Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Distillation of Calcium and Magnesium

    By I. I. Betcherman

    INTRODUCTION A DISTILLATION process offers one of the most effective methods of refining metals. Its use is particularly attractive in the case of reactive metals which are not readily treated by pyr

    Jan 1, 1951

  • CIM
    Synthesis of Scorodite Coated in-Situ with Hydrated Ferric Oxide and its Leaching Stability

    By Pingchao Ke, Zhihong Liu

    "To overcome the problem that scoroditeis not stable in neutral and alkaline solutions, we proposed and investigated a synthesis method of scorodite coated in-situ with hydrated ferric oxide in the Fe

    Jan 1, 2017

  • CIM
    New Locked Charge Protection System Prevents Damage to 14mw Geared Mill (e36f627b-5857-4b5e-9b18-31db39c538e3)

    The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres

    Jan 1, 2012

  • CIM
    L'Exploitation de Fire Lake et Lac-Jeannine

    By Gaston Gendreau, Marcel Allard

    "Sidbec-Normines Inc. est une société formée de trios partenaires soient: Sidbec, British Steel Corporation et la Compagnie Minière Quebec Cartier. L'objectif de l'opération minière est d&ap

    Jan 1, 1982

  • CIM
    Gravity Recovery of Gold-Bearing Sulphides in a Milling Circuit

    "In many gold deposits, a reasonable amount of the gold that remains in the cyanide leach tailing is associated with pyrite. Some gold plants have found it economical to incorporate gravity circuits o

    Jan 1, 2017

  • CIM
    Predicting Thermal Conductivities of Rare-Earth Pyrochlores from First-Principles

    By Guoqiang Lan, Jun Song, Bin Ouyang

    Rare-earth pyrochlores, commonly exhibiting anomalously low lattice thermal conductivities, are considered as promising topcoat materials for thermal barrier coatings. However the structural origin un

    Jan 1, 2015

  • CIM
    Development of Innovative Recycling Technologies for Sustainable Metallurgical Industry

    By M. A. Halim, V. I. Lakshmanan

    Recycling is one of the key elements for sustainable process development for the recovery of value-added products and reducing environmental impact. Process Research ORTECH Inc. has developed several

    Jan 1, 2015

  • CIM
    Optimising Chemical Cost in Fine Coal Flotation at Bhelatand Coal Preparation Plant

    By Atul Bhatnagar, M. P. Sinha, Md Zahid Ahmad, Pallav Garg, Sanjay Kumar Singh, Shashi Ranjan, An Ecolab Company Nalco Water

    "Froth Flotation is undoubtedly one of the most critical processes in coking coal washing plants. This work was carried out at Bhelatand Coal Preparation Plant of Tata Steel was with an objective of c

    Jan 1, 2016

  • CIM
    Economic and Operational Assessment of a Non-Conventional HPGR Circuit

    By J. A. Drozdiak, W. Tse, P. P. Rosario

    "In a recent publication (SAG 2015), we presented a non-conventional high pressure grinding roll (HPGR)-ball mill circuit as a lower capital cost alternative to the “standard” HPGR circuit. The circui

    Jan 1, 2016

  • CIM
    Present Milling Practice at the Kambalda Nickel Operations of Western Mining Corporation Limited

    By C. M. Kleemann

    The paper describes the present milling practice at Western Mining Corporation Limited's new nickel mine at Kambalda in Western Australia. It details the crushing, autogenous grinding, flotation and s

    Jan 1, 1973

  • CIM
    Mako Single Stage Sag Mill Comminution Circuit Design, Commissioning and Ramp-Up

    By P. Scinto, P. Hudson

    "Modern day ore bodies are becoming increasingly harder, more abrasive and lower grade. The Mako deposit is located in Senegal and consists predominantly of primary mafic and felsic lithology that are

    Jan 1, 2019

  • CIM
    Effects of Ti-Ta Alloy Additions on Ti-46Al Castings

    By J. Zollinger, J. R. Kennedy, J. H. Park, D. Daloz

    "In order to improve the properties of cast Ti-Al alloys to replace Ni-based superalloys past the low pressure stages of aircraft engines investigations into inoculation for grain refinement were carr

    Jan 1, 2017

  • CIM
    Shear behaviour of cable bolt supports in horizontal bedded deposits

    By Richard P. Curtin, John M. Goris, Lewis A. Martin

    Cable bolt supports are being recognized as an effective ground control system in under-ground coal mines in North America, and their use has increased considerably during the past few years. The U.S.

    Jan 1, 1996

  • CIM
    Enhancing CIL Gold Extraction by Hard Paraffin Wax Blanking of Double Refractory Ore Pre- or Post-Pressure Oxidation (POX)

    By G. Van Weert, O. Wang

    "As part of a general review of processing double refractory ores through Barrick Gold’s autoclaves / CIL facility at Goldstrike, blanking the preg robbing native carbon in the process solids with har

    Jan 1, 2012

  • CIM
    Loading Gypsum at Hantsport, N. S.; Canadian Gypsum Company's New Installation in the Bay of Fundy loads 11,600-ton Ship with Crushed Ore in Two Hours at High Tide

    By S. A. Willis

    For over 150 years gypsum from Nova Scotia has been shipped via water to the United States east coast. The history of the movement has been one of continual improvements in quarrying, loading, and shi

    Jan 1, 1948

  • CIM
    Cyanidation Studies at the S.A. Lands Gold Mine

    By C. E. Smith, R. J. Inglis, M. I. Brittan, J. H. Schoeman

    "AbstractA number of plant-scale cyanidation tests were carried out in an attempt to uncover the causes of fluctuations in gold recovery efficiency. Computer analysis of the results verified that the

    Jan 1, 1977

  • CIM
    A Report on Improvements in Drilling and Blasting Practices at IOC?s Carol Lake Project

    By M. H. Pelley

    To increase drill fleet capacity and meet increased ore demands at its Carol Lake Project, the Iron Ore Company of Canada initiated a program in 1975 to convert the Gardner-Denver 120 and Bucyrus-Erie

    Jan 1, 1978

  • CIM
    The Ecstall Story: The Underground Mine .

    By John Ramsay, Frederick A. Edwards, J. Eric Belford, Clarence V. Amyotte

    "DEVELOPMENT of the underground mine is carried out from a main ramp driven from surface to the 800 and 1200 levels and from a shaft sunk to 3050 ft. Sub-levels at approximately 100-ft vertical interv

    Jan 1, 1974

  • CIM
    The Performances of XCF/KYF/GF Combined Flotation Machines in Bauxite Flotation Circuit

    By S. X. Shi, M. Tan, Y. Q. Li, D. F. Han, Z. B. Han

    Bauxite resources in China are mainly diaspore ore with the characteristics of low ratio silicon to aluminum. In order to obtain high quality of alumina product, flotation process is generally used to

    Jan 1, 2015

  • CIM
    Environments of Gold Mineralization in the Campbell Red Lake and Dickenson Mines, Red Lake District, Ontario

    By C. Jay Hodgson, P. J. MacGeehan

    "The gold ore zones of the Campbell and Dickenson mines occur within a km-wide, 2 km-long zone of highly altered and anomalously fissile and deformed volcanic and subvolcanic intrusive rocks, cut by a

    Jan 1, 1982