Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Real-Time Mass Balance Calculation for a Pilot Grinding Circuit

    By R. Lanthier, A. Broussaud, J. C. Guillaneau, D. Hodouin

    This study presents a method for upgrading the information extracted from the measurements given by the sensors of a pilot grinding circuit. For that purpose raw signals are combined to process models

    Jan 1, 1989

  • CIM
    Improving Energy Efficiency in Barrick Grinding Circuits (309a678f-c2fc-4f23-900a-4b50d1de7610)

    By Christian Brits, Bob Blain, Lloyd Buckingham, Juliu Stieger, Jean-Francoi Dupont

    Barrick Gold Corporation (Barrick) has undertaken innovative methods of evaluating and improving the performance of grinding mills in several of its operations around the world. The results have been

    Jan 1, 2012

  • CIM
    Investigation of Liner Shape Effects on Load Movement in Tumbling Mills by Discrete Element Method (Dem) - The Sarcheshmeh Copper Complex and Gol-E-Gohar Iron Ore Company Sag Mill Cases

    By Z. Bibak, S. Banisi, A. Ghasemi, E. Nematollahi

    "The major importance of liners in grinding is their role in providing an appropriate trajectory for the charge. Since it is not possible to study the charge movement by direct observation in operatin

    Jan 1, 2016

  • CIM
    Monitoring Surface Roughness of Copper Electrodeposits Using Scaling Analysis

    By J. Keough

    During industrial electrowinning of copper, uneven growth can impact current efficiency, cause short-circuits in the cell and negatively impact the final quality of the metal product. Copper electrode

    Jan 1, 2019

  • CIM
    Near-Term, Low-Cost and Secure PGM and Base Metal Production

    An Attractive Investment ?Near term low cost and secure PGM producer ?restricted supply legislated demand ?strong pipeline of resource development ?Building Canada?s largest undeveloped PGM-Cu res

    May 1, 2010

  • CIM
    Estimation of Shock Loss Factors At Shaft Bottom Junction Using Computational Fluid Dynamics and Scale Model Studies

    By T. Purushotham, B. Samanta

    ABSTRACT; The shaft bottom junction in a mine ventilation system is an important source of shock loss due to the combined effect of bend and area change. The occurrence of high-volume ?ow rates throug

    Jan 1, 2010

  • CIM
    The Mineral Industry of Nova Scotia

    By J. P. Messervey

    THE story of the efforts made by the Department of Mines of Nova Scotia in the search for and investigation of mineral resources for the Canadian war effort began in the spring of 1937. During the pas

    Jan 1, 1945

  • CIM
    Treatment of Gold Mill Effluents for Removal and Recovery or Destruction of Cyanide -A Summary of the Joint Project with Six Gold Mills

    By G. M. Ritcey, V. M. McNamara

    "In the processing of gold ores by the cyanidation route, effluents which are discharged to the tailings areas can contain up to several hundred parts per million of cyanide in complex combination wit

    Jan 1, 1978

  • CIM
    An optimized drive system for electric vehicles

    "This paper describes an alternative method of vehicle control which uses a micro-processor to control the field current and armature voltage concurrently. The field tests carried out and the conclusi

    Jan 1, 1982

  • CIM
    On The Use of Copper Concentrates Blended With Complex Gold Concentrate for Gold Recovery Using the SKS Smelting Process

    By Yan Jie

    A series of production technologies are described for gold recovery from complex gold concentrate blended with copper concentrate treated in the SKS smelting process comprising: 1) Feed preparation an

    Jan 1, 2019

  • CIM
    Process for the recovery of niobium oxide from pyrochlore concentrate

    By G. Gabra

    "A process of leaching niobium oxide from pyrochlore concentrate using hydrofluoric acid is described. Variables such as acid concentration, temperature, reaction time, solid/acid ratio, agitation spe

    Jan 1, 1985

  • CIM
    Key Anacon Sulfide Deposit, Gloucester County, New Brunswick

    By R. R. Irrinki

    Abstract -The Key Anacon deposit consists of four sulfide zones called, from south to north : Key Anacon No. 1, Key Anacon No. 2, Key Anacon No. 3, and Key Anacon Copper Zone. Massive sulfides of zo

    Jan 1, 1992

  • CIM
    Kemess South Mine Closure and Reclamation

    By Georgia J. Lysay

    Kemess South Mine ended operations in March 2011. Final reclamation works began during operations in 2008 in anticipation of closure. The focus of reclamation during mine operations was on the inactiv

    May 1, 2011

  • CIM
    Radium-226 removal by precipitation and sedimentation in settling ponds

    By J. N. Hilton, D. Moffett, E. Barnes

    "A recent pilot-plant program carried out at Rio Algom's Quirke uranium mine at Elliot Lake, Ontario is described. The goal of the research was the production of tailings basin effluents which we

    Jan 1, 1981

  • CIM
    Bulkhead pressure measurements ill model fill pours

    By James J. Roettger, Robert J. Mitchell

    "The results of a series of model stope pours designed to investigate working pressures on bulkheads during hydraulic pouring of classified tailings backfill are reported. Total bulkhead pressures and

    Jan 1, 1984

  • CIM
    The use of rubber in the mining industry

    By W. Fergusson

    This paper takes a look at the use of rubber to provide corrosion resistance and wear resistance in the mining industry. The longer life and reduced down time involved with the use of rubber are stres

    Jan 1, 1979

  • CIM
    Small Diameter Fuse

    By A. Michalkow

    DELN ITE Mines Limited is located in Deloro township, on the west end of the south break of the Porcupine Camp. Mining operations are currently being carried out on the downward extension of a system

    Jan 1, 1962

  • CIM
    Repair Process Development for Blisk Applications in Aero Engines

    By L. Zhu, S. Kaierle, M. Dahmen, C. Zimmermann, T. Haubold, I. Kelbassa, C. Mattern

    Application of integrally bladed disks (blisks) is of increasing interest in compressors of aero engines. Blisks are preferred due to their potential for size and weight reduction, for increased perfo

    Jan 1, 2006

  • CIM
    Étude métamorphique d?un système hydrothermal à Cu-oxydes de fer métamorphisé au faciès amphibolite supérieure à granulite, Groupe de Wakeham, secteur oriental de la Province de Grenville, Québec.

    By Anne-Laure Bonnet

    Les connaissances acquises au cours des dernières décennies sur les gîtes de métaux de base et précieux intensément métamorphisés (p. ex. Vokes, 1991; Cornell et al., 1992; Zaleski et Peterson, 1995)

    May 1, 2003

  • CIM
    Évaluation des Pressions dans les Chantiers Remblayés et sur les Barricades

    By Michel Aubertin

    Les rejets miniers sont communément utilisés, depuis plus de 60 ans, comme matériau de remblayage des chantiers souterrains. Les roches stériles et les rejets de concentrateur sont employés comme remb

    Nov 1, 2008