Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Field Evalution of Explosives PerformanceBy Cameron A
In recent years there have been significant developments in the tech- nology available for blast monitoring, analysis and simulation. Progress in these areas has been achieved through research conduc
Jan 1, 1988
-
New Mines in the New Age ù The Two Risks of Environmental Impact AssessmentEIA is a test of a development proposalÆs legitimacy and asks two questions: not only æis the proposal competent?Æ but also ædoes the proposal have moral authority?Æ For reasons of miningÆs historic i
Jan 1, 2004
-
Trucking into the Next MillenniumFor the past 40 years, underground trucking using diesel powered or electric wheel driven vehicles, either conversions of surface trucks, or purpose built, has been the preferred means of ore and wast
Jan 1, 1998
-
Numerical Simulation of the Drainage in a Mining Stope Filled with Hydraulic BackfillBy S Servant
In the mine of this study, cemented hydraulic backfill is placed under the form of a slurry at a percentage of solid by weight varying from 50 to 65 per cent. This slurry settles and cures in the stop
Jan 1, 1998
-
Design of a Continuous Monorail Drilling System for Decline DevelopmentBy M Kuruppu, B Besa
Currently, conventional methods of decline development put enormous cost pressure on the profitability of mining operations. This is the case with narrow vein orebodies where current methods and mine
Jan 1, 2008
-
Integrated Planning, Mining and Rehabilitation for Effective Results and Sustainable Land Use - A Western United States PerspectiveBy V Pfannenstiel
The United States (US) coal mining industry has been working under comprehensive planning, operating and rehabilitation regulatory requirements for nearly 35 years. The public desire for environmental
Jul 10, 2012
-
Measurement? Assessment? The Real Challenge is CommunicationOne of the earliest and continuing challenges in driving sustainable development in large scale resource industry projects is around the issue of assessment û how do you measure the sustainability of
Jan 1, 2009
-
Lihir Gold Five Years On ù Maximising Throughput and Capital UtilisationDuring the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future
Jan 1, 2003
-
Mineralogical Characterisation of Iron Ores From Noamundi, India With Special Emphasis on Beneficiation of Iron Ore FinesBy V Kumar, A S. Venkatesh, R K. Upadhya
The enormous iron ore deposits of eastern India are part of the volcano-sedimentary basins containing iron and to some extent manganese deposits that belong to the Iron Ore Group (IOG) of Archaean Sin
Jan 1, 2005
-
Grouting Technology for Control of Ordovician Limestone WaterBy Yinxiang W, Chunlai Y
In older to improve efficiency of surface pre--grouting in sealing off water in heavily water-bearing strata, such as sandstone,siltstone and limestone, several methods have been used in China, they
Jan 1, 1988
-
A Stochastic Optimisation Formulation for the Transition from Open Pit to Underground Mining within the Context of a Mining ComplexBy J MacNeil, R Dimitrakopoulos
As open pit mining of a deposit deepens, the cost of extraction may increase up to a threshold where transitioning to mining through underground methods is more profitable. This paper provides an appr
Nov 24, 2014
-
A Note on Kitaev et al Fomulation of the Gas Flow with Tuyere Wind EntryBy Propster M, Choudhry M
THIS note gives comments on the paper by Kitaev et al on p. 68 of this book and compares results with those obtained by ourselves. We wish to say that the authors are to be congratulated on their s
Jan 1, 1975
-
Application of Simulation Models to Port Planning and ManagementBy Mahoney BK
The development of simulation models to reflect accurately the operations of a port and its associated transportation systems can be an expensive and time consuming process. However the complexity
Jan 1, 1983
-
Energy complexities in complex orebodiesBy M Ziemski
The provision and management of energy in both fuel and electricity forms is an increasingly important consideration for mines. Pressures from communities, governments and markets are increasing towar
Nov 21, 2018
-
Simulating Integrated Hydrology in Mining Catchments from Planning to ClosureBy S Szylkarski, D N. Graham
In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo
Jun 28, 2016
-
-
Learning from Simulation at Boddington Gold MineVarious methods and software have been trialled for simulation of Au grades at Boddington Mine. This covers in-house and public software as well as sequential and turning bands methods. The diversity
Sep 26, 2011
-
Differential Cut-Off GradesDetailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (
Jan 1, 2005
-
Shell-supported Grinding Mill for the Ernest Henry ProjectTumbling mills have been used in the minerals indusu) for occr WO years, with the design changing little, but the size of the individual pieces of equipment increasing significantly with the lowerin
Jan 1, 1997
-
Wall control blasting – the influence of engineering geology on blast designBy T N. Little
This paper is concerned with the influence of engineering geology on design of Wall Control Blasts. In the Introduction, the Blast Management Framework and the Blast Design Requirements classification
Jun 22, 2022