Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mine Hoist Safety ù Selected Aspects
This paper summarises the current status of the mining sector in Poland in terms of vertical transport system safety. Selected results of research programs conducted at the AGH-UST relating to mine ho
Jan 1, 2005
-
Effective Use of Mine Waste in the Design of a Residue Storage Facility, Pilbara Region, Western Australia
By A Wanninayake, E Novello, I Gillani
A residue storage facility (RSF) was designed to cater for Davidson Creek Area and Robertson Range Area operations under the FerrAus Pilbara iron ore development project in the Pilbara Region, Western
Aug 12, 2013
-
Innovative Use of Screw Press Filtration in Tailings Dewatering Plant Design
By D Nieuwkerk, V J. Absolon
"Screw press technology is an innovative approach to tackling the growing pressure to conserve water and minimise the environmental impact of mineral tailings disposal. The principles of the technolog
Sep 1, 2014
-
Geometallurgy – Fifteen Years of Developments in Codelco: Pedro Carrasco Contributions
By J Beniscelli
Some words to honour Pedro:Pedro was among the few persons with a very high level in geology modelling, resource and reserve estimation, geometallurgy development, sampling theory applications and a d
Sep 5, 2011
-
Earthmover Tyre Operations at Coal and Allied's Hunter Valley No. 1 Mine
Coal production from Coal & Allied's Hunter Valley No 1 open cut is presently hauled 10 km by road to washing and train loading facilities at Liddell. This road haul, using bottom dump trucks
Jan 1, 1982
-
Ionic structure analysis of relaxed surface of molten oxide slags for surface tension modelling
By M Suzuki
Although several models for the surface tension of molten oxide slag have been proposed, suitably accurate predictions of this property are not yet possible. The surface tension, or surface excess fre
Aug 21, 2024
-
Permanent Rockbolts - The Problems are in the Detail
By R Bertuzzi
Permanent rock bolts in civil engineering are taken as having to serve their design purpose for at least 50 years. In many projects the design life is specified as greater than 100 years. A review of
Jan 1, 1999
-
Lead Smelting at Sulphide Corporation Ltd.'s Cockle Creek Works
THIS paper is not intended to be a detailed description of the lead, smelting plant at Cockle Creek, as this has been covered in previous papers for the Institute in 1918, Proceedings No. 31, by other
Jan 1, 1923
-
Tactical medical mining rescue – closing the gap of professional medical attention in environments with difficult accessibility
By C Staak, H Mischo, A Fichtner, F Reuter
In mining and remote areas of resource industry, there has been a development towards lacking emergency medical first aid response, that creates a potential disadvantage for patients after work accide
Sep 1, 2024
-
Iron Ore Final Grinding by High Pressure Grinding Rolls and Air Classification
By F P. van der Meer, E Lessing, E Matthies
High pressure grinding rolls (HPGR) technology is growing to be a common comminution tool in iron ore processing. The technology finds a wide acceptance and presents specific benefits in coarse ore gr
Jul 13, 2015
-
The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study
By B Jones, M Chappell
Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the
Sep 17, 2014
-
Mine Environment Monitoring - So what has Changed Since Moura No 2?
By D Cliff
"It has been 17 years since the mine disaster at Moura No 2 Mine in Queensland. Recent disasters in the USA and New Zealand prompt the question what has changed since 1994. This paper att emptsto answ
Jun 1, 2012
-
Kwinana Nickel Refinery the First Year's Operation
The history of the discovery and development of the Kambalda nickel orebody. is reviewed and the decision to process the Kambalda concentrates by the Sherritt-Gordon process at Kwinana is discussed.
Jan 1, 1971
-
Geotechnical Factors Affecting the Surface Placement of Process Tailings in Paste Form
By D J. A Van Zyl, J C. Cunning
Technological advances associated with the expanded application of paste technology in underground mine backfilling are now stimulating an interest in the disposal of process tailings as paste in the
Jan 1, 1998
-
The Relationship between Blasting Parameters and Muck Pile Configuration
By D Van Doorselaere
The purpose of blasting during mining is to produce a muck pile that can be efficiently loaded and transported. There is an increasing awareness of the variation in muck pile characteristics and its e
Aug 24, 2015
-
Magnesium Alloy Production in China ù The Quay Magnesium Experience
Quay Magnesium Limited (QMG) listed on the Australian Stock Exchange in late September 2004 having raised approximately A$30 million with the object of designing, constructing, commissioning and opera
Jan 1, 2006
-
Selecting Frothers for the Flotation of Specific Ores by Means of Batch Scale Foaming Tests
By S R. Grano
The selection of the proper frother, specifically for a given ore, is essential in flotation. Traditionally, strong and stable froths are required in the scavengers, where metal recovery needs to be m
Jan 1, 2006
-
Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines
By R M. Smart, A T. Harrison
Backfill systems using unconventional cementitious binders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two unc
Jan 1, 1998
-
Preparation of Mine Fill from Process Plant Tailings
This paper reports the advances made during the development of underground mine fill technology from circa 1960 to the present and, in particular, indicates where increased input from process plant me
Jan 1, 2006
-
Observations From the Magazine Dump Clay Capping Trial
By D Ray, D Brett
A clay-capping trial was established in 1996 on Magazine Dump at the Mt Lyell Copper Mine. The trial was initially constructed under the Mount Lyell Remediation Research and Demonstration Program, a c
Jan 1, 2003