Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Development of an Integrated IT System at Albian Sands Energy
By Louise H. Michaud
Albian Sands Energy is scheduled to begin production at its oilsands operations in the fall of 2002. Start-up includes the selection and implementation of over 75 IT systems or computer applications.
May 1, 2002
-
Changes in grade, volume and contained gold during the mining life-cycle of gold placer deposits
By J. D. Bliss, G. J. Orris, W. O. Menzie
"Analysis of gold placer data from gold placers throughout the world suggests that gold grades and volumes cannot be used to distinguish between most types of gold placers. Only the alluvial plain and
Jan 1, 1987
-
Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)
By N. Romani, R. Provost
"Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i
Jan 1, 2016
-
Secondary Recovery of Bitumen Using Jameson Downcomers
By R. Siy, O. Neiman, B. Hilscher
"A full-scale prototype of “Jameson Downcomer” technology has been installed and tested on a Tailings Oil Recovery (TOR) vessel in Syncrude’s Mildred Lake extraction plant. Jameson Downcomers are a ty
Jan 1, 2012
-
The Engineer and the Diamond Drill in Northern Ontario
By C. H. Hopper
DIAMOND drills have played an important part in the development of mines for many years. Recently. they have also entered the production field arid the use of diamond drills m the primary breaking of
Jan 1, 1943
-
Rebâtir, réparer et protéger les équipements industriels de l?usure
By Iann Bouchard
Introduction à l?abrasion et l?érosion Avec le temps, tout solide va éroder et user les métaux les plus durs; de plus, la Corrosion va aussi laisser une couche mince et faible d?oxydation qui sera ra
Feb 1, 2008
-
LIDAR Geotechnical Mapping for the Construction of Deep Underground Science and Engineering Laboratory at the Former Homestake Mine
By Zbigniew J. Hladysz
A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the US National Science Fou
May 1, 2011
-
Goldstream Concentrator Design and Operation
By Stuart McTavish
"Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th
Jan 1, 1985
-
Shaft Boring with Oil Weil Drilling Equipment at Lynn Lake
By Peter A. Cain, John C. Folinsbee
"A 4-ft.-diameter shaft has been drilled to a depth of 2,790 ft. in strong, hard, basic Precambrian rocks at Lynn Lake Manitoba. This was done on the property of Sherritt Gordon Mines Limited for the
Jan 1, 1966
-
Fine Grinding with the Szego Mill - An Update
By G. Papachristodoulou, O. Trass
"Performance data for both wet and dry grinding of materials have been obtained in this novel, planetary ring-roller mill over wide ranges or operating conditions. The Szego mill consists of a station
Jan 1, 1986
-
Root-Cause Analysis of the Lacy Copper Phenomenon
By R. Ramírez, N. Aslin, G. Ríos, T. Bravo, A. R. Almansa
Lacy copper has been an on-going concern at Atlantic Copper for at least 10 years and was first reported to Glencore Technology in mid-2010. Over the past 12 years, many of the plates were replaced du
Jan 1, 2019
-
Review of 2004 JORC Code and Comparison with National Instrument 43-101
By Patrick R. Stephenson
The current version of the JORC Code was issued in 2004 and since that date the Australian Securities Exchange, in collaboration with JORC, has issued a number of companies? updates to provide guidanc
May 1, 2010
-
The Future of Coal -Carbon Feedstock Gasification-
By Paul R. Clark
Outline of Presentation ? Brief review of gasification and IGCC ? Polygenerationand its potential ? Why gasification today ? Major technology providers and their activities ? US initiatives ?
May 1, 2006
-
The Importance of Structural Geological Mapping and Slope Monitoring in Open Pit Slope Stability
By Nick D. Rose
The importance of structural geology in open pit slope stability is overlooked in many mining operations due to pressures to cut costs and minimize mine personnel. As a result, mine geology staff are
May 1, 2002
-
Climate Change: Framing The Challenge; Strategic Approaches for the Mining Industry
By Henry Stoch
It?s a green, green world ? Public concern about the impact of human activities on the environment and the roles that businesses play in that impact is rising. What?s happened in the last few months
May 1, 2008
-
Cable Shovel Simulation leading to A Novel Dipper Design
By Ning Shi
This paper suggests an alternative design approach for an innovative shovel dipper, for use in ground conditions where cutting of virgin ground rather than scooping of blasted material is required. No
May 1, 2004
-
Quantitative characterization of the REE minerals by QEMSCANTM from the Nechalacho Heavy Rare Earth Deposit, Thor Lake Project, NWT, Canada
By Tassos Grammatikopoulos, Sarah Prout, William Mercer, C. Gunning
"The Nechalacho rare metal deposit is located in NWT, Canada. Avalon Rare Metals Inc. is now evaluating processing techniques for recovery of REE to be used in the industry. QEMSCANTM analysis coupled
Jan 1, 2011
-
Emergency Egress/Ventilation Raise Innovations in Directional Raise Boring & Remote Shotcrete Application
By Eric Schraml
Wardrop Engineering and the Placer Dome?s Campbell Mine Design Team utilized leading edge directional raise boring techniques and an innovative, remote controlled application of steel fibre reinforced
May 1, 2002
-
Building Nunavut?s First Diamond Mine: The Jericho Diamond Mine Canada?s Third and Nunavut's First Diamond Mine
Project Details ? Located 420 km northeast of Yellowknife, Northwest Territories ? Jericho kimberlite discovered in 1995 ? Feasibility study showed +3,000,000 carats recovered from 2.6 million to
May 1, 2006
-
Global Approach to Managing Deep Mining Hazards
A series of fault slip seismic events have occurred at Garson mine. The events have occurred during development advancement exposing faults, after the extraction of single stopes due to mining induced
May 1, 2009