Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Kalgoorlie Tailings Retreatment Project-'Kaltails'

    The Kaltails Project is situated close to the city of Kalgoorlie-Boulder in Western Australia. Located on the south-eastern fringe of the Golden Mile, Kaltails has been in operation since June 1989. T

    Jan 1, 1992

  • AUSIMM
    The New Lead and Zinc Flotation Sections of the Concentrator of Broken Hill South Limited

    In this paper is given a description of the flotation plant recently erected by Broken Hill South Limited at the South Mine, Broken Hill, N.S.W. It has been built on the site of the old flotation plan

    Jan 1, 1935

  • AUSIMM
    Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) Mine

    By K Rozlapa, P Waters, H Middlemis

    A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s

    Jan 1, 2006

  • AUSIMM
    A Multiscale Approach to Hydrothermal Gold Systems - Unravelling Mineralisation Processes at the Plutonic Gold Mine

    By J Walshe, G Duclaux, L A. Fisher, R Hough, J S. Cleverley, M F. Gazley

    Characterisation of hydrothermal gold systems across multiple scales is increasingly important for our understanding of ore deposit genesis and for targeting new mineralisation. Published work on mult

    Sep 26, 2013

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021

  • AUSIMM
    Some considerations on rock slope stability issues in Afghanistan with an emphasis on Kandahar Region

    By A B. Jahed, Ö Aydan, T Ito

    In this study, the authors compiled some case history data and present some typical examples of rock slope stability issues in Afghanistan with a special emphasis on Kandahar region and categorise roc

    Nov 29, 2022

  • AUSIMM
    Mine Project Risk Management

    Risk management has become an essential tool for mining companies to ensure their projects are well-managed and profit expectations are achieved. Risk management has also become a mandatory corporate

    May 24, 2012

  • AUSIMM
    The Use of High-Water Rapid-Solidifying Material as Backfill Binder and its Application in Metal Mines

    By Liu Wenyong, Huang Yucheng, Yang Ba

    High-water rapid-solidifying material, called æhigh-water materialÆ, is a new material developed by the authors over many years. The material can solidify nine times its volume of water into solid. Th

    Jan 1, 1998

  • AUSIMM
    Magnetite – A Higher-grade Blast Furnace Feed and Its Potential Benefits for the Ironmaker

    By K Edwards, A J. J Mouton

    Hematite represents the vast majority of iron ore exported from Australia as the development and processing cost of magnetite is generally seen as a barrier to the development of vast magnetite resour

    Jul 13, 2015

  • AUSIMM
    Wall Control Blasting

    By D P. Blair

    There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential

    Aug 24, 2015

  • AUSIMM
    Coal as a Source Rock for Hydrocarbon Gas in the Aldebaran Sandstone, Denison Trough, Bowen Basin - Geochemical Evidence

    By Golding S. D, Price P. L

    The Early Permian Aldebaran Sandstone is the main hydrocarbon reservoir in the Denison Trough. Contained hydrocarbon gas has a wet gas index (C1/CI - C4) of between 0.87 and 0.97 (N=10), and consti

    Jan 1, 1991

  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Maximise Orebody Value through the Automation of Resource Model Development Using Machine Learning

    By S Oliver, D Willingham

    "Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation

    Jun 15, 2016

  • AUSIMM
    Raiseboring Experience with the Wirth Two Stage Sequential Reaming Head and HG330 Raiseborer

    By Fletcher A. E W

    Ever since it made its debut in 1962, in the form of a Robbins 31R, the raiseborer has become an accepted tool in the mining and civil construction industries. The first raiseborer to be used in th

    Jan 1, 1987

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Transformation of automated optical image analysis software Mineral4/Recognition4 to Mineral5/Recognition5

    By A Poliakov, E Donskoi, K Vining

    The automated optical image analysis software Mineral4/Recognition4 (M4/R4) is capable of performing comprehensive characterisation of different materials throughout the iron ore value chain, includin

    Nov 8, 2021

  • AUSIMM
    Orepass Loss Mitigation Approach in Malmberget Mine

    By A Salama, J Greberg, B Skawina

    In today’s underground mass mining, the orepass is an important part of the infrastructure as it connects two or more mine levels and is used for conveying or storing large amounts of material. One of

    May 9, 2016

  • AUSIMM
    Critical process design considerations from test work to operations

    By A Dennis, T Hunter, R Coleman

    For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin

    Sep 11, 2017

  • AUSIMM
    Mining Grade Control ù Past, Present and Future

    The objectives of mining grade control are presented and examples of the techniques used in various open pit and underground mines are used to define the attributes of good grade control. Reasons are

    Jan 1, 2000

  • AUSIMM
    Fluid Inclusion Study of the Martha Gold-Silver Deposit, Waihi

    By S B. Martin, M P. Simpson, J L. Mauk

    The Martha deposit in Waihi, New Zealand, is a giant adularia-sericite epithermal gold-silver deposit that formed 6.0 to 6.1 Ma, and has produced over 6.4 Moz gold and 39.9 Moz. Fluid inclusion analys

    Jan 1, 2007