Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Optimizing Ore Recovery in Shallow-Dipping Orebodies (45-60 deg): A Framework for Stope Design, Drill and Blast, and Equipment Selection

    By Gurupraveen Ramanathan

    Shallow-dipping orebodies (45°–60° dip) present significant challenges for underground longhole stoping, particularly due to limited gravity flow, drill misalignment near the footwall, increased poten

    May 4, 2025

  • CIM
    Development and evaluation of NonNewtonian Fluids Stemming for Underground Mining

    By Derek Apela, Coralee Heske, Bunyamin Kahraman, Muhammad Adi

    Effective blast fragmentation is essential in underground mining, as it directly influences downstream processing efficiency and operational expenses. This study investigates the application of Non-Ne

    May 4, 2025

  • CIM
    Development of a Low-Carbon Calcium Aluminosilicate Binder for Gold Mine Tailings Backfill.

    By Farzaneh Abedini, Narain Hariharan, Lucas C. McFarlane, Nikolas A. Romaniuk, Tiffany Thayne

    The use of dewatered mine tailings as backfill material (commonly referred to as ‘paste’ backfill), is the most practiced form of backfill in Canada providing significant environmental benefits by red

    May 4, 2025

  • CIM
    Headframe Design Selection In A Salt Mine Environment: Carbon Steel Vs. Stainless Steel Headframe

    By Simon Weixiao Sun

    Conventionally, carbon steel has been the primary material for salt mine headframe construction, protected by specialty paint layers to prevent corrosion. These layers require meticulous QA/QC during

    May 4, 2025

  • CIM
    Integration of Direct Flotation Reactor (DFR) Technology: From Pilot to Full-scale Operations at Barrick's Jabal Sayid Copper Concentrator

    By Fadi Layyous Gedeon, David Hatton, Solomon Mogashoa, Tuhin Banerjee, Faisal Aljohani

    The adoption of innovative technologies in mineral processing often raises concerns about complexity and integration. However, Woodgrove’s Direct Flotation Reactor (DFR) technology at Barrick’s Jabal

    May 4, 2025

  • CIM
    Paste Slot Raise Drilling, a Novel Alternative to Slot Drilling in Long Hole Stoping: A Case Study

    By Gurupraveen Ramanathan

    Slot raises are relief holes within a stope in longhole stoping methods, designed to provide a free face that facilitates the expansion of the blasted rock during blasting, ultimately achieving the de

    Oct 1, 2024

  • CIM
    CIM Environmental, Social and Governance Guidelines for Mineral Resource and Mineral Reserve Estimation

    By CIM Environmental, Social Responsibility Society

    Within the mining industry, the pathway from exploration, to planning, construction, operation and closure has become more complex over the last few decades. The current financial, environmental and s

    Sep 8, 2023

  • CIM
    MINING EQUIPMENT CO2e EMISSION CALCULATION

    By SANDVIK WHITE

    The mining industry produces approximately 4-7% of global greenhouse gas (GHG) emissions. It is fundamental for mining operations to take immediate sustainable action to actively contribute to an emis

    Jan 1, 2023

  • CIM
    Blast Movement – A Value-Based Evaluation of the Benefits and Comparison Between Blast Movement Modeling (3D) and In-Situ Polygon Node Translation (2D)

    By Enzo Angeles, Desmond Nanchengwa, Lee Julian, Julian Ruiseco

    Since the early 1980s, surface hard-rock mining companies have searched for a blast movement model to enable grade control optimization efforts. Significant time and money were spent attempting to cre

    Jan 1, 2023

  • CIM
    Review Of Industry Best Practices For The Use And Maintenance Of Shaft Ropes On Conventional Drum Hoists And Multi-rope Friction Winders

    By P. G. Smith, A. Axiuk

    The objective of this paper is to present, from a practical perspective, a review of the most relevant maintenance procedures that are accepted or prescribed to be the most effective in optimising ser

