Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Reduction of Mechanical Entrainment by Polymer DepressantsBy Y Peng, D Wannas
In the fine particle flotation technologies being developed today the fine hydrophilic (gangue) particles are usually well dispersed. These highly dispersed fine particles can be recovered into the fl
Jan 1, 2005
-
Geological Controls on the Flow of Groundwater into Underground ExcavationsBy Culshaw MG, Deaves AP, Bell FG
The accurate prediction both of the water ingress into sub-surface excavations and the nearby groundwater pressures is of fundamental importance to the control of the stability and flooding of tunne
Jan 1, 1988
-
Innovative Aspects of Mining at Mount CharlotteBy Askew JE
The large, massive low grade gold orebody at Mount Charlotte has demanded an innovative approach to mining engineering. In the last five years several advances occurred in the areas of rock mechanics,
Jan 1, 1984
-
Support of Longwall Workings in Thick Seam ExtractionBy Smith PE
The main components of face design are the power loader, face conveyor and powered support system and the interaction of these components determines the effectiveness of strata control. A major in
Jan 1, 1986
-
Drill Monitoring Investigation in a Western Canadian Surface Coal MineBy Peck J. P, Kennedy D
Drill performance monitoring studies were recently completed at the Fording River mine, British Columbia. Microprocessor-based instrumen- tation and data analysis techniques were developed with the o
Jan 1, 1989
-
Blast Design Optimization to Minimize Induced Vibrations of StructuresBy Kavetsky A, Scott A
As well as breaking and moving rock, blast energy sets up a seismic wave in the ground which can cause significant damage to rock structures and buildings and disturbance to human occupants. This se
Jan 1, 1990
-
Experience with Stress Control Methods as a Planning Tool Elouera CollieryBy Quinn P, Huuskes W
Continued extraction of the No. 3 Seam at Elouera Colliery required the driveage of a sequence of roadways within an area of significantly elevated horizontal stress. Initial roof conditions varied fr
Jan 1, 1998
-
Study of Soil Media with Multiple Tunnels or Cavities Using the Boundary Element TechniqueBy Dif A. E N, Abdalla MH
The effect of multiple tunnels /cavities on the stress and deformation field of the soil media was investigated by using a two dimen- sional plane strain boundary element model. The soil was conside
Jan 1, 1987
-
Optimal Blast Scheduling of Sub-Level Stoping by Dynamic ProgrammingBy Bhattacherjee A, Makesh S
Mechanised sub-level stoping is one of the most widely accepted stoping practices followed in base metal mines in India. As a general practice, blast-scheduling of rings in these stopes is done eith
Jan 1, 1995
-
Predicting Machine Cutting and Cutter Wear Rates for Mining ApplicationsBy Trueman R
If continuous mining systems are to be successfully applied in metalliferous mines then reliable models will be needed to predict rock cutting machine advance and tool wear rates for effective machi
Jan 1, 1995
-
Operational Experiences and Performance Assessment of HPGR Technology at Argyle Diamond MineBy C Morley, B Costello
In 2002 the Argyle Diamond Mine upgraded the process plantÆs recrush circuit to include a High Pressure Grinding Roll (HPGR), or High Pressure Rolls Crushers (HPRC) as they are termed in the diamond i
Jan 1, 2004
-
Implementation of a Heuristic Algorithm to Optimise Stope Limits with Excel ModulesBy Baafi E. Y
A heuristic approach for the optimisation of the stope geometry is presented. The heuristic method uses economic model of a given deposit to search for the best combination of mining blocks that res
Jan 1, 1998
-
Relationship of Joint Orientation with Hole Spacing Parameter in Multihole BlastingBy Badal R
Rock Discontinuities ("joints") affect blasting results. An investigation was carried out to understand if blast parameter such as spacing needs to be altered with the change in joint direction. Sma
Jan 1, 1990
-
Sinking No. 7 Shaft û Broken Hill South LimitedThe purpose of this paper is to discuss briefly the problems encountered in designing and sinking No 7 shaft, and to present the methods employed in the operation.The illustrations accompanying the pa
Jan 1, 1932
-
High Temperature Carbonate-Hosted Massive Sulfide Ores in the American CordilleraCarbonate-hosted massive sulfide ores of the American cordillera compose a distinctive genetic class. Discordant fea-tures of occurrence together with measured high-temperatures of formation indicate
Jan 1, 1990
-
Negotiating Mining Agreements with Pacific CountriesThis paper briefly discusses the negotia- tion of the more important provisions in agree- ments for exploration and mining rights with Pacific countries. LAND RIGHTS Land rights are complicated and s
Jan 1, 1987
-
Diversion Tunnels for the Magat River Multi-purpose Project-Geotechnical AspectsThe paper describes the geotechnical as- pects of design and construction of two 12 m diameter concrete lined tunnels from the start of design to completion of construction. Prob- lems occurred due
Jan 1, 1981
-
An Integrated Economics Model for In Situ Resource Utilisation in Support of a Mars ColonyBy C Tapia Cortez, A G. Dempster, R Fradet, S Saydam, T de Roche, R Shishko, J Coulton
Human ventures into space are entering a new phase in which missions formerly driven by government agencies are now being replaced by those led by commercial enterprises – in launch, satellite deploym
Nov 4, 2015
-
Approaches to Estimating the Erosional Stability of the Nabarlek Tailings Pit CoverBy S J Riley
The cover (cap) over the tailings pit at Nabarlek uranium mine must be structurally stable as it will act as a barrier to radon gas emission and have to contain other long-lived radionuclides. Struc
Jan 1, 1994
-
Walhalla and the Long Tunnel Extended Gold Mine: An Historical ReviewBy Roddick F
From its mining lease at the northern end of Cohens Reef at Walhalla in the North Gipps- land mountains, the Long Tunnel Extended Gold Mining Company produced 13,695kg of gold, which at 1982 prices
Jan 1, 1982