    Planning Radiological Risk Mitigation For Remediation Of Abandoned Uranium Mines

    By David Sanscartier, Elizaveta Petelina, Alexey Klyashtorin

    This paper provides an overview of the radiological risk mitigation approach applied by the Saskatchewan Research Council (SRC) for the remediation of 35 legacy uranium mine sites in northern Saskatch

    Jan 1, 2020

  • CIM
    Design Methodology for Large Underground Powerplants

    By R. Plassart, F. Laigle

    "As a powerhouse, a transformer or a valve chamber, large underground caverns are a major element of hydropower plant. On the contrary to galleries and shafts which are linear and long underground str

    Jan 1, 2015

  • CIM
    Raise Drilling and Equipping a 1,892 Metre Deep Service Shaft in Zambia

    By B. Burger, T. Bester, S. Deonarain, L. S. Schultz

    "This paper details the process followed to raise drill and equip a 6.1 metre diameter vertical service shaft at Glencore’s Mindola Deeps project in Kitwe, Copperbelt Province, Zambia. The project sco

    Jan 1, 2019

  • CIM
    Nickel-Copper Smelter at Falconbridge

    By J. R. Gill

    Introduction The property and plant of the Falconbridge Nickel Mines, Limited, is situated about 13 miles northeast from Sudbury, in Falconbridge township, near the eastern extremity of the southern

    Jan 1, 1932

  • CIM
    Geochemical Behavior of Mine Tailings at the Abandoned Mines Of The Upper-Moulouya Lead District (Morocco)

    By R. Argane

    In this work we assessed the geochemical behavior of concentrator tailings deposited at the abandoned mines of Zeida and Mibladen (Upper Moulouya, Morocco), using physico-chemical analyses, mineralogi

    Aug 1, 2013

  • CIM
    Learnings from Infrastructure Replacement within an Operating Refinery

    By L. Trytten, S. Bass, P. Nawrocki, J. Mercer

    The Sherritt Fort Site nickel refinery and fertilizer plant has been operating continuously since 1954. The ammonia leach process uses ammonia and sulphuric acid, producing nickel and cobalt and an am

    Jan 1, 2015

  • CIM
    Recent Advances in Precision Surface Mining Techniques

    By G. J. Hutchins

    Precision surface mining is gaining traction in the iron ore, copper, iodine, limestone, bauxite, coal and gypsum markets. In this paper, we first address the possible improvements of a surface miner

    Aug 1, 2013

  • CIM
    Recovery of Zinc from Effluent Stream Using Solvent Extraction

    By B. Grinbaum, A. Mazuelos, F. Carranza, N. Iglesias, M. Avila, J. L. Lozano, G. Perez, R. Romero, M. \/aliente

    Following a failure of a tailings pond darn at a mine in Andalusia, Spain, a huge effluent stream, that contained about 1 g/1 Zn and significant amounts of ferrous, ferric, calcium, copper, aluminium

    Jan 1, 2008

  • CIM
    The Risk in Risk Management

    By D. S. Evans

    Major Project Blues Over the last two decades, almost every major project has suffered significant cost overruns, significant schedule delays, and/or poor quality work. Exceptions are rare and most

    May 1, 2013

  • CIM
    Metallurgical Improvements in the Treatment of Copper-Nickel Ores

    By The Staff

    Introduction It is the purpose of this paper to discuss a number of the metallurgical improvements in the technology of copper-nickel ore treatment which have been introduced during recent years in

    Jan 1, 1948

  • CIM
    The Galore Creek porphyry copper-gold deposits, northwestern British Columbia

    By S. G. Enns, E. W. Yarrow

    "Situated about 200 km southeast of Juneau, Alaska, within the lower Stikine River region of northwestern British Columbia, the Galore Creek porphyry Cu-Au deposits are hosted by Upper Triassic to Low

    Jan 1, 1995

  • CIM
    Recovery of Hematite from HPAL Residue of Laterite Ore

    By G. Azimi, C. A. Ang, F. Zhang

    "Nickel recovery from laterite ores generates large amounts of solid and liquid wastes. This is primarily due to the low concentration of Ni (about 1.4 wt%) in the feed ore to the High-Pressure-Acid-L

    Jan 1, 2017

  • CIM
    Incremental Process Improvements at the Pogo Mill

    By J. Sliwinski, H. Kikutani, J. Atwood, D. Larimer, J. Pyecha

    "The Pogo mine start-up milling targets of 2005 are vastly different than the targets of today. Improvements have been driven by unintentional design oversight, continual circuit optimization or optim

    Jan 1, 2017

  • CIM
    Using a Constraint Model to Optimize a Mineral Processing System

    By A. Khan, C. Ciriello

    The purpose of this paper is to demonstrate the value of constraint modelling in optimization of mineral processing systems. This will be achieved by first understanding the overall concept of variati

    Jan 1, 2015

  • CIM
    The Nature of Solute Clusters and GP-Zones in the Al-Mg-Si System

    By O. Engler, J. Friis, S. J. Andersen, C. D. Marioara, Y. Aruga

    "This work investigates the early stages of precipitation in Al-Mg-Si alloys using a combination of high angle annular dark field scanning transmission electron microscopy (HAADF-STEM), selected area

    Jan 1, 2018

  • CIM
    Matching mining methods to complex coal geology

    By B. J. Morash

    "The six mineable coal seams at Quintette Coal Limited (QCL) vary in thickness from 0.75 m to 9.5 m and include waste partings varying from 0.2 m to 4 m thick. They are highly faulted and folded in so

    Jan 1, 1988

  • CIM
    Sä Dena Hes Joint Venture Concentrator Operation

    By I. Orford, V. Rozon

    "The Sä Dena Hes Joint Venture Mill was designed to process 450,000 tonnes per year of ore grading 11.3% lead and 13.2% zinc.Run of mine ore is crushed in a jaw crusher and then ground in a closed cir

    Jan 1, 1993

  • CIM
    Coal Preparation Progress in Western Canada

    Up to thirty years ago, coal preparation in western Canada, except at four plants, had not included actual coal washing. The exceptions were at Nanaimo and Royston, B.C., where tub washers and wet tab

    Jan 1, 1952

  • CIM
    Data reconciliation in hydrometallurgy: applications to leaching of clay and copper solvent extraction

    By K. El-Ouassiti, M. Zouadi, C. Bazin, D. Hodouin

    Data reconciliation techniques are used to attenuate the effect of measurement errors and estimate unmeasured variables. This paper illustrates the application of data reconciliation to hydrometallurg

    Jan 1, 2005

  • CIM
    Industrial natural gas technologies for the mining and metallurgy industry

    By A. Zaidi

    "The mining and metallurgy industry is highly energy intensive and one of the largest energy users in Canada. Energy costs are also a major component of total production costs in this industry as desc

    Jan 1, 1993