    Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant

    By B. Krysa, J. Qiu

    The zinc pressure leach plant at HBM&S's operations is now in its fifteenth year of operation. Current pressure leach operation is steady at a concentrate processing rate of around 26.5 tonnes pe

    Jan 1, 2008

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008

  • CIM
    The Mechanics of Operation of Column Flotation Machines

    By R. L. Amelunxen

    "In January 1983, Gibraltar Mines Ltd. started an exploratory program on Column Flotation with hopes of improving performance of the Molybdenum Cleaning circuit. The encouraging results led to a colum

    Jan 1, 1985

  • CIM
    Distribution of Gold in Hypogene Ore at the Ernest Henry Iron Oxide Copper-Gold Deposit, Cloncurry District, NW Queensland

    By P. J. Williams, A. R. Foster

    Petrographic studies, assay records, and laser ablation-inductively coupled plasma-mass spectrometer (LA-ICP-MS) analyses of major sulfides suggest nearly all of the gold at the Ernest Henry Cu-Au dep

    Jan 1, 2007

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • CIM
    Accounting for Dilution in Ore Resource Estimation

    By Mario E. Rossi

    The full economic evaluation of a mining project requires a block model that provides an estimate of the tons and grades of available resources. The model must be representative of the mineralization

    May 1, 2009

  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part I Surface and Plant Operations

    By Euler De Souza

    The authors conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview potential hazards associated with backfill practice

    May 1, 2009

  • CIM
    The Operating Range Method for Backfill Hydraulics

    By D. J. Hallbom

    This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l

    May 1, 2007

  • CIM
    The Red Dog VIP Mill Optimization Project A Study in Fast-Track Project Execution and Alliance Contracting (5aae1f12-06e2-4656-a27b-a608072456ab)

    By George H. Hope, Steve Ciccone

    "The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes pe

    Jan 1, 2003

  • CIM
    Jaguar?s Caeté Gold Project in Brazil

    By Ivan C. Machado

    Jaguar Mining Inc. is implementing a 1.1 Mtpy, 7-year LOM gold project in the Iron Quadrangle (?Quadrilátero Ferrífero?), Brazil. Construction is on schedule and startup is programmed for Q2 2010. Mil

    May 1, 2010

  • CIM
    Improved Cleaner Circuit Performance at the Degrussa Copper Mine with an In Situ Column Sparging System

    By E. Wasmund

    "Sandfire’s DeGrussa Copper-Gold operation in West Australia is a new high grade copper sulfide mine, which includes a 1.5 Mtpa concentrator which was completed in 2013.Early after commissioning, it w

    Jan 1, 2016

  • CIM
    Influence of Rock Mass Anisotropy on Tunnel Stability

    Stress induced, gravity-assisted failure processes typically dominate long before stress levels approach the strength of the intact rock (at approximately smax > 0.4UCS where smax = 3s1 ? s3 and UCS i

    May 1, 2009

  • CIM
    Transforming Flow Sheet Design with Inert Grinding – the IsaMill

    By K. E. Barnes

    "The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin

    Jan 1, 2006

  • CIM
    A Method to Assess Size Reduction by Grinding

    By Daniel Hodouin, Claude Bazin

    "A graphical method to assess the size reduction by grinding is presented and illustrated with data collected from laboratory grinding tests and industrial grinding circuits. The method lies between t

    Jan 1, 2004

  • CIM
    Environmental planning in mine waste management — The Huckleberry Mines experience (CIM BULLETIN)

    By H. F. Letient, D. C. Johnson

    At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to

    Jan 1, 2004

  • CIM
    Ultrasound Use in Copper-Nickel Sulphide Flotation

    By Yum Xiaoquan, Turgut Yalcin

    "A laboratory study was carried out to determine the potential role and effect of ultrasonic irradiation in the flotation of a Sudbury copper-nickel sulphide ore. The use of ultrasound was tested sepa

    Jan 1, 2005

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • CIM
    Westwood Project Acceleration

    Westwood Quebec Long Life, Low Cost CONSTRUCTION UPDATE ? Shaft advanced to 840m (after 1 year), 3 km of down ramp and 2 km of exploration drift ? Head frame and hoist room structure completed ?

    May 1, 2010

  • CIM
    Flotation Performance Improvement at Placer Dome Kanowna Belle Gold Mine

    By S. Schwartz, T. Bilney

    "Over recent years a number of techniques have been developed as part of the AMIRA1 P9 project to represent mathematically or measure directly sub-processes occurring in flotation cells. These include

    Jan 1, 2005