Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Lead-zinc Ore Mining at the Isa Mine of Mount Isa Mines Limited, Mount Isa, QueenslandMount Isa Mines Limited has been mining silver-lead-zinc ore at Isa Mine for 60 years. Mining methods have evolved continuously, and current production rates of 4.7 Mt/yr are obtained from a combinati
Jan 1, 1993
-
Grasberg Porphyry Copper-Gold Deposit, Papua, Indonesia - Structural Setting and Hydrothermal SystemThe Ertsberg (Gunung Bijih) Mining District is located in the core of the highlands of west New Guinea, an island long recognised as the product of a Cenozoic arccontinent collision. Geologic studies
Jan 1, 2008
-
Energy to the Year 2001: Coal and Oil ShaleBy the 1990's Australia could be the largest coal exporter in the world and one of the few industrialised countries potentially able to supply the shortfall in its domestic oil requirements b
Jan 1, 1981
-
When Does Further Processing at the Mine Site Make Sense?By G Lane, S La Brooy
A century ago, new mines were often accompanied by smelters. In Australia, smelters were built at the Daydream mine near Broken Hill, at Kuridala and Mount Elliott near Mount Isa, Broken Hill, Mount L
Jan 1, 2008
-
Acid Rock Drainage From Highway and Construction Activities in Virginia, USABy Z W. Orndorff
Excavation through sulfidic geologic materials during construction activities has resulted in acid rock drainage (ARD) related problems at numerous (>40) locations across all five geologic regions of
Jan 1, 2003
-
Nuclear Waste Disposal-A New Application for Titanite CeramicsAustralia is a significant exporter of uranium for use as fuel in nuclear generating plants around the world. Although Australia does not have any nuclear power plants the Australian Atomic Energy Com
Jan 1, 1986
-
Reducing the Variability in Dragline Operator PerformanceAustralian coal mines have spent considerable capital on dragline improvements over the last two years. This has included ~$30 M on UDD conversions, >$20 M on new buckets, boom upgrades, electrical up
Jan 1, 2005
-
Underground Geological Mapping at North Broken Hill LtdA proved routine mapping practice is described involving detailed observations on grade and structure. The equipment and methods employed are giving good service under the conditions encountered. Stop
Jan 1, 1940
-
Resistance to the Introduction and Testing of New Technology in Mineral ProcesingWe live in a world in crisis. One where the tides of change run ever faster. Where the only thing we can be sure of is change itself. The challenge we face, therefore, is not how to resist the force
Jan 1, 1993
-
Community Consultation for the Wimmera Industrial Minerals Project (WIM)Although a formal EES was not prepared for the WIM project due it winding down, CRA Ltd has been through the EES and planning scheme amendment process for its demonstration plant. Community consultati
Jan 1, 1992
-
Cooperative Strategies for Businesses with Particular Focus on KwinanaBy B McIntosh
Sustainability in its simplest assessment has been defined as æmeeting the needs of the present without jeopardising the needs of future generationsÆ. For the mining industry alone, this statement cou
Jan 1, 2004
-
The Due Diligence Defence Against Personal Liability for ConsultantsBy Hancock RG, Dewar GJA
The mining and exploration industry is governed both directly and indirectly by a complex and constantly changing regulatory and legal system, yet few technical professionals realise the extent to.
Jan 1, 1995
-
Selection of an Ore Haulage System for Telfer DeepsBy P J. Ellen
The selection of the ore haulage system is a key decision made in the development of an underground mine. The haulage system is one of the components that define a mineÆs ability to respond to changes
Jan 1, 2005
-
Importance of Solution Chemistry for Thiosulphate Leaching of GoldGold recovery by catalytic copper ammonium thiosulphate solution has been studied. Such a process strategy is very attractive for leaching certain difficult-to-treat ores and presents lessened lixivia
Jan 1, 1997
-
The Use of Blasting Models for the Optimisation of Mine ProductivityBy Paine GG
In coal mining each of the unit operations are interrelated with each preceding operation having an effect on subsequent operations. This presents difficulties for determining when the lowest overa
Jan 1, 1987
-
The Use of Acoustic Scanner Results for Mine DesignBy J L. Edwards
High resolution, acoustic scanning technology has emerged in recent years as a powerful wireline tool for identifying the occurrence and orientation of structures and borehole breakout û the latter be
Jan 1, 2009
-
Using Value at Risk for Integrated Project Risk EvaluationBy W Stange
Assessing the risks in a mining project is a key aspect of project evaluation. This is an exacting and demanding task because of the complexity due to the need to deal with uncertainty over long time
Jan 1, 2009
-
3D Blast Design for Ring Blasting in Underground MinesThrough partnering with mining customers, DYNO has been able to develop some specific technologies that benefit blasting operations particularly in underground mining. Some of these areas are: 1. Co
Jan 1, 1995
-
Preparation Of Environmental Impact Statements For The Mining IndustryThere are a number of methodologies which can be used for the preparation of environ- mental impact statements. Selection of a method depends upon the type of project and the environmental character
Jan 1, 1976
-
The Strategic Role of Mineral Processing for BHP MineralsBlIP Minerals is a large, diversified, international mineral producer. This paper describes the company's operating strategy, and identifies the role of mineral processing in this strategy thro
Jan 1, 1993