Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Preliminary Study into the Relationship between Air Overpressure and Face Velocity in quarry Blasting
By W. J. Birch, R. Farnfield, L. Bermingham
Whilst a significant body of research has been carried into air overpressure levels that arise as a result of the use of explosives, few published studies have actually tried to relate the movement of
Jan 1, 2008
-
Pre-Splitting With The New AIRDEK Technique
By David G. Borg, John Bussey
The new AIRDEK (tm) technique for pre-splitting in surface coal mines produces highwall conditions that have greater safety with lower costs for explosives, labor, and drilling. Successful application
Jan 1, 1988
-
Journal: From the Executive Director / The Explosives Industry and the New Economy / ISEE’s 35th Anniversary marks economic challenges
By Jeff Dean
As the Society celebrates its 35th year as an explosives industry association, it is clear that we are part of an industry that covers many sectors of economic activity. We are the voice of those who
Jan 1, 2010
-
Wipfrag and Wipjoint - To Measure, Record and Predict Blast Results
By John A. Franklin, Tom C. Palangio, Norbert H. Maerz
WipFrag systems I and II have become the world standard in photoanalysis systems to measure fragmentation. Mines, quarries and excavating contractors can now easily measure blast results and track the
Jan 1, 1997
-
A Numerical and Experimental Study of Static and Dynamic Behavior in Cemented Elastic Disks
By V. Petr, G. G. W. Mustoe, T. G. Rozgonyi
We introduced a numerical method that is applicable for the analysis of static and dynamic deformations of elastic media. In this numerical study, each elastic body is modeled with a system of several
Jan 1, 2000
-
High-wall Control at Anglo Gold Ashanti, Navachab Mine
By Charles Pretorius, Henk Ludik
Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blasting
Jan 1, 2006
-
Blasting Mitigation Measures Used to Control a Highwall Failure Risk
By Jean-Sébastien Lambert, Joseph Kabuya, Richard Simon
Managing a highwall failure risk in an open pit mine by controlling and mitigating the impact of vibrations produced by blasting operations is key to achieving safe and cost-effective operations. The
-
The 9th International Symposium on Rock Fragmentation by Blasting, Fragblast 9, 14-17th of September 2009, Granada, Spain
By Agne Rustan
The 9th International Symposium on Rock Fragmentation by Blasting was held in the Granada Conference Centre, Granada, Spain from the 14th - 17th September 2009. The Symposium was preceded by a 1 ½ day
Jan 1, 2009
-
Response of Manufactured Houses to Blast Vibrations
By Michael Mann
Two house trailers and a modem modular house, all pillar-supported with cantilevered perimeters, were monitored for structural response to vibrations from surface coal mine blasts. Due to the large bl
Jan 1, 2000
-
Methods of Evaluating and Predicting Fragmentation
By Claude Cunningham
The primary reason for blasting is to fragment rock. In production blasting, the fragment sizes produced are known to exercise an overwhelming influence over working costs: handling costs and tonnage
Jan 1, 1995
-
Subdrill – The Underutilised Blasting Parameter
By Stephen Mansfield
In metalliferous mining operations, subdrill is that portion of the blast hole that is drilled below the target grade elevation, and in most cases loaded with explosives. Its primary aim is to enable
-
Transition of the Seismograph from a Tool of Litigation to a Tool of Production Efficiency
By David S. Bowling
The ER-300 Series White Recorders were developed to provide on economical, yet invaluable instrument for those who desire permanent recordings of such data OS displacement, vibration, concussion (air
Jan 1, 1990
-
Toxic Fume Comparison of a Few Explosives Used in Trench Blasting
By Marcia Harris, Richard Mainiero, Michael Sapko
Since 1988, there have been 17 documented incidents in the United States and Canada in which carbon monoxide (CO) is suspected to have migrated through ground strata into occupied enclosed spaces as a
Jan 1, 2003
-
Development of Light ANFO
By Yasunori Kosaka, Junya Tokita, Aramaki Shosaku, Inoue Junji
Light ANFO that satisfies blasters and customers who want to reduce the amount of explosive consumption without changing blasting effects and designs and passes Cap sensitivity test regulated by law.
Jan 1, 2002
-
Journal: Recent Projects / Dekalb County, Georgia CBI Assists County with Mock Disaster Training
Controlled Blasting, Inc. (CBI) located in Norcross, Georgia recently teamed with the Dekalb county fire marshals office to stage a mock disaster to test new trainees of Community Emergency Response T
Jan 1, 2010
-
Digital Detonators keep PA Coal Mine Operating
By Douglas Bartley, Jay Elkin
The state of Pennsylvania was at one time one of the leading coal producing states in the east. However, legislation and industry trends over the last 10 years have adversely affected the amount of bi
Jan 1, 2003
-
Energy-based Vibration Predictor Equations and Blast Damage Index for Blasting Gallery Panels
By Sri C. Sawmliana, P. Pall Roy
Damage to underground roof and pillars in blasting gallery (BG) panels has been an increasingly important area of study in recent years due to the invention of new explosives and cord systems which ha
Jan 1, 2004
-
The Field Application of a Low -Cost Shock Sensor
By Rob Farnfield, Charlie Adhock
The measurement of near-field shock has always been an attractive proposition for those working in the field of explosive and blast performance. The most commonly employed technique involves the use o
Jan 1, 2005
-
New Lightweight Dragline Buckets
By Rowan A' Murry Karstel
One way to ensure dragline productivity is by Increasing the size of the dragline bucket. In August 1994, Optimum Colliery in conjunction with Van Reenen Steel, Northwest Applied Technology, SSAB of S
Jan 1, 1998
-
"Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"
By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo
For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish
Jan 1, 2016