Design Equations For Laterally Loaded Piles Embedded In Sand
By T. G. Davies
The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to
Jan 1, 2010
-
Augered Cast-in-Place Pile Manual, Second Edition, 2003
The development of Augered Cast-In-Place (ACIP) piles started in the late 1940's when several projects were performed by Intrusion-Prepakt, Inc. utilizing various techniques to place the piling.
Jan 1, 2003
-
Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.
By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille
"Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair
Jan 1, 1900
-
Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BC
By Keith MacKay, John Carter, David Siddle, Fernando Faminia
"The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands
Jan 1, 2016
-
Tresfjord Bridge -Pile Works
By Andreas Andenæs, Arne Schram Simonsen
"AbstractThe Tresfjord bridge is with its variety in foundation concepts and difficult soil conditions one of the most geotechnically challenging projects in Norway at the time. The project comprises
Jan 1, 2014
-
Dynamic Monitoring And Analysis Of Pile Foundation Installations ? Introduction
By Patrick J. Hannigan
The pile foundation designer typically performs a subsurface exploration program and static pile capacity calculations before selecting a pile foundation type, length, and capacity. During constructio
Jan 1, 1990
-
-
Augered Cast-In-Place Pile Manual (Model Specification with Commentary)
"Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst
Jan 1, 2016
-
Measured And Predicted Response Of Laterally Loaded Piles - Synopsis
By K. Mallikarjuna Rao
There are several methods available to estimate deflection and ultimate Capacity of laterally loaded piles. In this investigation an attempt has been made to verify the existing methods for prediction
Jan 1, 1996
-
Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling Method
By Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev
Jan 1, 2015
-
Behavior of Instrumented Deep Anchored and Strutted Diaphragm Wall in Soft Rock
By Amr Al Degwe, Walid Jaber
"INTRODUCTIONNSCC International Ltd. carried out the enabling works and constructed the foundation system for the Emirates Pearl Tower and Bab El Qasr Hotel in Abu Dhabi. Emirates Pearl Tower is a joi
Jan 1, 2017
-
Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of Antwerp
By Stefan Mewes
Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa
Sep 1, 2022
-
Effect of Sand Density on Load Sharing Mechanism of Piled Raft Foundation
By Rouzbeh Vakili, Adel M. Hanna
"The application of piled raft foundations has significantly increased during the last few years. In this system, the raft and the pile group collectively transfer the applied building load to the und
Jan 1, 2017
-
No. 1 Queens Road - Melbourne, Australia
By Tom George
"INTRODUCTIONNo. 1 Queens Rd was an existing 10-storey office building founded on large pad footings. This project involved the construction of a 6-level, 15m (50-ft.) deep basement excavated immediat
Jan 1, 2005
-
A Ten-Year Perspective of Jet Grouting: Advancements in Applications and Technology
By Gary T. Brill
In the presentation, the development and new applications of the jet grouting technique in the North America are briefly introduced at first and followed by the outline and advantages of Jet Grouting.
Feb 10, 2003
-
Efficient Torque-Installed Pile Use in Southern California
By Jason Buenker, Molly Winston
Torque-installed piles are gaining popularity in Southern California as the go-to deep foundation element for small- to medium-capacity loads in urban environments. The torque-installed pile is a disp
Jan 1, 2019
-
Installation Effects of Drilled Screw Pile In Soft Clay
By Jianhua Wang, Jianming Yao, Zhen Meng, Jinjian Chen
"Drilled screw pile is a newly developed displacement pile foundation which has been applied in soft clay for many years. Compared with traditional circular displacement pile, It is characterized by h
Jan 1, 2015
-
San Francisco International Airport Air Traffic Control Tower Pile Foundations
By Camilo A. Alvarez, Stephen K. Harris, Brian R. Zuckerman, Philip J. Meymand, Danielle M. Steinmetz
"The sleek new air traffic control tower at the San Francisco International Airport stands at 221 feet tall and is set to replace the existing air traffic control tower by 2016. This aluminum-clad, to
Jan 1, 2017
-
Pile Lateral Behaviour under Full Scale Lateral Load Tests in Thick Compacted Marine Carbonate Sand Fill of an Artifical Island
By Challa Venkata Rami Reddy, Anindya Roy, G. R. Konni
This paper presents the results of pile lateral capacities obtained from both conventional design and fullscale pile lateral load tests. Conventional design using P-Y curve analysis is very commonly b
Sep 8, 2021
-
Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special Application
By Andhra Pradesh, Nagarajkumar B. V
As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad
Sep 1, 2022