Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Alluvial Gold in the Clyde Power Project Area: Some Observations on the Origin, Distribution and Age of the Deposits

    The Clyde Power Project, and its Clutha Valley Development forerunner, has taken widespread investigations for various hydroelectric purposes both along the valley floors upstream from Alexandra and o

    Jan 1, 1992

  • AUSIMM
    Geology, Mineralisation and Potential of the Clogau St DavidÆs Mine, Dolgellau Gold-Belt, Gwynedd, Wales

    By I M. Platten, S C. Dominy

    The Clogau St DavidÆs gold mine has a recorded production of around 81 000 oz Au and it is the largest mine in the Dolgellau gold-belt and BritainÆs most prolific historical producer. The original min

    Mar 26, 2012

  • AUSIMM
    Two Transit Levels in One Tunnel Tube – An Innovation in Barcelona Metro Line 9

    By R Justa Cámara, L M. Pinillos Lorenzana

    Barcelona Metro Line 9 (Line 9) is an essential infrastructure, improving the transversal transport in Barcelona by connecting the greater part of the currently existing radial lines. The purpose of L

    Sep 17, 2014

  • AUSIMM
    Steel and Iron Ore Scenario - An Indian Perspective

    India is on fast economic growth. Even in the turbulent years of global crisis, it could achieve a growth of over eight per cent. In recent past, Indian Government has been contemplating a faster grow

    Dec 6, 2010

  • AUSIMM
    The Use of Psychometric, Thermodynamic and Transport Property Software in Mine Ventilation and Gas Drainage Calculations

    By T J. M Harvey

    This paper gives an overview of the ASHRAE LibHuAirProp, CoolProp and REFPROP software packages. These packages were predominantly developed for heating, refrigerating and air conditioning engineers a

    Aug 31, 2015

  • AUSIMM
    Use of Geochemistry in the Exploration of Archaean Ultramafic Rocks in the Eastern Goldfields of Western Australia

    Attempts to rationalise the geological environment of nickel sulphide deposits associated with Archaean ultrabasic rocks has produced much speculation as to the origin of the sulphides and the relativ

    Jan 1, 1987

  • AUSIMM
    The Ventilation and Refrigeration Design for Australia's Deepest and Hottest Underground Operation ù the Enterprise Mine

    By R Brake

    The Enterprise Mine (EM) is located at Mount Isa and is wholly owned by Mount Isa Mines Limited (MIM). This high-grade copper mine extends from about 1000 m below surface to almost 2000 m below surfac

    Jan 1, 2000

  • AUSIMM
    Findings from preliminary testing to determine alternative sources of ethylene within sealed areas of underground coalmines

    By E Westthorp, J Phillips

    The detection of ethylene in mined-out ‘goaf’ areas of underground coalmines is an industry standard indicator of accelerated oxidation where the coal temperature has exceeded 100°C. If uncontrol

    Aug 28, 2017

  • AUSIMM
    Magnetite in Nickel Smelting

    By R Sridhar, M Fe, W G. Bacon

    The problems of magnetite build-up have plagued the non-ferrous pyrometallurgical industry for many years. To better understand these problems, a study was undertaken to determine the thermodynamic va

    Jan 1, 2000

  • AUSIMM
    An Evaluation of Pricing and Allocation Methods Under the Crown Minerals Act 1991

    The Crown Minerals Act provides a new+framework for the management of Crown owned minerals and requires that regard be had for the principles of the Treaty of Waitangi. The Act requires the preparatio

    Jan 1, 1992

  • AUSIMM
    Real-Time Simulation in Process Engineering - Dream or Reality?

    Computation is believed to be a powerful tool in scaling-up chemical processes and in designing materials, however, is being challenged by low predictability and limited scalability. This presentation

    Sep 13, 2010

  • AUSIMM
    The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term Planning

    By T Berryman, C Adams, L Griesel, C Buxton

    The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g

    Aug 18, 2014

  • AUSIMM
    The Methodology Behind the Development of the Vera/Nancy Mine

    Within ten months of the first significant intersection on the Vera deposit, approval was given to proceed with a $28.3 M underground development of the Vera-Nancy gold mine. Contrary to what the time

    Jan 1, 1998

  • AUSIMM
    Rio Tinto’s strategic assurance response to the Brumadinho tailings dam failure

    By J Lapwood, S Pal, M Pascoe

    The devastating failure of Dam I at the Corrego do Feijao iron ore mine near Brumadinho in Brazil on 25th January 2019 left at least 270 people dead or missing. In the immediate aftermath of this even

    Jul 1, 2021

  • AUSIMM
    Ballarat East-From Eureka to the 80's

    This paper puts the view that, for one gold deposit in Victoria at least, the Australasian Code for the Reporting of Identified Mineral Resources is severely deficient. The author questions whether

    Jan 1, 1990

  • AUSIMM
    Central Coal Preparation Plants on the West Coast - A Conceptual Viewpoint

    By R G. Richards

    Although most New Zealand coals are low in ash, there are situations where high ash coals could be won. Not all high ash coals can be upgraded by physical means, since the ash is either inherent in th

    Jan 1, 1979

  • AUSIMM
    Effect of liquefaction controlling components in carbon-free mould powder for the continuous casting of ultra-low carbon steels

    By N Gruber

    In the continuous casting of ultralow carbon (ULC) steels, free carbon is used to control the melting behaviour of mould powders. If the carbon is not completely removed during melting, it is enriched

    Jun 19, 2024

  • AUSIMM
    Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the Design

    By I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve

    The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main

    Sep 17, 2014

  • AUSIMM
    Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle Mine

    By G B. Smith

    Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot

    Mar 21, 2011

  • AUSIMM
    Controls on Disseminated Gold Mineralisation at Fosterville, Victoria, Australia

    The Fosterville Goldfield has a modest past production (0.3 Moz), but is now emerging as a significant goldfield (2.6 Moz resources, including 1.1 Moz reserves) with implications for exploration withi

    Jan 1, 2005