Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Decision of Stationarity in Modern Resource Estimation

    By B J. Wilde

    Evaluating the resources and reserves in a mineral deposit requires many interdependent subjective decisions. The decision of stationarity is arguably the most important. This decision includes: the

    Sep 26, 2011

  • AUSIMM
    Monitoring of M10000 IsaMill™ Process Performance by Passive Acoustic Emissions

    By A McEwan, J Masters, C A. Jackson, A Catanzano, V Sharp, M Millen, S Rainey, S J. Spencer, G Roberts

    A passive acoustic emission (AE) monitoring system has been developed and trialled on two M10000 IsaMillsTM. The analyser detects AE stress waves generated by grinding media impacts with the mill line

    Sep 1, 2014

  • AUSIMM
    Developments in Mineral Processing Technology

    By Greenhalgh L. P H

    The opportunities offered by an increasingly volatile world invite the international consultant or engineering services contractor to broaden attitudes, diversify interests, expand capabilities, retai

    Jan 1, 1993

  • AUSIMM
    The Effects of Sulphur Dioxide on the Energy Consumption and the Nature of Electrowon Copper

    By G T. Hefter, P Singh

    The effect of using SO2 as an anodic depolariser in the electrowinning of copper from aqueous acid sulphate solutions has been studied using cells without/with a ceramic diaphragm. In all cases SO2-sa

    Jan 1, 1999

  • AUSIMM
    The Failure of Steel Rock Drill Rods by Fatigue

    A sample of fifty fractured low chromium-molybdenum alloy drill steel rods was investigated. Each rod was of the forged collar integral tungsten carbide type in common use in Australia.Examination of

    Jan 1, 1955

  • AUSIMM
    Sampling Practice at the Vera Nancy Gold Mine

    The efficient and profit-maximising daily and long-term management of the Vera Nancy resource depends on decisions based upon assay data. This paper examines the range of sample sources, the methods o

    Jan 1, 2000

  • AUSIMM
    Transient slag behaviour in the Direct Reduced Iron (DRI) and scrapbased Electric Arc Furnace (EAF) process – case study for high and low-grade DRI input

    By S K. Panda, M A. Van Ende, S Chatterjee

    Tata Steel Netherlands (TSN) aims to reduce its CO2 emissions by 35–40 per cent by 2030 and become CO2 neutral by 2045. A first step to reach these targets is via the utilisation of an Electric Arc Fu

    Jun 19, 2024

  • AUSIMM
    Grade Control at a Multi-Source Operation - Mount Isa Lead Mine, Mount Isa

    By N Davies, M J. Coward, P L. Hissey

    Mount Isa Mines has four mining operations in Mt Isa with the X41 and Enterprise Mines producing copper and the Lead Mine and George Fisher producing lead zinc and silver. Each stream contributes ore

    Jan 1, 2002

  • AUSIMM
    Results from a Preliminary Investigation of Particulate Emission During the Sintering of Iron Ore

    By J Manuel, A Trudu

    Regulations on the emission of particulates from sinter plant stacks are becoming increasingly stringent and reducing these emissions by improving gas cleaning systems is a significant cost to the sin

    Jan 1, 2002

  • AUSIMM
    Sustainable Water Use in Minerals and Metal Production (d0f30340-98d8-41af-9a56-e3b26cd94fdc)

    By R R. Lovel

    In this paper, life cycle assessment methodology has been used to assess the variations in water use associated with different metal production and processing routes and provide insights into the valu

    Jan 1, 2006

  • AUSIMM
    Trading Water Access Entitlements in Queensland

    By A Stasi, B Brice

    Water is a limited and precious resource in Australia. Because of the increasing demand for water from all sectors of the economy and the variability in supply, efficient management of water resources

    Jan 1, 2006

  • AUSIMM
    Bioremediation Stabilisation of Sulphide Tailings and Rock Against Acid Mineral Water Development

    As mining and extraction processes improve and lower grade ores become economic, mining for most ores have extended to depths beneath the zone of weathering oxidation created over geological histor

    Jan 1, 1997

  • AUSIMM
    Status Quo and Future Evaluations of Global Rare Earth Mining (with Respect to Special Rare Earth Element-industry Criteria)

    By H Mischo, G Barakos, J Gutzmer

    The continuously growing demand for rare earth elements (REEs), in combination with the crisis of 2009 and the price spike of 2011, has initiated a treasure hunt for rare earth deposits all over the w

    Nov 4, 2015

  • AUSIMM
    Discovery, Geology and Metal Zoning of the Nickel Rim Depth Deposit, Sudbury, Canada

    The Nickel Rim Depth Cu-Ni-PGE deposit, discovered by Falconbridge Limited in 1993, illustrates several trends in exploration in the Sudbury area. Recent discoveries tend to be deep, high grade, foo

    Jan 1, 1996

  • AUSIMM
    The Status of Mine Water Pollution in South Africa

    This paper presents an overview of the current status of mine water management in South Africa. The regulatory framework within which mine water management operates is set out, based on the principles

    Jan 1, 2003

  • AUSIMM
    Pillar Recovery Adjacent to Stabilised Rock Fill at the Ballarat Gold Project

    By D P. Sainsbury, J Western, B L. Sainsbury, V Mutton, P E. Petrie

    Remnant rib pillars at Castlemaine Goldfields Ltd’s Ballarat Gold Project have been sterilised by the placement of loose rock fill in production stopes. The application of selectively injecting low-vi

    Nov 5, 2014

  • AUSIMM
    The irrefutable value of introducing a dynamic transport term into mill modelling

    By D K. Weatherley, A N. Mainza, I Govender, L M. Tavares, M S. Powell

    It is understood that rocks do not instantaneously transport along a grinding mill and are consequently not perfectly mixed, but this is conveniently overlooked in mill modelling. A lack of understand

    Aug 24, 2022

  • AUSIMM
    How Details of the Geometallurgical Optimisation Influence Overall Value

    By S Matos Camacho, K G. van den Boogaart, R Tolosana Delgado, U Mueller

    "The precise formulation of a geometallurgical optimisation problem is by necessity a simplification of reality. It includes implicit choices such as data availability or mining block geometry. Additi

    Jun 15, 2016

  • AUSIMM
    Milling at Mount Isa

    An account of milling "methods and costs at Mount Isa Mines Limited up to the year 1938 has been published. The present paper outlines the methods since adopted in the milling of lead-zinc ores a

    Jan 1, 1953

  • AUSIMM
    The Bougainville Copper Project

    The mining. operations of Bougainville Copper Pty Limited are located at Panguna on the Island of Bougainville which is part of the Territory of Papua and New Guinea. Mineralisation in the Panguna ar

    Jan 1, 1970