    Jan 1, 2023

  • CIM
    Total Worker Health® And Critical Risk Management

    By Nancy E. Wilk

    In 2015, more than 1.2 million deaths annually were estimated to be caused by occupational risks (WHO, 2018). In 2021, this estimate increased with the publishing of the World Health Organization (WHO

    Jan 1, 2023

  • CIM
    CIM Leading Practice Guidelines for Mineral Processing

    By CIM Mineral Resource, Mineral Reserve Committee

    These Leading Practice Guidelines for Mineral Processing (LPGMP) were prepared by the Sub-Committee on Leading Practice Guidelines for Mineral Processing. The Sub-Committee reports to the Executive Co

    Nov 25, 2022

  • CIM
    Metallurgical Test Program For Fission Uranium Corp.’s Triple R Uranium Deposit

    By Lawrence Melis

    Fission Uranium Corp.’s Triple R Uranium Deposit at its Patterson Lake South Project is located in northwest Saskatchewan in Canada’s Athabasca Basin. As part of pre-feasibility studies for the projec

    Jan 1, 2020

  • CIM
    Opening Up Conversations On Small Modular Reactors Throughthe Deliberative Mapping Approach

    By L. Shasko

    Deliberative mapping is a method of public engagement designed to bring citizens and specialists together to inform policy decisions in conflict-laden areas of science and technology (Stirling and Dav

    Jan 1, 2020

  • CIM
    Management Of Liquid Radioactive Waste From Uranium Conversionat The Siberian Chemical Plant

    By I. A. Menshikh, S. A. Kotov, N. L. Shinkarkin

    All the cycle for conversion of natural and reprocessed uranium of ROSATOM’s “TVEL” Fuel Company is concentrated at the Siberian Chemical Plant. Conversion capacities are located on two sites, i.e. th

    Jan 1, 2020

  • CIM
    Hydrogen Mitigation In The Mcclean Lake Uranium Leaching Circuit– An Update

    By W. McCombe, G. Remple, L. Nightingale-Mercer

    The McClean Lake Mill is located approximately 850 kilometres north of Saskatoon, Saskatchewan, Canada, and is operated by Orano Canada Inc. (Orano). The mill was designed to process high grade uraniu

    Jan 1, 2020

  • CIM
    Nexgen Energy’s Rook I Project, Southwestern Athabasca Basin, Saskatchewan: The Next Generation Of Uranium Processing And Tailings Management

    By Sean Hillacre, Arthur Lieu

    NexGen’s approach to uranium processing design including the crushing/grinding and leaching of raw ore through to yellowcake precipitation and tailings management focuses on minimizing surface footpri

    Jan 1, 2020

  • CIM
    Experimental Study On Application Of Bleed In Acid Isl

    By Meifeng Zhi, Yuqing Niu, Xixin Chang, Fengqi Zhao, Weimin Qiu, Hao Wang, Zhenqian Wen, Zujun Shu

    An applicable Eluex process was developed for acid in-situ leaching (ISL) uranium mine in Bayanwula. In this process, uranium was adsorbed with strong base anion resin from the pregnant solution, then

    Jan 1, 2020

  • CIM
    Mineralogy And Modelling – Predicting Uranium Leach Extraction At Olympic Dam

    By B. Pewkliang, K. Ehrig, E. Macmillan, M. Smith, V. Liebezeit, Y. Li

    The Olympic Dam iron-oxide copper-gold (IOCG) uranium-silver deposit is the largest publicly declared uranium, fifth largest copper and third largest gold resource. Currently, the operation consists o

    Jan 1, 2020

  • CIM
    A Model City That Made Reparations From Past Uraniummining And Milling Practices

    By W. L. Dam

    Grand Junction, Colorado’s legacy with uranium mining and milling serves as a model attracting international interest. Access to water and central location to carnotite ore containing uranium and vana

    Jan 1, 2020