Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Recent Experiences With Optical Fibre Monitoring Of Geotechnical Structures

    By Gust Van Lysebetten, Monika de Vos

    The objectives of monitoring geotechnical structures can be very diverse, including optimisation of the design, quality control, long term performance assessment, and approval of innovative execution

    May 1, 2022

  • DFI
  • DFI
    Practice Of Large Diameter Stepped Section Bored Pile Foundation Of A Deep Water Bridge

    By Cen Guoji

    The foundation of bored pouring concrete pile have been adopted in the bridge engineering of China since early in the sixties. They demonstrated tremendous technical advantage and achieved notable eco

    Jan 1, 1991

  • DFI
    Using Large Pile Driving Hammers For The Foundation Of Bridges And Windparks

    By Bernhard Bruggaier

    Outside the oil and gas industry there is an increasing demand to install big piles for the foundation of ports, bridges, and wind-energy plants. This article introduces the design and techniques in u

    Jan 1, 2002

  • DFI
    Application of Innovative Underreamed Ground Anchorage with Capsule

    By Gang Guo, Zhong Liu

    "In response to an increasing demand of anchored structures for underground space and transportation infrastructure in China, an innovative underreamed ground anchorage system was created. The novel a

    Jan 1, 1900

  • DFI
    Non-Destructive Geophysical Evaluation Of Deep-Mixed Soil: A Computer Modeling Study

    By David A. Staab

    Numerical modeling was used to investigate the feasibility of using two geophysical imaging techniques, cross-borehole ground penetrating radar (XBGPR) tomography and electrical resistivity (ER) tomog

    Jan 1, 2004

  • DFI
    Sharing of Lateral Loads and Moments in Pile Foundations

    By Andrea Gambi, Giancarlo Olivucci, Maurizio Lenzi

    "In the paper a criterion for the evaluation of the sharing of the lateral loads in a piled foundation is presented. It relies on the the compatibility condition between the rotation of the rigid pile

    Jan 1, 2005

  • DFI
    Drilled Shaft Inspector's Manual - 1.0 General - 1.1 Scope And Limitations

    The intent of this manual is to provide guidelines for inspectors of drilled shaft construction otherwise referred to as drilled piers, caissons or bored piles. It should also be helpful to train begi

    Jan 1, 2004

  • DFI
    Prediction Of Jet Grout Column Diameter In Cohesive Soil

    By Chu E. Ho

    Current methods of determining jet grout column diameters are highly empirical and site specific, and do not take into account the jet hydrodynamics and soil parameters explicitly. A theoretical model

    Jan 1, 2006

  • DFI
  • DFI
    General Reports - Session 1 - General Report- Deep Excavations "He Who Pays The Piper Calls The Tune"

    By Tim Chapman

    This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f

    Jan 1, 2006

  • DFI
  • DFI
    Non-Destructive Testing Of Drilled Shafts - Title ? Table Of Contents - Introduction And Overview

    By Edmund J. Cardoza

    WELCOME TO THE DEEP FOUNDATIONS INSTITUTE 26TH ANNUAL CONFERENCE AND WELCOME ESPECIALLY TO THIS SEMINAR ON NON-DESTRUCTIVE TESTING OF DRILLED SHAFTS, PRESENTED BY MEMBERS OF THE DFI DRILLED SHAFT COMM

    Jan 1, 2001

  • DFI
  • DFI
    Cut-Off-Wall Welzow in the Lausitz, Germany, a 400 Feet (120 M) Deep Hydraulic Barrier between an Existing Lake Region and an Open Pit Coal Mine

    By Stephan Fisch, Franz-Werner Gerressen

    "The use of cut-off-walls (COW) for the open pit coal mines has been used for decades. They have been used to reduce the negative hydraulic impact to the surrounding area caused by the open pit mining

    Jan 1, 2017

  • DFI
    Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"

    By R. Paul De Bruyn

    A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.

    Jan 1, 1990

  • DFI
    Stabilization of Materials – Upgrading Of Soils and Sediments to Use in Geo-Constructions

    By Helene Kennedy, Josef Macsik, Yvonne Rogbeck, Gregory Makusa, Göran Holm

    "Constructions activities in cities often imply large volumes of surplus material which could be treated by stabilization for re-use in new geotechnical constructions. Modification of dredged sediment

    Jan 1, 2015

  • DFI
    Vertical Load Test on a Drilled Shaft Installed in Glacially Derived Sediments

    By Robert C. Simpson, Ghada S. Ellithy

    "There are several methods for estimating the axial capacity of drilled shafts installed in coarse-grained soils. Most methods estimate the ultimate capacity for side friction and tip resistance. Desi

    Jan 1, 2015

  • DFI
    Route 9A Pedestrian Tunnel at the World Trade Center

    By Raymond E. Sandiford

    "The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit

    Jan 1, 2012

  • DFI
    Accuracy of Low-Strain Pile Integrity Test Results

    By Mahesh Hingorani

    Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv

    Jan 1, 2019