Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Sherritt-Cominco Copper Process ? PART II: Pilot-Plant Operation

    By P. Kawulka

    An integrated pilot plant for the development of the S-C Copper Process was constructed at Fort Saskatchewan in 1975 and operated in 1976. The pilot plant was designed to treat 9 tonnes per day of a p

    Jan 1, 1978

  • CIM
    Slim-Hole Drilling and 2 1/2.-lnch Casing, Tubingless Completions

    By John H. Nicholls

    In this paper, Imperial Oil Limited reports briefly on the drilling by contract rigs of twenty-nine slim holes in the Virden, Smiley, and Souris Valley areas. The investigations showed that slim-hole

    Jan 1, 1958

  • CIM
    Carbothermal Upgrading of the Awaso Bauxite Ore using Waste Polypropylene as Reducing Agent

    By F. Awotwe-Appiah, P. Koshy, A. Y. Fosu, J. Dankwah, J. R. Dankwah

    Ghana currently exports its bauxite raw without any value addition. Gradual depletion of high grade bauxite (with high alumina content) and the emergence of low grade bauxite (with high iron oxide con

    Jan 1, 2015

  • CIM
    Structural and Electronic Properties of Smithsonite and Cerussite: A DFT Simulation

    By Y. Q. Li, X. H. Long

    In this work, structural and electronic properties of smithsonite (ZnCO3) and cerussite (PbCO3) as the typical lead-zinc oxide minerals is simulated by means of DFT. The calculated results could be co

    Jan 1, 2015

  • CIM
    Prospection Alluvionnaire (Minéraux Lourds)en Gaspésie- Traitement des Donnés et Comparaison Avecles Résultats Géochimiques en Sédiments de Ruisseau

    By Robert L. Tremblay

    Dans le but de voir si une région comme la Gaspésie, qui a subi la derniere glaciation , se prête avantageusement à la méthode de prospection alluvionnaire, environ 800 concentrés de minéraux lourds f

    Jan 1, 1978

  • CIM
    A Pilot-Scale Examination of a High Pressure Grinding Roll / Stirred Mill Comminution Circuit

    By J. A. Drozdiak

    In this paper we examine, through pilot-scale testing, the possibility of operating a circuit comprised of two stages of HPGR comminution, followed by grinding through a horizontal stirred mill. In or

    Jan 1, 2012

  • CIM
    Computer predictions of coal cleaning performance

    By Brian L. Beninger

    This paper discusses the application of the computer to coal preparation process predictions. In broad terms, the computer is used to perform two main functions. Firstly, the given float-sink analysis

    Jan 1, 1979

  • CIM
    Ventilation and refrigeration practices together with environmental thermal problems at the Mindola Mine, Zambia

    By Mehmet Guney

    This article is based on a detailed heat investigation conducted at the Rokana Division of Nchanga Consolidated Copper Mines Limited while both authors were employed in Zambia. Mindola Mine is one of

    Jan 1, 1979

  • CIM
    Boliden Westmin Limited - Gibraltar Mine

    By Harry Siewert, Tom Milner, Jack Stickney

    "LocationThe Gibraltar mine is located in central British Columbia (NTS 93B/9W), 362 km north of Vancouver. Access is provided by 20 km of paved road from McLeese Lake, which lies 45 km north of Willi

    Jan 1, 2000

  • CIM
    Production of Copper Sulphate from Mine-Water Precipitate

    By A. G. Lylie

    Introduction At the Britannia Mining and Smelting Company's mill, the equivalent of 2,500 to 2,800 pounds of copper sulphate crystals per day is made from copper which is precipitated from the m

    Jan 1, 1951

  • CIM
    Evolution of Dispersoids and Elevated-Temperature Properties during Two-Step Heat Treatments in Al-Mn-Mg 3004 Alloys

    By K. Liu

    "In the present work, two-step heat treatments with preheating treatments at different temperatures (175, 250 and 330°C) as the first step followed by the peak precipitation treatment (375°C/48h) as t

    Jan 1, 2017

  • CIM
    Description of pillar behaviour at Heath Steele Mines

    By Donald E. Archibald, Gerald A. Allcott

    "Noranda's Heath Steele Mine is located 35 miles north of Newcastle in northern New Brunswick. Blasthole open stoping with partial delayed filling is the major mining method in use. The selection

    Jan 1, 1981

  • CIM
    La Rentabilité

    1 INFORMATIONS GÉOLOGIQUES ET PLANIFICATION MINIÈRE La notion de gisement exploitable s'appuie sur les connaissances de géologie, d'ingénierie et tablir la rentabilité en fonction des inves

    May 1, 2002

  • CIM
    The Holy Grail - Predicting Localized Corrosion Damage from First Principles

    By D. D. Macdonald, G. Engelhardt

    The accumulation of damage due to localized corrosion [pitting, stress corrosion cracking (SCC), corrosion fatigue (CF), crevice corrosion (CC), and erosion-corrosion (EC)] in complex industrial syste

    Jan 1, 2005

  • CIM
    Coal Gasification - The "New" Energy Source

    By J H. Dressel, J. E. Williams

    This paper presents a brief review of what coal gasification is, procedures that are available today and processes that may be available in the future. Examples are given as to how the process might b

    Jan 1, 1973

  • CIM
    Pilot Testing Of A Process Developed For Treatment Of Nicontaining Copper Concentrate After High-Grade Matte Separation Resulting In Blister Copper Production In Twozone Vaniukov Furnace

    By L. B. Tsymbulov, L. Sh. Tsemekhman, A. N. Golov

    Gipronickel Institute, JS is developing a process of continuous converting of Nicontaining copper matte and concentrates resulting in the production of blister copper and fluid NiO-containing slag in

    Jan 1, 2007

  • CIM
    Underground Crusher Dust Control at Lake Shore Mine

    By O. E. Andrew

    THE object of this paper is to present a brief summary of the dust control system in use on the 3,825-foot level at the jaw crusher station, Lake Shore mine. During the years 1936 and 1937, dust surv

    Jan 1, 1941

  • CIM
    Towards a Robotic Refurbishment Process of Industrial Buildings

    By K. Iturralde

    The topic of this article is the automation and robotization in refurbishment processes of industrial buildings. The need to mold these production spaces is quite universal. Particularly in the region

    Aug 1, 2013

  • CIM
    Improving Construction Environmental Metrics Through Integration of Discrete Event Simulation and Life Cycle Analysis

    By H. Golzarpoor

    Life Cycle Analysis (LCA) is a methodology for evaluating the environmental impacts associated with a product during its life cycle. LCA is identified as the most reliable method for verifying environ

    Aug 1, 2013

  • CIM
    Sustainability-driven R&D in Zinc Hydrometallurgy: Remembering Lucy Rosato

    By George P. Demopoulos

    For more than 20 years the author had the privilege of working closely on a number of R&D projects with Lucy Rosato and her team at CEZinc. Several of these projects were driven from the sustainabilit

    Jan 1, 2015