Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Practical Sampling for Online Analysis and Composite Samples of Slurries - The Art of Compromises

    In practice a sampling solution is a compromise of many requirements: the sample should be representative; the sampling system should also be reliable, less than 95 per cent availability rest

    Mar 1, 2010

  • AUSIMM
    Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam Deposit

    By M K. Kapo, S C. Nzama

    The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte

    Aug 18, 2014

  • AUSIMM
    Rosedale Outfall Project – Overcoming Extreme Conditions

    By T Ireland

    The Rosedale Outfall Project utilised an earth pressure balance (EPB) tunnel boring machine (TBM) for only the second time in Auckland. Although the tunnel was excavated fully through East Coast Bays

    Mar 8, 2011

  • AUSIMM
    The Relationship Between Mining and Socio-Economic Well-Being in AustraliaÆs Regions

    By R R. J McAllister, K Moffat, S Heyenga

    This paper examines the statistical relationship between quality of life indicators and the gross value of mineral production from Australian regions. We used quality of life indicators, aggregated fo

    Jan 1, 2009

  • AUSIMM
    The Thermodynamics of Zinc Oxide in Iron Silicate Slags

    By Lee H. G, Li H, Hayes P

    Slag from the smelting of lead can contain up to 20 per cent zinc as an oxide. An understanding of the lead smelting process and of the subsequent fuming process for the recovery of zinc is enhanced

    Jan 1, 1993

  • AUSIMM
    Bulk Explosives go Tunnelling in Hong Kong

    The constructionhunnelling industry in Hong Kong has taken an upturn during the last few years due to the commencement of works to relocate the International Airport to Chek Lap Kok Island. The Airp

    Jan 1, 1994

  • AUSIMM
    Stope Design Within a Final Pillar Retreat Sequence at Xstrata Copper's Mount Isa Copper Mines

    Xstrata CopperÆs Mount Isa Copper Operations is located in mineral rich north-west Queensland and is one of the largest sources of copper in the world. This world-class underground operation is planne

    Jan 1, 2007

  • AUSIMM
    Reducing the environmental and economic cost of metal extraction by optimal blast design

    By A Tsang, D La Rosa, L Julian, W Hunt, R Pratama

    Mineral extraction is facing the twin challenges of finite resources and increasing environmental and economic costs. Society’s growth is matched by an increase in demand for the earth’s resources. It

    Sep 1, 2024

  • AUSIMM
    Rock Bolts for Permanent Tunnel Lining

    By J de Witte

    When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i

    Mar 8, 2011

  • AUSIMM
    Distribution of impurity elements in oxygen-enriched top-blowing nickel smelting with Fe extraction-oriented slag adjustment

    By Y Cui, G Cao, H Zong, J Zheng, J Wang, S Yue, J Zhao, B Li

    The iron (Fe) concentration in nickel slag is high, making its recovery and utilisation a hot and challenging topic. In the nickel smelting process, using CaO instead of SiO2 to adjust slag’s composit

    Jun 19, 2024

  • AUSIMM
    The use of Conditional Simulation for Drill Hole Spacing Evaluation and Decision-Making in Telégrafo Project, Northern Chile

    By O Rojas

    The Telégrafo copper – gold deposit is located in the Centinela district of the Antofagasta region in northern Chile. Telégrafo is a porphyry copper deposit of Eocene – Oligocene age which h

    Aug 22, 2011

  • AUSIMM
    Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn Deposit

    By B Armstrong

    The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value

    Sep 5, 2011

  • AUSIMM
    Increased drilling accuracy leads to significant improvement in ore recovery and dilution

    By R Stimpson, B Johnson, B Hesse

    During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto

    Mar 15, 2021

  • AUSIMM
    Challenges in Modelling Large Complex Orebodies at the George Fisher North Mine

    By M Haydon

    How do you portray a large structurally and stratigraphically complex deposit to return a meaningful resource estimation, and produce a geological model that is useable for planning on a daily basis?

    Jan 1, 2006

  • AUSIMM
    Study on Improving Roasting Behaviours and Metallurgical Properties of Brazilian Hematite Pellets by Adding Magnetite with High Sulfur Content

    By Z Li, J Pan, D Zhu, W Zhou

    In order to enhance the roasting behaviours and metallurgical properties of hematite pellets, which have the problems of high roasting temperature and low compressive strength, a process of producing

    Aug 12, 2013

  • AUSIMM
    Evaluation of the impact of modifying froth launders in an industrial flotation bank using novel flotation models

    By A Yáñez, P Vallejos, R Grau, J Yianatos

    In flotation cells, especially in large flotation units, froth management is a crucial variable that should be considered during the design phase or optimised to improve the performance of existing fl

    Aug 24, 2022

  • AUSIMM
    Iron RoadÆs Prediction of Magnetite Concentrate Production from the Central Eyre Iron Project

    By P J. Marsh, P J. Bartsch, N J. Semler

    Iron Road Limited is currently studying the feasibility of producing 20 Mt/a of high-grade (67 per cent Fe) magnetite concentrate from a 2.6 Bt resource (JORC) located at Warramboo on the central Eyre

    Aug 12, 2013

  • AUSIMM
    The Development of Small-Scale Tests to Determine Hydrometallurgical Indicies for Orebody Mapping and Domaining

    By L L. Kuhar

    The AMIRA International P843A Geometallurgical Mapping and Mine Modelling (GeMIII) project is an interdisciplinary research collaboration between 17 global mineral companies and four research organisa

    Sep 5, 2011

  • AUSIMM
    Geochemical Mass Balance and Characterisation of Pollutants Draining from a Nickel Mine Site

    By N Dube, K L. Sandvik, C Mutevhe

    Trojan Nickel Mine is the largest producer of Ni, Cu and Co in Zimbabwe. The mine has operated a nickel flotation concentrator and base metal refinery continuously since 1969, creating 28 million tonn

    Jan 1, 2006

  • AUSIMM
    A Dynamic Ore Reserve Calculation and Accounting System for a Stratiform Orebody

    By Jaczkowski B

    The lower orebody (LOB) at Chingola Divi- sion of Nchanga Consolidated Copper Mines Limited (NCCM) accounts for approximately 30 per cent of the total copper production for the company. The uniform

    Jan 1, 1977