    Two Stage Iron Purification of Zinc Plant Solutions (bbf6e4b6-3e13-4866-8453-33e6cff94330)

    By Kershaw M. G

    At the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, impurities toxic to the electrolytic production of zinc metal, notably arsenic and antimony, have traditionally been coprec

    Jan 1, 1990

  • AUSIMM
    Charging Patterns, Size Distribution and Velocity Profiles in a Stock Column

    By Nightingale RJ

    A column (50 cm 4) provided with a bell charging mechanism and a rectangular perspex insert was used to investigate the inter-relationship between charging pattern, size analysis and velocity profile

    Jan 1, 1975

  • AUSIMM
    Coking Coal and Iron Ore ù Comparisons and Contrasts

    The products from beneficiation present themselves at opposite ends of the spectrum, and yet numerous synergies exist in the preparation of coking coal and hematite iron ore products for their common

    Jan 1, 2005

  • AUSIMM
    Application of Fluidsied Bed Technology to Reduction of Australian Mangansse and Iron Ores

    By Brent A. D, Olsen a. H, Mayfield P. L J, Grazier P. E

    Concentrates produced from MnO2 and Fe203 ore fines have been targeted as potential feedstocks for direct metallurgical processing. Prereduction of pyrolusite-rich Mn02 sands to MnO has been investi

    Jan 1, 1995

  • AUSIMM
    The Recommissioning of the Treatment Plant at Mary Kathleen Uranium Ltd.

    The recommissioning of the plant at Mary Kathleen involved several distinct phases. The previous plant process was modified significantly, the plant capacity was increased by the addition of new eq

    Jan 1, 1978

  • AUSIMM
    SRS-1200, shaft rescue system with intrinsically safe communications and gas monitoring

    By B Stewart

    The SRS-1200 concept came about following the recommendations from the Board of Inquiry into the 1994 Moura No 2 mine disaster with the aim of having a system to remove personnel from an unsafe enviro

    May 5, 2022

  • AUSIMM
    Are our closure planning and regulatory processes adequate to identify, quantify and appropriately transfer residual risks after successful mine rehabilitation?

    By P B. Swart, P D. Erskine

    Despite an increasing focus by media, communities and activists driving an elevated regulatory focus in Australia and indeed some other mining jurisdictions, the mining industry globally has had limit

    Jul 25, 2018

  • AUSIMM
    Recovery of Gold from Refractory Ores and Concentrates Using the Sirosmelt Reactor

    By Floyd J. M

    The recovery of gold from refractory ores and concentrates can be achieved in a number of ways using roasting and leaching procedures. The Sirosmelt system introduces a new approach to the recover

    Jan 1, 1987

  • AUSIMM
    Banking Needs for Project Development Financing (591555b9-102c-4033-a3e1-dcf0b636a120)

    Some only types of bank finance are appropriate for mining development, with conventional fixed rate finance having significant limitations of flexibility. New, innovative and flexible instruments

    Jan 1, 1983

  • AUSIMM
    A study of heat and material balances in direct reduction plant with various conditions

    By H Kim, M J. Sun

    Global steel companies are actively combating climate change by reducing carbon emissions. Traditional steel production, using the blast furnace (BF) – basic oxygen furnace (BOF) process, heavily depe

    Aug 21, 2024

  • AUSIMM
    Confirming the Sampling, Sample Preparation and Assaying Protocols Used at Two Yilgarn Gold Deposits

    By E du Plessis, M Rowley, M Fallon, F Golenya, R Swanson, I Robertson

    "Check sampling programs were undertaken at Barrick Australia Pacific LimitedÆs Lawlers and Plutonic mine sites in Western Australia. The programs identified that the sampling, sample preparation and

    Aug 21, 2012

  • AUSIMM
    Townsville Copper Refinery

    By Saint-Smith J. C

    The anode, tank house and wire bar plant and operations are described with particular reference to those features of design and methods which are characteristic of this refinery at its inception.Refer

    Jan 1, 1961

  • AUSIMM
    Flotation Circuit Optimisation Using a Simplex Evolutionary Operation Technique

    By Richardson F. A

    Techniques for flotation optimisation were investigated at Cobar [lines Pty:Ltd., in anticipation of the proposed installation of a computer and on-stream analysis. Successful laboratory and pilot

    Jan 1, 1973

  • AUSIMM
    Difficulties Associated with using Indicator Minerals for Diamond Exploration in North Queensland

    Minerals similar to the indicator minerals used in kimberlite exploration are widespread in the Cainozoic alkali basalts of north Queensland. Magnesian ilmenite, pyrope garnet, chrome diopside, ch

    Jan 1, 1984

  • AUSIMM
    Dewatering Marra Mamba – Lessons Learned

    By K Sommerville

    BHP Billiton’s Area C iron ore operation has been in production since 2003. During 2010, below water table mining in the Marra Mamba formation commenced and dewatered ore has been successfully process

    Jul 11, 2011

  • AUSIMM
    Fault Styles in the Sydney - Bowen Basin: - Implications for Coal Mining Conditons

    By Sullivan T. D, Lohe E. M

    Geological structure is one of the main controls on ground conditions within mining. It has a significant impact on the mining conditions and productivity of coal mines within the Sydney - Bowen Ba

    Jan 1, 1991

  • AUSIMM
    Hydraulic Shovel Simulator in Surface Mining Excavation Engineering

    By J Szymanski, Y Hu

    Excavation engineering involves complex processes for primary and secondary extraction of materials. The shovel excavators bear varying mechanical energy input and stress loading across the working be

    Jan 1, 2003

  • AUSIMM
    Plant Practice at the New Celebration Gold Mine

    By Martins V, Dunne R

    A re-evaluation of the Hampton Boulder prospect in the early eighties resulted in a decision to proceed with mine development in December 1985. A 500 000 tpa gold treatment plant was commissioned in D

    Jan 1, 1992

  • AUSIMM
    Smelting of nickel and vanadium wastes to produce green steel

    By D Lalor, N Goodman

    The increasing demand for batteries is resulting in the development of large-scale projects for the production of key battery metals such as nickel and vanadium. Several of these projects plan to extr

    Sep 18, 2023

  • AUSIMM
    Application of Risk Analysis to a New Gold Mine

    Detailed cash flow forecasts have always been almost essential as a basis for judging the viability of proposed new mining projects. In recent years attempts have been made explicitly to take accou

    Jan 1, 1977