Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Full-Scale Testing of the PCF Rock Excavation Method

    A small-charge rock excavation method based upon the Penetrating Cone Fracture (PCF) technique has been demonstrated to be capable of excavating the hardest of rocks. The PCF technique involves drilli

    Jan 1, 1993

  • AUSIMM
    Vibration Control in Construction Blasting

    A resume covering currently accepted views on blasting vibration measurement, human response, and criteria for damage is presented as background information for readers who are not conversant with

    Jan 1, 1976

  • AUSIMM
    Effect of oxygen on the interfacial phenomena and metal recovery rate in recycling process

    By Y-B Kang, J H. Park, J Park

    In order to understand the effect of oxygen injection into the molten metal on the valuable metals (VM) recovery and interfacial phenomena, several high-temperature experiments were conducted using a

    Aug 21, 2024

  • AUSIMM
    Mining Through Underground Workings in Fimiston Open Pit Kalgoorlie Consolidated Gold Mines (KCGM)

    By T Jones, K Karunaratna

    The Kalgoorlie Consolidated Gold Mines (KCGM) Fimiston Open Pit is located on the eastern boundary of the Kalgoorlie-Boulder City and is mining an area traditionally known as the Golden Mile. The pit

    Jan 1, 2003

  • AUSIMM
    Theoretical and experimental approaches to determine the mass transfer coefficient in the steel/slag/refractory system

    By S K. Michelic, M Schickbichler, A Kharicha, E Karimi-Sibaki

    The requirements for the controllability of metallurgical processes are increasingly becoming the focus of both industry and research. Advances in this field of research not only impact the stability

    Aug 21, 2024

  • AUSIMM
    Why do Shareholders and Mining Executives Allow Mine Managers to Leave Behind High-Grade Broken Ore Underground?

    By K Biegaj

    The paper describes challenges the author has encountered on Australian underground gold and nickel mines over the last eight years, when recovering high-grade gold/nickel bearing mine floor material

    Mar 26, 2012

  • AUSIMM
    Mining at Depth - the Major Issues

    By Lloyd F, Arnold D. A, Hagan T. O

    This paper investigates the problems that are encountered in mining at extreme depths. It looks into the rock mechanic aspects, especially the high stress levels that will occur, and the hazard of

    Jan 1, 1986

  • AUSIMM
    Filtration Efficiency, Secondary Emissions and Reliability of Particle Filter Systems in Underground Workplaces

    By J Czerwinski, M Kasper, M Wyser, N Heeb

    The VERT project 1993 - 1998 laid the technical foundation for curtailing the emission of fine particles from diesel engines at Swiss underground workplaces. The targeted maximum was 100 ¦g/m3 EC. Ext

    Jan 1, 2005

  • AUSIMM
    Design of a Steel Fibre Reinforced Concrete Segmental Tunnel Lining - City West Cable Tunnel Project, Sydney, Australia

    By A Kuras

    Segmental tunnel linings are becoming more common in Australia. One current project employing a segmental lining is the City West Cable Tunnel (CWCT) in Sydney. The project has been commissioned by En

    Jan 1, 2008

  • AUSIMM
    Iron Ore Bedding & Blending at the Newcastle Steelworks

    Expansion of the B.H.P. Co. Ltd. mater ials handling facilities, at their Newcastle Steelworks, began in 1964 and continued until 1970. The present complex handles the annual iron ore requirement o

    Jan 1, 1972

  • AUSIMM
    Magnetic Separation Basic Principles and Their Practical Application

    Magnetic Separators have a wide application in dry separation processes, frequently in conjunction with High Tension Separation. Dry processes can frequently be superior to established processes in mo

    Jan 1, 1958

  • AUSIMM
    Application of Synthetic Rainfall Data to Long-term Modelling of a Rehabilitated Landform

    By G R. Hancock, D Verdon-Kidd, M J. Saynor, J B. C Lowry, T J. Coulthard

    The ability to simulate the stability of post-mining landscapes over time scales ranging from decades to millennia is a critical element in the assessment of closure designs for uranium mines. Landsca

    Jun 28, 2016

  • AUSIMM
    The Application of GyÆs Formula and Sampling Best Practice at the Snap Lake Phase I Diamond Bulk Sampling Plant

    The Snap Lake Phase I project initiated a subsampling campaign on the material (kimberlite/metavolcanic/granite) mined and treated for diamonds. The campaign was aimed at determining the optimum subsa

    Jan 1, 2005

  • AUSIMM
    Estimation of bubble size distribution and local turbulence in a bubbly flow system

    By P Ireland, S Mitra, G Evans, A Wang, M M. Hoque

    This work presents an experimental study of flow dynamics in a bubble column system (crosssection: 100 mm × 100 mm) using a non-intrusive optical technique with targeted application in a novel REFLUX™

    Aug 24, 2022

  • AUSIMM
    EastLink Tunnel - Permanent Concrete Lining and Waterproofing Design

    By E Taylor, F Lebbing

    The $2.5 billion EastLink project is a 39 km tollway and includes twin three-lane, 1.5 km long, undrained driven tunnels with cross passages every 120 m. The hard rock tunnels are being built to avoid

    Jan 1, 2008

  • AUSIMM
    Designing the Optimal Flotation Circuit - The Prominent Hill Case

    By P J. Colbert, P D. Munro

    OZ Minerals' Prominent Hill copper-gold concentrator in South Australia was built in 2008 with commercial production commencing in early 2009. In addition to recovery of valuable minerals, the fl

    Jan 1, 2009

  • AUSIMM
    Production Enhancement Through Simulation and Visualisation

    By R Loweth

    The application of discreet event simulation has matured in modelling manufacturing systems for production analysis. This simulation tool was used in studying a number of mining operations, especially

    Jan 1, 2003

  • AUSIMM
    Characteristics of Fluid Coexisting with Granitoids Associated with Miocene Iron-Copper-Lead-Zinc Mineralisation of the Chichibu Skarn Deposit, Japan

    By T Mizuta, H Satoh, M Ogasawara, M Miyata, M Fukuyama

    The Miocene Chichibu granitoids associated with the Chichibu skarn deposit are divided into North Body, South Body and Daikoku altered stock. Orebodies of the Chichibu skarn deposit are mainly distrib

    Jan 1, 2008

  • AUSIMM
    Simulating Intact Rock Behaviour Using Bonded Particle and Bonded Block Models

    By A Turichshev

    The synthetic rock mass (SRM) approach for modelling jointed and veined rock has been at the forefront of caving geomechanics research for years. A well-constructed and calibrated SRM model can captur

    May 9, 2016

  • AUSIMM
    Calibration of an Airblast Prediction Model

    By A J. Moore

    To control the airblast from blasting to regulatory limits at environmentally sensitive sites near the Collinsville Coal Mining Operations, it has been necessary for Thiess Mining to incorporate a wav

    Jan 1, 2004