Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Energy and Water Requirements in the Treatment of Refractory Gold Ores
By R Dunne, J Dodd, J Snyder, F Roberto
Energy costs are steadily increasing worldwide while the availability and quality of water are becoming contentious issues between the users (municipalities/households, agriculture, manufacturing and
Sep 26, 2013
-
Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution
By M Burdick, A Harding, M Krulc, M Chappell
Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How
Sep 17, 2014
-
Implementation of the BIOX® process at the Runruno Gold project
By J A. van Niekerk, J G. Jardine, J W. Olivier
The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-
Sep 11, 2017
-
Geometallurgy – Beyond Conception
By L O’Connor, S C. Dominy
"Geometallurgy is an important addition to any evaluation project or mining operation. As a discipline, it seeks to maximise the net present value (NPV) of an orebody while minimising technical and op
Jun 15, 2016
-
Optimum embankment design for a tailings dam
By A Fyans, B Ghahreman-Nejad
This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran
Jul 23, 2018
-
Defining Sustainability Criteria in Project Design - A Case Study of the Olympic Dam Expansion
By H Bateman, I Cawrse, G Carnes, S Cawrse
In developing mineral resources, the focus typically centres on the management of identified social and environmental impacts and compliance with regulatory requirements. However, opportunities to pro
Jan 1, 2009
-
An Overview of Current Planning and Production Systems at McArthur River Mine
By M Gwynne
McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping
Jan 1, 1998
-
Performance of Vertical Flow Systems for Passive Treatment of Acid Mine Drainage
Vertical flow systems (SAPS, vertical flow wetlands) are increasingly used for passive treatment of mine drainage that is net acid. Data on 30 systems in eastern US show that well designed systems typ
Jan 1, 2003
-
Financial Modelling with the Auditor in Mind
By S G. Gemell
"The financial model is an integral component of any project evaluation based on mineral resources, ore reserves and (at least internally) exploration targets. Given the unity of purpose for preparing
Mar 8, 2016
-
Simulating Intact Rock Behaviour Using Bonded Particle and Bonded Block Models
By A Turichshev
The synthetic rock mass (SRM) approach for modelling jointed and veined rock has been at the forefront of caving geomechanics research for years. A well-constructed and calibrated SRM model can captur
May 9, 2016
-
A Geometallurgical Approach for Iron Ore Product Evaluation
By B J. Beven, A Vatandoost, J Young, S Campbell-Hardwick
The intrinsic value of iron ore depends on its physical and chemical characteristics. For example, silica and alumina are unwanted elements, downgrading iron grade and adversely affecting high tempera
Sep 29, 2013
-
A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill Reconciliation
By B Reid
"Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This
Nov 15, 2016
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and Limitations
By W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
Change Challenges for Large Open Pit Mines
By R Durchholz, A-J Heiertz, R Schmitz
Mining of lignite is the largest bulk materials handling activity in Europe. In order to mine this lignite, with an average calorific value of only a third of bituminous coal in an economical way, hig
Sep 18, 2012
-
Is Ion-Exchange Technology for Gold Extraction Ready for Commercialisation?
By J S. J van Deventer, D C. Shallcross
New developments are taking place in the recovery of gold from leached pulps that are based upon the adsorption of the metal cyanide species onto ion exchange resins. Despite the success of several re
Jan 1, 1998
-
Implementing and Managing New Technologies in Mining
A very wide range of technologies are utilised in the mining and processing of ores and a great deal of effort is expended in the development of ænew technologiesÆ to improve mining performance and ec
Jan 1, 1998
-
The Impact of Fluidised-bed Flotation for Treating Coarse Sulfides
By H Thanasekaran, M J. Mankosa, J N. Kohmuench, G H. Luttrell
"Fluidised-bed flotation has been demonstrated over the last 16 years as an effective method for improving the flotation recovery of coarse particles. This technology has been successfully deployed in
Oct 10, 2016
-
Metallurgical Improvements at KagaraÆs Mount Garnet Mine Through the Use of High Chrome Grinding Media
By R Whittering, C Greet
High chrome grinding media has been used in the mining industry for quite some time, as it often proves economical on a wear basis. However, it is unusual for an operation to change to high chrome sol
Jan 1, 2006
-
An Investigation of Air and Dust Flow Patterns Around the Longwall Shearer
By S Chaudari, T Ren, T Harvey
Management of respirable dust on longwall face remains a challenging issue for mine operators, particularly for the new generation of thick seam longwalls. A fundamental understanding of the airflow b
Jan 1, 2005
-
The Contribution of BHP BillitonÆs Ekati Diamond MineTM to Sustainable Development in CanadaÆs North
By R Beaulieu, D Burlingame, C Hanks
The Ekati Diamond MineÖ is CanadaÆs first diamond mine and is located 300 kilometres northeast of Yellowknife in the Northwest Territories. The development of the mine supports sustainable development
Jan 1, 2002