Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Evaluation of Large Tunnels in Poor Ground—Alternative Tunnel Concepts for the Transbay Downtown Rail Extension ProjectBy David Hopkins, Steve Klein, Bradford Townsend, Ed Sum, Derek Penrice
INTRODUCTION The Transbay-Caltrain Downtown Extension (DTX) Project involves the construction of an approximately 1.5-mile rail line that will extend Caltrain commuter service and the future Calif
Jan 1, 2007
-
Electrical Drives for Large Grinding MillsBy A. G. Spencer
"The horsepower required to drive large grinding mills has increased dramatically during the past ten years. Limitations on the amount of power which may be transmitted by a single gear and pinion hav
Jan 1, 1972
-
Additives for construction market from zinc metallurgy tailingBy Caio Moreira, Saulo De Rezende, Nelly Ruíz
The present project sought alternatives for this material through the Mining Lab Beginnings program, which was developed by Nexa in partnership with Escalab to find solutions for the company's highly
Sep 29, 2023
-
Large Excavations in Weak Mudstone for the Porgera Mine Plant DevelopmentThe plant and processing site at Porgera has been built on a levelled mudstone ridge about lkm E of the mine. Excavation of 7xl06m3 of soil and rock was necessary to achieve the required area. The
Jan 1, 1991
-
The Joseph A. Holmes Safety Association And Its Awards - IntroductionBy D. Harrington
United States newspapers of 25 or 30 Years ago ran headlines every few weeks telling of some mine disaster. Each disaster was a first-page attraction for a day or so then was forgotten until the next
Jan 1, 1940
-
Characterisation Of SO2 In Off-Gas At Zimplats SmelterBy L. Mabiza
Keywords: Pyrometallurgy, furnace, sulphur, SO2, off-gas, Zimplats Zimplats embarked on an off-gas sampling campaign in December 2009 to characterise the concentration of SO2 in the off-gas from
Jan 1, 2011
-
Development of Mine Haul Road Surfacing Condition Monitoring Through Digital Image Processing (SEPTEMBER 2015 Mınıng engıneerıng)By S. Pastor, S. Hahn
"As the concept of autonomous haulage systems (AHS) moves from prototypes to production-ready applications, the operating performance of the haul road will become critical to the overall success of au
Jan 1, 2015
-
The New Minerals Legislation in New ZealandThis paper describes the new legislative regime that will apply to the regulation of the minerals industry in New Zealand. The reform of New ZealandÆs minerals legislation was initiated in January 19
Jan 1, 1990
-
Selective Extraction of Copper from Copper Concentrates Containing High-Arsenic under High Pressure Oxidative LeachingBy Kazutoshi Haga, Batnasan Altansukh, Atsushi Shibayama
In this study, the dissolution behavior of copper and arsenic from five different copper concentrates containing 21-34.7 %wt. of Cu, 1.3-7.3 %wt. of As and 15.6-27.5 %wt. of Fe were investigated under
Jan 1, 2019
-
Erection and Commissioning Issues for Large Grinding Mill CircuitsBy Randolph R. Dreher, Michael L. Schreder
"In recent years, FFE Minerals has designed, installed and commissioned several large grinding mill circuits. This paper discusses the issues related to the erection and commissioning of large grindin
Jan 1, 2001
-
Practical Application Of A Partial Cab To Reduce The A-Weighted Sound Level At The Operator’s Station On Surface Drill RigsBy D. K. Ingram, P. Jurovcik
The National Institute for Occupational Safety and Health (NIOSH) identified hearing loss as the most common job-related disease in the United States in its 1996 National Occupational Research Agenda.
-
OFR-17(1)-75 Survey Of Past And Present Method Used To Control Respirable Dust In Noncoal Mines And One Processing Mills ? IntroductionBy S. J. Rodgers
MSA Research Corporation, Division of Mine Safety Appliances Company, was awarded a contract to conduct a survey of past and present methods used to control respirable dust in noncoal mines and ore pr
Jan 1, 1974
-
Analysis of the Hydro-fracture Potential Around Water Tunnels in RockBy Emad Iskander
The seepage forces generated around pressurized water tunnels in rock are investigated using the analysis tools of geomechanics. The theoretical background of the two-phase material behavior is explai
Jan 1, 2008
-
Geology, 40Ar/39Ar geochronology and Sn-W-Mo-bearing sheeted veins of the Mount Douglas Granite, southwestern New BrunswickBy M. J. McLeod, D. R. Lux, R. P. Taylor
"The Mount Douglas Granite constitutes the eastern part of the Saint George Batholith and contains the youngest, most differentiated phases of the batholith. It also contains extensive endogranitic, l
Jan 1, 1988
-
Towards Optimum Value in Underground Mine SchedulingBy Bryan M. Maybee
The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground
May 1, 2009
-
Blasting and Groundwater Contamination – Case StudyBy James Tarr, Matthew Eichler, Brent Tardif
ANFO was being used as one of the blasting agents on a construction site in New England. Groundwater was encountered in numerous blast holes. The blasting contractor was employing typical explosives l
Jan 1, 2003
-
The Ball Clays Of Tennessee And KentuckyBy G. W. Phelps
This discussion deals with the geology o£ the Tennessee-Kentucky ball clay deposits; their mineralogy and chemistry; methods of finding, mining and refining; and makes observations on reserves of and
Jan 1, 1972
-
Prevention of corrosion in aircraft -an overview of the evolution of materials and protective treatmentsBy L. Salnais
"Aluminum alloy structural components f or aircraft designed prior to the early 1970s, were machined from 2024, 7075 and 7079 plate, bar and forgings in either the T3xxx of the T6xxx tempers. Protecti
Jan 1, 1988
-
Minutes of the Twenty-First Regular Meeting of The Rocky Mountain Coal Mining Institute held at Price, Utah - August 26, 27 and 28, 1925In the absence of. J. B. Marks, President, the meeting was called to order by George B. Pryde, Past President. After organization, the meeting was turned over to W. J. Reid, Vice-President for Utah. A
Jan 1, 1925
-
Development Of Stillwater Mining Company's East Boulder Project Using Tunnel Boring TechnologyBy C. Alexander
Stillwater Mining Company is developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in south central Montana. A 5650 meter (18,
Jan 1, 1999