Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Concrete Bridge Pier Removal in an Environmentally Sensitive River

    By Paul Kunze

    When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.

    Jan 1, 2014

  • ISEE
    An Analytical Approach For Diagnosing and Solving Blasting Complaints

    By Douglas Rudenko

    Have you ever had a neighbor complain about a blast one day, but says the next day’s blast was better, even though the Peak Particle Velocity (PPV) increased? How about neighbors that complain about a

    Jan 1, 2000

  • ISEE
    Investigation into Monitoring of Initiator Performance

    By Charles Deacon

    The mining industry is constantly taking greater cognisance of their operating costs as a strategy to counter the effects of falling commodity prices. As a result, optimal operating efficiency is more

    Jan 1, 2000

  • ISEE
    "Suppression of Dust Generation during Blast Demolition of ConcreteColumns"

    By Chulgi Suk, Hoon Park, Hyonsoo Kim, Hakman Kim, Sangho Cho

    Dust emission from blast demolition and other construction activities can be a nuisance; it is widely recognized that fine particles less than 10 µm in equivalent diameter (called PM10) may cause heal

    Jan 1, 2016

  • ISEE
    The Assessment of Environmental Impacts of Blasting During The Construction of A Metro Tunnel

    By Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Mehmet Aksoy, Kagan Ozdemir, Adiguzel Deniz

    This paper presents the results of ground vibration measurements induced by blasting during the construction of the Istanbul Kadiköy-Kartal metro tunnel which has been driven at a depth of approximate

    Jan 1, 2007

  • ISEE
    Modeling of Dynamic Break in Underground Ring Blasting

    By Troy Williams, Chris Preston, Ian Lipchak

    "Underground blasting operations are challenging from the standpoint of the distribution of explosivesenergy representative of ring blasting. Energy from both shock and pressure regimes of commerciale

    Jan 1, 2016

  • ISEE
    Modeling Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By R Yang, M Lownds

    This paper reports studies showing the effects of delay scatter on the peak particle velocity (PPV) of blast vibration using a multiple seed wave (MSW) vibration model developed in recent years. The c

    Jan 1, 2011

  • ISEE
    A Modern Analytical Approach to Generating Site Specific Blast Designs

    By Bruce Vandenberg

    A 3D, PC based computer program is currently under development by Blasting Analysis International, Inc., to analyze the kinetics of full scale blasts with two or more high-speed motion picture cameras

    Jan 1, 1990

  • ISEE
    What We Learned While Determining VOD’s in Underground Small Hole Blasting

    By Scott Rosenthal, Kyle Murphy

    This paper discusses the trials and tribulations of obtaining Velocity of Detonation (VOD) readings in small diameter blast holes in an underground mine. Montana Technological University (Montana Tech

  • ISEE
    Laser Profiling and Computer Aided Blast Design using the Criterion Survey System and Win-Profile Analysis Software (b3a04a88-253a-4339-a3ec-70b988aee07d)

    By Steve Colburn

    The CRITERION Survey Systems utilize both theodolite mounted and hand held reflectorless distance meters. These are eye safe, easy-to-use, and specifically designed to endure the harsh environments ch

    Jan 1, 1997

  • ISEE
    Tunnel blast drill hole surveying – Benefits and Methodologies

    By G. Adderley, A. Wetherelt

    The problems of poor drilling in underground operations have been highlighted on many occasions. Incorrect collaring and poor angular deviation can all lead to an increased block size, dilution, over-

    Jan 1, 2009

  • ISEE
    Blasting on Logging Roads (British Columbia, Canada)

    By Raymond Chenier

    British Columbia (BC) is Canada’s most western province. The landscape in BC is amongst the most beautiful and pristine in the world. Along with its beauty come vast mountain ranges, coastal rain fore

    Jan 1, 2001

  • ISEE
    Vibration Spectral Mapping

    By Gordon M. Matheson, Douglas A. Anderson, David K. Miller

    "Traditionally, analysis of vibrations from blasting has been focused on peak particle velocity fordetermining the likelihood of both annoyance and damage. The US Bureau of Mines, in RI 8507,indicated

    Jan 1, 1997

  • ISEE
    CEE BEE ZERO TWO Construction to Destruction - A Case Study

    By Deepak Vidyarthi

    This paper deals with various measures adopted in protecting a conveyor duct (named after a Conveyor Belt that was numbered as ‘02’) housing a 1600 mm (63 inches) belt conveyor system in a large, heav

    Jan 1, 2008

  • ISEE
    A Case Study of Near-Field Vibration Monitoring, Analysis, And Modeling

    By Tamara Whitaker, James Gunderson, Ruilin Yang

    This paper presents the results of a vibration control project conducted in soft overburden at a surface coal mine located in the western United States. The study uses near-field blast vibration monit

    Jan 1, 2008

  • ISEE
    Vibration Control Blasting for Low Stability Final Wall

    By Greg Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Jan 1, 2018

  • ISEE
    The Mechanisms of Rock Damage in Blasthole Open Stope Mining: Blast Induced Versus Stress Induced

    By Qian (Ken) Liu, Remi Proulx

    A large scale blast damage project was carried out over the past two years at INCO Ltd Manitoba Division co-funded by the Canada/Manitoba Mineral Development Agreement. The experiment was conducted at

    Jan 1, 1995

  • ISEE
    Using Explosive Risk Assessment Tools for Emergency Operations Planning

    By Dean Nichols, Matt Ortel

    Explosive accidents in the United States have brought increased attention to emergency operation plans (EOP) at all facilities that manufacture, transport, or store hazardous materials – particularly

    Jan 1, 2016

  • ISEE
    Blasting Overhangs Close to a Vibration Sensitive Structure

    By R. Franfield

    This paper describes a situation that many drilling and blasting contractors have found themselves in – a client?s fear of the use of explosives. In the summer of 2007 Blasting Services Ltd was asked

    Jan 1, 2009

  • ISEE
    Synergy of Seismic, Acoustic and Video Signals in Blast Analysis

    By Brian W. Stump, David P. Anderson, John Wiegand

    Mining explosions are designed for a variety of purposes including the fragmentation and movement of materials. The blast design is dependent on the particular application intended and the material pr

    Jan 1, 1997