Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Developing Greater Synergy Among Geologists, Mineral Processors and Mining Engineers/Operators

    By Marcel Vallée

    Frequently, costs overruns and defaults in mining project performance result in serious problems and headaches for all project participants and impact on corporate objectives, profits and image and, o

    May 1, 2002

  • CIM
    Lake St. Joseph - Iron Ore Prospect to Superconcentrate Project

    By F. R. Jones, B. W. Taylor, A. R. MacPherson, L. J. Lamb

    "The Lake St. Joseph Iron Deposit is in Northwestern Ontario. Exploration to date by Steep Rock Iron Mines Limited has indicated an ore reserve of 683 million long tons. Metallurgical investigations h

    Jan 1, 1972

  • CIM
    Stemming Zone Fragmentation Analysis of Optimized Blasting with Top-Column Air Decks

    By W. Banda

    "Trial application of air decks on a production shot improved fragmentation (32% reduction in x50). Empirical fragmentation models and digital image processing software were used to estimate fragment

    Jan 1, 2018

  • CIM
    Gold-copper ores processing / flotation process optimization by the development of an on-line expert system

    By Yves Breau, François Robichaud, Jacques McMullen, Pierre Pelletie

    "The Expert System implemented at the East-Malartic mill controls a copper flotation circuit while taking into account the profitability of the operation. Treating a copper gold ore, the flow sheet in

    Jan 1, 2002

  • CIM
    Financing From the Perspective of Mining Companies

    By Eric Low

    Raising capital by issuing debt or equity is necessary in almost every corporation. In the field of corporate finance, the raising of capital is a heavily-studied topic. However, some of what is studi

    May 1, 2011

  • CIM
    The Challenges and Ramp op of Filtered Tails in a Modern Production Plant – Éléonore Project Experience

    By Andy Fortin, Jeet Basi, Simon Hille

    Goldcorp’s Eleonore mine is situated in Ell Lake area in the northeastern part of the Opinaca reservoir in the James Bay region of Quebec. The design of the 7000 t/d process plant includes crushing,

    Jan 1, 2016

  • CIM
    Westar Mining Ltd.-an overview of operations in southeast British Columbia

    By L. B. Hale

    "Introduction This paper will discuss the current operations of Westar Mining Ltd. and give a brief history of the company and of the Crowsnest Pass area. Westar is an integrated company involved in m

    Jan 1, 1985

  • CIM
    The Amaranth Gypsum Deposit

    By G. M. Brownell

    Introduction Within the past year a new deposit of gypsum has been opened up and brought into production in the Province of Manitoba. Until 1930, Manitoba's entire production came from Gypsumvil

    Jan 1, 1931

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • CIM
    Adsorption of Guar Gum on Potash Slimes

    Adsorption of guar gum was investigated on model minerals typically found in water-insoluble slimes of potash ores. The ionic strength of the adsorption mixtures was varied from distilled water to sat

    Jan 1, 2006

  • CIM
    Comparative Study on Flotation Performance of Stockpiled and Fresh Ore Samples

    By C. Pelley, S. Kelebek, T. Katsabanis, B. Nanthakumar

    "As part of a larger investigation on generation of fines from mining activities and their effect on downstream operations, ore samples from Onaping area stockpiles of Falconbridge Ltd were studied. B

    Jan 1, 2006

  • CIM
    Status of Repairs on Two Grinding Mills At Holt-McDermott

    By Pierre Beaudoin

    "This paper deals with the repairs made on two damaged mills. It investigates briefly the causes of the damage, explain its nature and the design of the repair. It explains the detrimental effect on o

    Jan 1, 2001

  • CIM
    Murrin Murrin CCD1 Rake Mechanism Modification the Decision and the Result (3e495dbc-2cca-4184-88b3-9cc5914b2481)

    By Brad Hewitt, Jeff Belke

    "Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and op

    Jan 1, 2005

  • CIM
    Sodium and Magnesium Salts of Western Canada

    By L. Heber Cole

    The search for potash in western Canada during the years of the great war led to the staking of claims on many of the "alkali lakes" and sloughs which occur in numerous localities in the morainic area

    Jan 1, 1924

  • CIM
    Environmental and Financial Savings for Belt Conveyors by Using Paramid as Reinforcing Material.

    By Heidi Beers

    Teijin Limited ? Global technology-driven group operating in six main fields Advanced fibers and composites business group Healthcare business group Trading and retail business group IT business

    Aug 1, 2013

  • CIM
    Assessing the Value of Ventilation on Demand CIM Conference

    By Glenn Lyle

    CEMI Introduction ? Introduction of the CAF VOD Project ? Who are our partners ? What were the Outcomes What is next

    May 1, 2011

  • CIM
    On-Stream Analysis (OSA) of Industrial Slurries for Process Control and Optimization Using Laser-Induced Breakdown Spectroscopy (LIBS)

    By Guy Chevalier, Jean-Guy Chartrand, Louis Barrette, Daniel Michaud, Michel Fortin

    "COREM has developed, specifically for the mineral industry, a mobile laboratory using the Laser-Induced Breakdown Spectroscopy (LIBS) technique. It has been used to perform onstream analysis (OSA) of

    Jan 1, 2004

  • CIM
    Barrick Goldstrike Grinding Expert System

    By Steve Custer, Tim Kahl, Sue Parker

    "The primary objective of the Barrick Goldstrike expert system is to achieve the desired liberation size for the autoclave circuit while maximizing throughput. In addition, when downstream limitations

    Jan 1, 2001

  • CIM
    The Accident Prevention Program at Consolidated Discovery Yellowknife Mines Limited

    By Ralf M. Kleine

    THE property of Consolidated 1 Discovery Yellowknife Mines Limited, (Figure I) is situated in the Northwest Territories, approximately 50 air miles north of the town of Yellowknife. The mine is reache

    Jan 1, 1962

  • CIM
    Electrical Drives for Large Grinding Mills

    By A. G. Spencer

    "The horsepower required to drive large grinding mills has increased dramatically during the past ten years. Limitations on the amount of power which may be transmitted by a single gear and pinion hav

    Jan 1, 1972