Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Modifying the Design of Drying Chamber Flights of the Gol-E-Gohar Pelletizing Plant Ball Mill

    By S. Banisi, A. R. Hasankhoei, Gh. Parsapour, A. R. Ghasemi

    At the Gol-E-Gohar mining and industrial Company, a pelletizing plant, which includes two parallel dry closed grinding circuits and a pellet production circuit, produces 600 t/h. Each grinding circuit

    Jan 1, 2016

  • CIM
    Plant Anomalies Related to Some British Columbia Ore Deposits

    By William H. White

    "AbstractThe value of anomalous metal contents of trees as an aid to the discovery of mineral deposits was tested under field conditions cm four known ore deposits. Results indicate that a base-metal

    Jan 1, 1950

  • CIM
    Sustainable Development And Self-Organization

    By F. Flores

    With the World Summit for Sustainable Development planned for 2002 in mind, nine of the world's largest mining companies decided to initiate a project to examine the role of the minerals sector i

    Jan 1, 2007

  • CIM
    Loading and Blasting a Hot Pillar Remnant

    By Roland Hunt

    This paper deals with the practical problems as sociated with blasting a heated pillar remnant. This pillar remnant was the final stage in the blasting of a multi-stag e pillar blast. Production from

    Jan 1, 1977

  • CIM
    Copper smelting to the year 2000

    By W. G. Davenport

    Methods of extracting copper are evaluated in terms of innovations during the 1970's, and predictions to the end of this century are made. It is concluded that between one and two new smelters an

    Jan 1, 1980

  • CIM
    Manitoba sends strong signal

    By Robert B. Parsons

    "The Province of Manitoba tabled a Budget on March 11, 1992, which contains some important new initiatives designed to improve the fiscal environment for mining in the province. In addition, the Minis

    Jan 1, 1992

  • CIM
    New developments in the mining of underground pillars at Thompson Mine

    By Rod Maclean, George Stewart

    "This paper covers the planning, development, and mining of an underground pillar complex using a bulk mining method. To achieve the long-term goal of continually improving our operating processes, al

    Jan 1, 1988

  • CIM
    The Captain North Extension Zinc-Lead-Silver Deposit Bathurst District, New Brunswick

    By K. D. A. Whaley

    Abstract -The Captain North Extension deposit consists of five sulfide lenses hosted in cherty and chloritic metasediment that is bounded by quartz-eye rhyolite and laminated rhyolite . Lens 2 consist

    Jan 1, 1992

  • CIM
    Station excavation into a production shaft

    By P. Hickey, A. Oliver

    "In March 1993, Ram Raising Limited was faced with a challenge. Placer Dome Incorporated, Dome Mine Division requested from Ram Raising that they design station excavation into the existing No. 8 shaf

    Jan 1, 1995

  • CIM
    An Environmentally Friendly Processing Flowsheet for the Beneficiation of Low-Grade Wolframite with High Arsenic

    By Yuhua Wang, Wei Sun, Dongfang Lu, Yuehua Hu, Tao Jiang

    "With the continuous depletion of high-grade tungsten ores, the low-grade refractory wolframite has become an important source for the tungsten industry. However, the large-scale utilization of low-gr

    Jan 1, 2016

  • CIM
    Training the Mining Engineer

    By W. G. McBride

    The mining industry has already become highly technical in all its branches and this has brought about specialization in mining engineering. Increasing demand for mineral products, exhaustion of high-

    Jan 1, 1932

  • CIM
    Sustainable use of Geotechnical Data for Improved Mine Planning and Design Through Multi-Parametric Modeling

    By Andrew D. Lapworth

    The use of geological and grade models has been standard practice in mine design for many years now, with a wide range of software available to create and analyze the models. Although geotechnical par

    May 1, 2007

  • CIM
    Tonnage Uncertainty Assessment of Vein-Type Deposits Using Distance Functions and Location-Dependent Correlograms

    By David F. Machuca-Mory

    Modelling the geometry of a vein is a crucial step in resources estimation. The resulting models are used as mineralization domain boundaries and have a direct impact on the tonnage of estimated resou

    Oct 1, 2009

  • CIM
    Use of a Chelating Agent in Kinetic Studies for Contaminated Neutral Drainage Prediction of Metal Bearing Waste Rocks

    By P. Plante

    Contaminated neutral drainage (CND) is characterized by the presence of metal concentrations above regulatory requirements at circumneutral pH in mine drainage. The generation of CND by tailings and w

    Aug 1, 2013

  • CIM
    The use of Bauxsol? Technology in Mine Site Management and Remediation

    By D. McConchie

    The use of Bauxsol? (physically and chemically modified alumina refinery residues) to treat acid rock drainage (ARD), and sulphidic waste rock and tailings, provides new options for managing some intr

    May 1, 2003

  • CIM
    Operations of Western Dominion Coal Mines, Limited

    By K. John

    "THE most recent estimate of minteable coal reserves in Saskatchewan was made by the Federal Royal Commission on Coal (1944- 6). Saskatchewan was then estimated to have some 24 per cent of the Canadia

    Jan 1, 1952

  • CIM
    Path Planning for Loading Operations by Wheel Loaders Based on Position Control of the Bucket

    By Shigeru Sarata

    A wheel loader is one of the main loading machines in open pit mines. The authors have been conducting research and development on autonomous operation of loading by a wheel loader. The most common lo

    Aug 1, 2013

  • CIM
    20 Years of Don Process and its new Benefits for Cu-Ni-Pgm Bulk Concentrates

    By Paivi Suikkanen, Kari Hietala, Kaarlo Haavanlammi

    "Processing of high-magnesia concentrates, the recoveries of nickel and copper, as well as those of platinum group metals (PGM’s) and cobalt are key issues of the Nickel Smelting technologies. PGMs ar

    Jan 1, 2014

  • CIM
    The application of a total energy system at the Polaris mining project

    By A. Nielsen

    "The Polaris mining operation (Fig. I) is located on Little Cornwallis Island in the Canadian Arctic, an area with a very limited shipping season and a hostile climate. The operation consists of the u

    Jan 1, 1984

  • CIM
    CIM Definition Standards (Canada) - CIM Definition Standards on Mineral Resources and Mineral Reserves

    "In 2000 the CIM Council approved the CIM Standards on Mineral Resources and Reserves – Definitions and Guidelines, developed by the CIM Standing Committee on Reserve Definitions. The Definition Stand

    Jan 1, 2003