Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    An Investigation Into Introducing A New Support Element At Khomanani 2: Resin Bolts Or 1.5 M In-Stope Roofbolts ? Synopsis

    By T. J. Kolokoto

    This paper is based on a project conducted at Khomanani 2 shaft, Anglo American Platinum Limited. The main objective was to find an alternative support element in stopes to address the falls of ground

    Jan 1, 2013

  • SAIMM
    Fracturing Around Highly Stressed Excavations In Brittle Rock

    By J. Kuijpers

    Failure and fracturing are often regarded as synonymous. While this is obviously true in an environment dominated by tensile stresses, it is still not clear how failure and macro fracturing are relate

    Jan 1, 2000

  • SAIMM
    The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)

    By V. Mathebula

    Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv

    Jan 1, 2004

  • SAIMM
    Metallurgical Factors That Affect The Strand Width During Continuous Casting Of DIN 1.4003 Stainless Steel

    By C. Siyasiya

    One of the problems that is occasionally encountered during the continuous casting of DIN 1.4003 stainless steel (hereafter referred to as 1.4003) is the side bulging effect, a problem that is general

    Jan 1, 2005

  • SAIMM
    Atmospheric Oxidative and Non-Oxidative Leaching of Ni-Cu Matte by Acidified Ferric Chloride Solution

    By L. M. Sekhukhune

    The atmospheric leaching of copper-bearing matte by acidic ferric chloride solution was studied at the laboratory scale. The aim was to achieve maximum copper and nickel recovery by investigating the

    Jan 1, 2014

  • SAIMM
    Cokriging for Optimal Mineral Resource Estimates in Mining Operations

    Cokriging uses a sparsely sampled, but accurate and precise primary dataset, together with a more abundant secondary data-set, for example grades in a polymetallic orebody, containing both error and b

    Jan 1, 2014

  • SAIMM
    Financial Impact Of Resource/Reserve Uncertainty

    In constructing a financial model of a project significant effort is expended on capital and operating cost estimation, commodity price forecasts, and choice of discount rates while uncertainty in the

    Jan 1, 1999

  • SAIMM
    Recent Developments In Physico-Chemical Characterization And Modelling Of Ferroalloy Slag Systems

    Recent studies on the physico-chemical properties of molten slags and oxide solid solutions of interest are reviewed. The review covers redox and phase equilibria in slags, viscosity, diffusivity, ele

    Jan 1, 2004

  • SAIMM
    Cu-Removal From The Skorpion Circuit Using Emew® Technology

    By I. Ewart, E. Roux

    Skorpion Zinc operates a solvent extraction/electrowinning zinc plant producing over 150 000 t/a of special high grade (SHG) zinc (>99.995% Zn). In the current flow sheet copper and cadmium are cement

    Jan 1, 2007

  • SAIMM
    The Past, Present And Future Of Shotcrete At Elandsrand Gold Mine

    By K. Collett

    Elandsrand started shotcreting back in 1991. This paper will share the experiences of the mine by looking into the past, the present situation and the way Elandsrand plans to approach the future. It l

    Jan 1, 1998

  • SAIMM
    Factors Affecting The Quality Of Tunnel Infrastructure At Premier Diamond Mine

    By M. S. Smith

    Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The condition of tunnels at Premier has deteriorated to such an extent that an objective viewpo

    Jan 1, 2004

  • SAIMM
    Slope Management At Navachab Gold Mine, Namibia

    By Frik Badenhorst, René Roux, Peter Terbrugge

    This paper presents a case study where economics dictated an aggressive slope angle and where an appropriate slope management programme allowed successful completion of mining to 190m below surface.

    Jan 1, 2006

  • SAIMM
    Time-Dependent Tunnel Deformation At Hartebeestfontein Mine

    By J. D. Bosman

    The problems associated with squeezing rock conditions in tunnels are well known and have been extensively investigated in the past. Although squeezing conditions are predominantly found in tunnels de

    Jan 1, 2000

  • SAIMM
    Ounces Into Pounds - How Much Is An In Situ Ounce Of Platinum Worth?

    By A. J. Van Der Merwe, J. F. Erasmus

    One of the valuation approaches applied to Advanced Exploration Areas and Pre-Development Projects is the so-called ?in situ Mineralization Method? or the ?Yardstick Method?. This method is based on t

    Jan 1, 2006

  • SAIMM
    Ground Conditions And Support Systems At 1 Shaft, Konkola Mine, Chililabombwe, Zambia.

    By C Katongo

    Ground condition at No1. Shaft varies across the mine. The different ground conditions arise as a result of the differences in the rock strength and structure, seismicity and induced stresses in abutm

    Jan 1, 2005

  • SAIMM
    Sulphuric Acid Plant Water Saving Options

    By R. J. Forzatti

    The production of sulphuric acid from sulphur generates heat. The majority of this heat is recovered as steam and is often used to generate electricity. Heat not recovered as steam is rejected to cool

    Jan 1, 2014

  • SAIMM
    DMS Cyclone Modelling At De Beers

    By Kurt R. P Petersen

    This paper discusses the current approaches to modelling the DMS cyclone within the De Beers group. Current efforts are split into short term value-adding process understanding and longer term semi-fu

    Jan 1, 2006

  • SAIMM
    Predicting Coal Pillar Life In South Africa

    By J. N. Van der Merwe

    The data base of failed coal pillars in South Africa was analysed with regard to the time of failure in an effort to develop a method to predict how long after their formation coal pillars will fail.

    Jan 1, 2003

  • SAIMM
    Hot Work Modelling Of Two Equivalent Low Carbon Strip Steels Produced, Respectively, By The Cold Charge Route And By The Hot Charge Route

    By W. Stumpf

    Mean flow stress analyses from plant mill logs for the conventionally produced hot rolled low carbon steel from the Ispat Iscor Vanderbijlpark strip producing plant, indicated a higher temperature sen

    Jan 1, 2004

  • SAIMM
    Technologies For The Base Metal Casting Industry In Southern Africa: The Impact Of Rapid Prototyping

    By Didier Kasongo NYEMBWE

    The paper circumscribes the base metal casting industry in Southern Africa. It essentially consists in the founding of copper and zinc alloys. The challenge related to the scarcity and the unaffordabl

    Jan 1, 2007