaminants Foods Exposure Pathways COPCs _ Site Specific Risk Assessments (SSRAs) In-depth, quantitative Monitoring

    Apr 1, 2005

  • CIM
    Application of the Woodgrove Staged Flotation Reactor (SFR) Technology at the New Afton Concentrator (48th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 2016)

    By K. Swedburg, M. Samuels

    "The New Afton concentrator was commissioned in June 2012, reaching the design milling rate in September 2012. By late 2013, through a campaign of optimization and de-bottlenecking, it was recognized

    Jan 1, 2016

  • CIM
    The Voisey?s Bay Project2002 ? 2006

    By Dave Stefanuto

    Voisey?s Bay Project Components ? Mine/Mill Port In Labrador ? Mini Plant in Mississauga ? Demonstration Plant in Argentia ? Supply Vessel (Umiak1) ? Transshipment Facility (Quebec) ? Concentr

    May 1, 2006

  • CIM
    Cobre Panama

    By Ian D. Pirie

    Presentation outline ?Project location ?Geology ?Resources and reserves ?Results of the FEED study ?Social and environmental considerations ?Project path forward

    May 1, 2010