Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Comparison of the Anchorage Performance of Cable Bolts Based on a Newly Developed Testing Methodology"With the plethora of cable bolts on the market, geotechnical engineers can be baffled by the differences in performance claims from the manufacturers but perhaps more importantly they are sometimes a
Jan 1, 2015
-
A Cloud-Based Framework for Online Management of Massive Bims Using Hadoop and WebglBy Hung-Ming Chen
This paper presents a Cloud-based system framework for providing a web-based building information model (BIM) service. Cloud computing technologies were used to develop a BIM data center, which can ha
Aug 1, 2013
-
SAG Mill Operation Optimization for Different Types of Ores Based on a "Virtual Geologist"By L. Tapia
The main disturbance for stability in primary grinding using SAG mills is related to continuous changes in the ore being fed to the plant, such as size and hardness. Searching for stability is the fir
Jan 1, 2007
-
A Computer Simulation of an Agitation Mill Abrasion Process for Waste Printed Circuit BoardsBy K. Torigoe, S. Owad, C. Tokoro, Y Tsunazawa
The mechanism of an abrasion process to recover metal values by removing components from printed circuit boards (PCBs) is modeled using a discrete element method (DEM) simulation. To simulate the abra
Jan 1, 2011
-
Metallurgical Optimisation after the Replacement of two BOF Vessels at Dillinger Hütte/GermanyBy V. Fiedler, H. Lachmund, R. Bruckhaus
"After producing some 50 million tonnes of crude steel the two BOF vessels at Dillinger Hüitte steel plant had to be replaced in 2000/01 due to large deformations. The new vessel design was optimised
Jan 1, 2004
-
Complex Processing of Phosphor Production Slag with Rare Earth Metals Recovery and Deriving of Silicon-Containing SolutionBy Ata Akcil, Z. B. Karshigina, Ye. G. Bochevskaya, Z. S. Abisheva
"Phosphorus slag is the most heavy-tonnage waste of yellow phosphorus production, which is stored in the dump fields for many years creating ecological problems in the regions. Despite of the actions
Jan 1, 2016
-
Operational Fractionation of Arsenic in a Mining SoilBy V. Chatain
The environmental assessment of historical mining sites contaminated with various inorganic species, as also the determination of remediation targets require a better knowledge of pollutant-bearing ph
Aug 1, 2013
-
Stability Analysis for Large Scale Underground Caverns Based on Microseismic Monitoring and Numerical SimulationBy N. W. Xu, C. Sha, F. Dai, Y. G. Zhu, B. Li
Underground caverns stability and excavatability of rock masses are of significance in geotechnical engineering, in both design and construction stages. Risks associated with underground group caverns
Jan 1, 2015
-
AL KIN - A new generation of fluxing and purging technology for a cleaner AluminiumBy F. Filzwieser, K. Gamweger
The process of gas purging in molten aluminium has been an industrial practice in Europe for many years. The advantages are a reduction in the hydrogen content and impurities in the melt, as well as a
Jan 1, 2004
-
Cerro Verde Concentrator – Four Years Operating HPGRsBy S. Koski, J. Vanderbeek, J. Enriquez
"The Cerro Verde copper-molybdenum porphyry mine, majority owned and operated by Freeport- McMoRan Copper & Gold, is located 30 km southwest of Arequipa Peru. The concentrator, which produces copper a
Jan 1, 2012
-
Mining Methods at Britannia, British ColumbiaBy J. I. Jr. Moore
Many articles have been written about the various operations of Britannia mines and mill, as well as treatises on the geology and ore deposits. A partial list of these papers is given below. Most of t
Jan 1, 1928
-
Geochemical rock sampling for gold in the Munro Township area, Ontario: An orientation surveyBy G. R. Webber, P. J. Whittaker
"A multielement (Au, Cu, Pb, Zn, Ni, c-, Ag, As, Hg, Co, and S) geochemical rock sampling survey was carried out in 1977 in the Munro Township area of Ontario to assess the application of rock geochem
Jan 1, 1989
-
Spatial Variations of Pulp Properties in Flotation - Implications for Optimizing Cell Design and PerformanceBy Jan Rosenkranz, Anders Sand, Lisa Malm, Nils-Johan Bolin
Within flotation technology the general trend is towards very large cells. Scale-up is usually done by postulating geometrical similarity, which implies keeping the aspect ratio constant when increasi
Jan 1, 2016
-
Formulation of a Framework for Quality Assessment of Precast Concrete Based on3D Laser ScanningBy M. K. Kim
This study presents a framework for quality inspection of precast concrete components using the 3D laser scanning technique. As precast concrete-based rapid bridge construction is getting standardized
Aug 1, 2013
-
Development and Implementation of an Expert System for Grinding Control at the Dome MineBy John Eggert, Paul Benford
"Since 1982, Placer Dome Inc. -Dome Mine has steadily increased mill throughput. Tonnage has increased from a nominal design capacity of 3000 short tons per day, attained in 1985, to 4130 stpd by the
Jan 1, 1994
-
A laboratory evaluation of the 25 mm Garford bulb anchor for cable bolt reinforcementBy A. J. Hyett, N. Hedrick, J. Blackall
The Garford bulb anchor is a modified cable geometry developed and patented by Garford Ply Ltd. of Australia, and which has recently become widely available in Canada. It is produced by deforming the
Jan 1, 1995
-
Health Effects Index-practical tool for atmospheric evaluation in highly dieselized underground mining operationsBy Antonio Fontana
"Environmental problems encountered with the use of diesel equipment in underground mining operations are discussed. The concept and procedure o implementing the Health Effects Index equation as a mea
Jan 1, 1982
-
Use of Gravity Drainage and Quasi-Homogeneous Dykes for Containment of Oil Sand TailingsBy Lee Nichols
The Oil Sand Industry in northern Alberta, Canada, disposes of the by-products of bitumen extraction into tailings ponds. The mix of tailings sand and mature fines, with gypsum added as a flocculent,
May 1, 2004
-
Quality Assessment/Quality Control (QA/QC) for Resource Estimation at Inco Technical Services LimitedBy Christopher R. Davis
Resource modelling is the basis for any economic appraisal of a mining project and includes a number of steps from data acquisition and validation to resource reporting and classification. At each s
May 1, 2001
-
Influence of Water on Subcritical Crack Growth and Long-Term Strength for Carbonate RockBy Y. Nishida, Y. Nara, T. Ishida
Understanding time-dependent deformation and fracturing in rock is essential, because the information of the long-term stability of rock is required for many sub-surface structures excavated in a rock
Jan 1, 2015