Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Application at Ok Tedi Mining of a Neural Network Model within the Expert System for SAG Mill ControlBy Murray Wood, Michael Schaffer, Makat Katom
"An expert system applied to the control of mineral process unit operations is, by its nature, the site best operating practice, having been designed by the local experts in conjunction with consultin
Jan 1, 2003
-
Comparisons of the Geology and Proposed Underground Mining Methods of the Panda and Koala Kimberlites at the EKATI Diamond MineBy Peter A. Oshust
The EKATI Diamond Mine has successfully completed the development and commissioning of the Panda Underground Project to extract the ore below the Panda open pit. The dominant kimberlite domain of the
May 1, 2006
-
Development of a Magnetically-Levitated Skip to Hoist OreBy Ryan W. Ulansky
This paper presents the conceptual design of a magnetically-levitated skip for use in an underground mine. A skip is used to move rock from an underground mine to its surface processing facility. Conv
May 1, 2002
-
Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S ConverterBy Hongfei Li, JianLong Wang
This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for
Jan 1, 2019
-
Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)By Dayang Datu Khalil, Charle Amoah, Fred Kock
Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe
Jan 1, 2012
-
Tectonic Framework of Palaeozoic Formations in ManitobaBy H. R. McCabe
"The study of a detailed series of structure and isopach maps of the Palaeozoic strata of southwestern Manitoba indicates that the principal Palaeozoic tectonic elements -the Williston Basin and Elk P
Jan 1, 1967
-
Sublevel Caving and Draw Control Procedures at GranducBy J. A. Cox, R. S. Mattson
"One of the main problems encountered in employing sublevel caving is the inherent high dilution factor. The operating results at Granduc illustrate that this dilution can be closely controlled and sa
Jan 1, 1973
-
The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral ProcessingBy H. D. Stolovitch, M. L. Lavallée
"An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli
Jan 1, 1992
-
The Importance of Efficient Mass Flow Balance in Crushing and Screening PlantsBy Fernando Romero Lage
The purpose of this paper is to analyze detailed crushing and screening configurations and the interrelationship as they relate to mass flow balance, operating efficiency, plant availability and final
May 1, 2010
-
Melt Extraction of Gold Fibers and Precious Metal Doped Fibers and Preparation of Porous Gold Fiber StructuresBy Olaf Andersen
Crucible melt extraction yields short metal fibers with eqivalent diameters as low as 50 µm from almost arbitrary metals and alloys. Highly porous components can be made from such fibers by suitable d
Oct 1, 2003
-
Improved flow-through share rulesBy Robert B. Parsons
"Canada's mining industry has reason to celebrate the federal government's budget which was tabled on February 26, 1986. The budget contains an important proposal to improve the flowthrough
Jan 1, 1986
-
Pilot Evaluation of an Engineering Control to Reduce Airborne Exposure to Particulates inside Drilling CabsBy K. Morin, C. -Y. Hon, G. Lachapelle
"Air-sampling results suggest drill operators working inside environmental drilling cabs at an open-pit gold mine in Nunavut, Canada, are at risk of exposure to asbestos and silica (quartz). The autho
Jan 1, 2017
-
Environmental consequences of the placement of radium-barium sludge in tailings areasBy K. L. Murphy, G. Multamaki, P. M. Huck
"A preliminary evaluation, based on existing data, has been made of the implications of placing radium-barium sludge in tailings areas. The study was restricted to a consideration of possible increase
Jan 1, 1982
-
Fracture Mechanics Numerical Modeling ? Potential and Examples of Applications in Rock EngineeringBy T. Backers
In fracture mechanics modeling the rock mass is seen as the combination of rock material and fractures, which are evident on different scales. The activation and propagation of fractures dominates the
May 1, 2009
-
Update of Span Design Curve for Weak Rock MassesBy Andrea M. Ouchi
A major focus of ground control research presently being conducted by the Geomechanics Group in the University of British Columbia Mining Engineering Department is to incorporate weak rock masses (RMR
May 1, 2004
-
Stress Measurements at Great Depth at Craig-Onaping Mines, Sudbury CanadaReliable estimation of in situ stress is a major step in the analysis and design of underground excavations in rock, particularly for evaluating the stability of underground structures to prevent fail
May 1, 2009
-
Mining at Giant YellowknifeBy D. C. McDonald
"IntroductionTHE GIANT YELLOWKNIFE property is on the west side of Yellowknife bay, Great Slave lake, N.W.T., some 600 air miles north of Edmonton. This paper deals with the underground development an
Jan 1, 1953
-
Arsenic Hydrometallurgy; Fundamentals, Technology and ApplicationsBy K. D. Mills, R. G. Robins, C. G. Anderson, L. G. Twidwell
Arsenic is a metalloid which has attracted great environmental scrutiny in recent decades. Moreover, its control and deportment is becoming increasingly important in the metallurgical processing of mo
Jan 1, 2014
-
Environmental Relevance of the Leachate Potential for Dry Storage of Delayed CokeBy Joseph L. Fournier
Suncor Oil Sands employs delayed coking technology in converting bitumen into synthetic crude oil. Currently up to 10,000 m3 of delayed coke (coke) is produced per day as a byproduct of the upgrading
May 1, 2011
-
Geostatistical Determination of Production Uncertainty: Application to Pogo Gold ProjectBy J. A. McLennan
Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo
May 1, 2004