Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Manpower Development And Training In Mineral Engineering In IndiaBy R. Venugopal
The paper reviews the development of Mineral Engineering education and training programmes in India. It highlights the major academic programmes and describes the evolution of the curriculum and desig
Sep 1, 2012
-
RI 3190 Economics Of Potash Recovery From Wyomingite And AluniteBy J. R. Thoenen
Up to 1914 almost all of the world's supply of potash came from Germany and Alsace. With the cessation of shipments from Germany during the World War the importance of a domestic supply was evide
Jan 1, 1932
-
Development Of Hindered-Settling Apparatus.*By Robert H. Richards
(Pittsburg Meeting, March, 1910.) THIS is in part a review paper, indicating the various steps that have been taken in developing hindered-settling apparatus, some of the standard data that have been
Feb 1, 1911
-
OFR-85-75 Develop And Test Canopy Air Curtain Devices - 1 Introduction And SummaryBy William J. Krisko
This contract final report summarizes the design, fabrication and testing of canopy air curtain devices under Bureau of Mines Contract H0232067. The canopy air curtain device is designed to reduce the
Jan 1, 1975
-
Northwest Mining Association Sparks Glimmer of Mining HopeBy Steve Kral
The domestic mining industry may be in the doldrums but there appears to be hope, at least from a regulatory standpoint. At least one US senator believes that the events of Sept. 11, 2001 made man
Jan 1, 2002
-
IC 7552 Drilling and Blasting, Open-Cut Iron-Ore Mines Lake Superior DistrictBy Roy G. Stott, John A. Johnson, Floyd G. Anderson
"This information circular discusses drilling and blasting in open-cut iron-ore mines and is one of a series of papers describing iron-ore mining practices in the Lake Superior district to aid in prev
Mar 1, 1950
-
Powder MetallurgyBy Frances H. Clark
DEVELOPMENTS in powder metallurgy have been disappointing in 1943. If any new part has gone into large-scale production, knowledge of it has been restricted by considerations of national security. Nor
Jan 1, 1944
-
IC 7268 Tentative Bituminous-And Lignite-Mine Inspection Standards -Revised September 1943 ? IntroductionThese inspection standards have been prepared for use in the Federal inspection of bituminous and lignite mines. They are a revision of "Tentative Coal-Mine Inspection Standards," published as Bureau
Jan 1, 1943
-
Caractérisation des environnements miniers menant à la corrosion des systèmes de soutènementBy Jean-François Dorion
La corrosivité des environnements miniers souterrains est un phénomène peu étudié au Canada. En plus de détériorer les systèmes de soutènement, la corrosion s?attaque aussi à divers installations et é
Feb 1, 2008
-
The Minetrain Project; Developing an Advanced-Level Training Program for Mining Professionals in an Actual Deep Mine SiteBy Z. Zhang, M. S. Gonzalez, M. de P. Bueno, P. Holopainen, S. Luukkanen
"Despite being a field of study that requires practical knowledge and experience, mining engineering education follows the same pattern in most mining universities around the world, consisting of theo
Oct 1, 2019
-
IC 8427 Silver In The United StatesBy Arcy, D&apos Banister
The productive potential of the Nation's principal active and inactive silver mining districts has been evaluated, using 1964 economic conditions and assumed silver prices ranging up to $3 per ou
Jan 1, 1969
-
Commissioning and Operating Experience with Gekko’s Gold Ore Treatment PlantsBy Tim Hughes, Steve Gannon, Jennifer Abols
"In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal
Jan 1, 2007
-
Ingénierie de la maintenance, de la conception à l?exploitationBy Turcotte. Yves-Laurent
Notre conférencier, Monsieur Yves L. Turcotte, Vice-président et Directeur général chez Promaintech Novaxa est diplômé en génie industriel de l?Université du Québec à Trois-Rivières et détient une maî
Feb 1, 2008
-
RI 6893 Flexible Liners For Underground Support - Applicability Considerations And Experimental ProceduresBy Ernest L. Corp
First in a projected series on the use of flexible liners for support of underground mine openings, this report presents information obtained from an extensive review of the literature on this subject
Jan 1, 1967
-
Extractive Metallurgy Division - Recent Changes in Electrolytic zinc Production at Risdon, TasmaniaBy J. H. Bain, D. C. Haigh, L. C. Parsons
Jan 1, 1964
-
RI 8555 The Geologic Character of Some Coal Wants at the Westland Mine in Southwestern PennsylvaniaBy Noel N. Moebs
The coal wants at the Westland Mine in southwestern Pennsylvania consist chiefly of elongated, sandstone-filled channels with slickensided basal contacts. Tentatively identified as washouts, these cha
Jan 1, 1981
-
Geomorphological and Geophysical Investigation of the Waste Dump Site, Porgera Gold MineBy Pilon CG, Deakin RC
It is proposed that a waste rock dump be constructed on slopes consisting of soft colluvium and weathered Chim Formation mudstone at the Porgera Gold Mine, in Enga Province, Papua New Guinea (PNG)
Jan 1, 1991
-
Innovations In Copper Leaching, Employing Ferric Sulphate-Sulphuric Acid - IntroductionBy Harmon E. Keyes
Many organizations, including the Bureau of Mines, have made intensive studies of the application of leaching methods to relatively small low-grade disseminated deposits of copper ores, containing bot
Jan 1, 1930
-
IC 8271 Block-Caving Copper Mining Methods And Costs At The Miami Mine, Miami Copper Company, Gila County, Ariz.By W. R. Hardwick
This Information Circular describes the development of block-caving methods and practices by the Miami Copper Co. at the Miami mine in Gila County, Arizona. It is one of a series published by the Bure
Jan 1, 1965
-
Numerical simulation of coal pillar loading with the aid of a strain-softening finite difference modelBy A. T. Iannacchione
Numerical simulation of coal pi1lar loading has traditionally been a difficult task due to the unique and highly variable properties of coal and the inability of numerical procedures to duplicate thes
Jan 1, 1989