Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of Mining Related Legislation in the Northern Territory

    By D Hart

    In 1944 some ten or so pieces of legislation impacted on the mining industry. Today in excess of 80 in one way or another apply to the Northern Territory miner. This paper will look at the nature of

    Jan 1, 1994

  • AUSIMM
    Productivity Gain from Advances in Mining Geology - Signposts for the Future

    By White A, Price G

    The main assets of a mining company are its orebodies; the second are the people who find and use them.The graphs in Figure 1 were derived from a paper by Rob Macdonald of Rothschild Australia present

    Jan 1, 1993

  • AUSIMM
    Bentonite and Fuller's Earth Deposits of New South Wales: II. Bonding Properties

    By Giles C. N, Loughnan F. C

    Bentonites and active earths from N.S.W., previously analysed with respect to occurrence, mineralogy and physical properties have been evaluated for use as bonding agents in quartzose moulding sands i

    Jan 1, 1959

  • AUSIMM
    The Round Diaphragm Jig 'Trud-12' with a Movable Sieve an Advance in the Gravity Concentration of Ores

    The mmmg of alluvial gold involves many deposits of theMesozoic, Tertiary, and Quaternary Ages in processing. Majorfeatures of the composition of such alluvial deposits are the lowcontent of gold and

    Jan 1, 1993

  • AUSIMM
    Chromite in Beach Sands from Norrie's Head and Stradbroke Island

    By Baker G

    Chromite was recorded among the rare minerals in the natural beach sand concentrates on the coast of Northern New South Wales by Whitworth(l) in 1931, and the commercial production of zircon and rutil

    Jan 1, 1948

  • AUSIMM
    Present Situation and Future Trends in the Chinese Steel Industry and Utilisation of Low-Grade Iron Ore Resources

    By J Pan, G Qiu

    In this paper, an analysis is made of the present situation in the Chinese steel industry and its demand for iron ores. It is shown that the demand for iron ores has been growing substantially with th

    Jan 1, 2009

  • AUSIMM
    Spatial Planning and Interface Issues for Mechanical and Electrical Facilities in Road Tunnels

    Mechanical and electrical (M&E) systems in road tunnels are constrained by the traffic envelope and the construction profile. Whilst these spatial constraints are often ælocked inÆ early in the de

    Jan 1, 1999

  • AUSIMM
    Measuring ore quality using real-time on-belt elemental analysis – more than grade control

    By H Kurth

    Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce

    Sep 20, 2017

  • AUSIMM
    "The Business Case for Early-stage Implementation of Geometallurgy– an Example from the Productora Cu-Mo-Au Deposit, Chile"

    By J L. Macdonald, G S. King

    "The development of a predictive geometallurgical model is a multidisciplinary and iterative task that involves both discovery and integration aspects. In this paper, the authors discuss the concepts

    Jun 15, 2016

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • AUSIMM
    The Simulation of a CIP Plant Incorporating Shifting Equilibria Dependent on Cyanide and Copper

    By R C, K L. Rees, J S. J van Deventer

    In contrast with previously published models for the carbon-in-pulp (CIP) process, the model proposed in this paper incorporates film transfer, intraparticle diffusion, simultaneous leaching, preg-rob

    Jan 1, 1998

  • AUSIMM
    The Use of High-Water Rapid-Solidifying Material as Backfill Binder and its Application in Metal Mines

    By Liu Wenyong, Huang Yucheng, Yang Ba

    High-water rapid-solidifying material, called æhigh-water materialÆ, is a new material developed by the authors over many years. The material can solidify nine times its volume of water into solid. Th

    Jan 1, 1998

  • AUSIMM
    Phase diagram study and thermodynamic modelling of the CaO-TiO2- CaF2 system

    By J Bang, I-H Jung

    Ti is an important constituent for steels and superalloys. During the continuous casting process and ElectroSlag Remelting process (ESR), Ti in molten steel and superalloy can have chemical reactions

    Jun 19, 2024

  • AUSIMM
    Underground Quarrying - A Challenge for the Next Millennium

    By M A. Ohsberg, A C. Robertson

    Quarrying in Australia accounts for a total annual production of around 200 Mt/a of sand, aggregate and materials used in construction. This material has an annual value of the order of $2 billion and

    Jan 1, 1999

  • AUSIMM
    An Integrated Liberation-leach Model and Ore Characterisation Procedure for Gold Ores

    By T D. H McGrath, G Wardell-Johnson, E A. Oraby, W Staunton, A R. Bax, J J. Eksteen

    "Gold ores often show significant inter-domain variation with respect to the gravity recoverable gold (GRG) content and the leach behaviour of the non-GRG component. Liberation assessment is extremely

    Jun 15, 2016

  • AUSIMM
    Quantifying the Opportunity Cost of New Zealand's Mineral Potential

    By A B. Christie, R Barker

    Recent studies carried out to support the development of a strategy for the New Zealand mineral industry by the NZ Minerals Industry Association have included investigations of mineral potential, and

    Jan 1, 2002

  • AUSIMM
    An Integrated Approach to Optimising All Concentrator Products, Including Tailings

    By A Riles

    "Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o

    Jun 15, 2016

  • AUSIMM
    Draw Control at Premier Mine

    By K Nesbitt

    Draw control at Premier Mine is considered important to avoid conditions of isolated draw, which results in early waste ingress, compaction of the kimberlite ore and loss of ore reserves. The Premier

    Jan 1, 2000

  • AUSIMM
    An Integration of Short-Term Planning with Mineral Processing Simulation

    By F D Durao, Muge F. H, Rogado J. Q

    In the scope of the project named CAPUME II (EEC BRITE/EURAM contract - project MA2M-CT90,-0042(SMA)) for the development of an integrated mine planning system for underground mines, two of the main

    Jan 1, 1995

  • AUSIMM
    Planning and Investigation of the Airport Link Tunnel and Northern Busway, Brisbane

    By T Peglas, A de Aboitiz

    The Queensland Government, via the special purpose company vehicle û City North Infrastructure Pty Ltd û is currently developing BrisbaneÆs Airport Link underground toll road and Northern Busway (Wind

    Jan 1, 2008