Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014

  • ISEE
    New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.

    By Samir Garcia, Alain Mestanza

    This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining ph

    Jan 21, 2025

  • ISEE
    Productive Partnership – Advanced Blasting Technology at Newlands Coal Mine

    By Les Willan, Chris Batten, Matt Sparkes

    In late 2008 Xstrata Newlands Coal Mine in Central Queensland and Orica Mining Services engaged in discussion to investigate methodologies to change their current mining practices and overcome the iss

    Jan 1, 2010

  • ISEE
    Connecticut's "Call Before You Dig" System: New Laws and Regulations

    By Stephen G. Rieben

    Almost everyone has at least heard of the two one-call systems which serve New England. They are "Call Before You Dig", which covers Connecticut, and "Dig Safe", which covers the remaining five New En

    Jan 1, 1990

  • ISEE
    Advanced Blasting Optimization for Enhanced Productivity: The X-2Mill Solution

    By Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Martínez, Juan Navarro

    This study introduces the X-2Mill solution, a refined two-step methodology aimed at optimizing blast designs by aligning explosive energy with rock properties. The approach employs the X-4Traits Model

    Jan 21, 2025

  • ISEE
    Drilling & Blasting of a Small Diameter Shaft Next to Historic Structure

    By Corry Goumans, Ron J. Elliot

    This paper discusses the challenges encountered in drilling and blasting of a small diameter shaft underneath a parking garage in historic Gastown, Vancouver, BC. This project involved drilling in a r

    Jan 1, 2004

  • ISEE
    A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development Projects

    By Robert Lee, Pertti Paavola

    Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in

    Jan 1, 2004

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    Considerations in Blasting Influence on Grindability

    By Panagiotis (Takis) Katsabanis, Lyall Workman, Jack Eloranta

    The reduction of metallic ores to concentrate consumes a great deal of electrical energy. In the past two decades, a number of case studies have demonstrated a beneficial relationship between powder f

    Jan 1, 2015

  • ISEE
    Physics Based 3D Rock Blast Movement Modelling

    By THOMAS BAMFORD, Dale S. Preece, Amir Behbahanian, Mick Lownds

    An important aspect of blasting is rock movement and final muck configuration. Computer modeling of this process has been done in 2D for many years, revealing insights into the blasting process and en

    Jan 26, 2026

  • ISEE
    Improving Quarry Production Rates by Reducing Bucket Fill Time

    By Elliott Giles

    "Measuring a blast’s performance based on the bucket fill time or “diggability” has always been achallenge due to the subjectivity generally involved. The diggability of a blast is often based onopini

    Jan 1, 2016

  • ISEE
    Advance Blasting using Drone Mapping and AI for Comprehensive Blast Performance Analysis

    By Dr. Anurag Agrawal, Fathur Rozaq, Nella Lubis, Relinda Sanistya, Herry Saputra, Rudolf Sitorus

    In mining operations, basic drone applications such as pre- and post-blast photo comparisons, blast video recordings, and sample-based fragmentation analysis are often used to assess blast performance

    Jan 21, 2025

  • ISEE
    Electronic Detonator Timing Approaches for Surface Quarries and Metals Mines

    By Tristan Worsey, Nathan Rouse, Evan Thibaud

    Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl

    Jan 21, 2025

  • ISEE
    Determination of Presplit Borehole Pressure

    By Dr. Paul Worsey, Dr. Calvin Konya, Dr. Anthony Konya

    Development of methods to calculate presplit blasthole pressures through simplified models, namely the Empirical Model and the Detonation Pressure Model. These models can be used with variations in ex

    Feb 1, 2020

  • ISEE
    Safe Blasting Parameters And Seismic Influences During Construction Blasting

    By Mario Dobrilovic, Zvonimir Ester, Vinko Skrlec, Vjecislav Bohanek

    The first public garage in the city of Dubrovnik has been built in highly urbanized area, on location Ilina Glavica. The excavation of the building pit has been done partly by construction machinery,

    Jan 1, 2009

  • ISEE
    Study of Linear Waves on Linear Shaped Charges

    By G. Walsh, M. T. Wild

    In this paper the performance effects of linear shaped charges will be discussed. Different sized charges were tested and reviewed based on their performance used with a typical detonation method vs.

    Jan 1, 2011

  • ISEE
    Blast Optimization and Vibration Control at a Multi-Seam Coal Mine, Brazil

    By Enrique Munaretti, Vitor Rosenhaim, Jair Carlos Koppe, Joao Francisco Feijo

    The B3 mine is a multiple coal seam strip mining in operation in Rio Grande do Sul, the southernmost state in Brazil. A traditional truck & excavator operation is used to remove the overburden and sel

    Jan 1, 2012

  • ISEE
    Segregation Blasting Using Electronic Initiation at the Coeur Rochester Mine, Nevada

    By Donald Wagstaff, D. Scott Scovire

    The Coeur Rochester Mine is the largest primary silver surface mine in North America. Throughout its 17-year life, gold and silver grades leaving the tertiary crusher have typically been, on average,

    Jan 1, 2004

  • ISEE
    The Investigation Of Establishing The National Damage Criteria For Blast-induced Ground Vibrations In Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer

    The environmental problems such as vibration, and air blast are often faced, and discussed on mining, quarrying, civil constructions, shaft-tunnel, pipeline, and dam operations where blasting is inevi

    Jan 1, 2010