Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Opportunities for Integrated Mine Management to Minimise Risk and Create Value
By D Rattray, D Macfarlane, I Robb, N Halpin, G T. Dale
Mining faces many environmental, social and regulatory liabilities of which water management is just one. Others include site rehabilitation, carbon emissions, biodiversity offsets, strategic cropping
Nov 26, 2013
-
Project-Finance Risks ù Due Diligence Matters
Project-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/
Jan 1, 2007
-
Mineral Project Management - A Perspective from Four Decades in the Industry
By J S. Dunlop
At its most basic level, minerals project management may be broken down into a series of logical chronological phases, described in this paper as: exploration, discovery; scoping and pre-feasibility;
Jul 15, 2013
-
Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in India
By I D. Gregson, A Gandhe, A S. Garcia, K M. MacAndrew
"Falls of ground still cause around one-third of all underground mining fatalities. The recent introduction of mechanised room and pillar working into Indian coalmines is an example of the application
Nov 5, 2014
-
The Integrative Technology of Slon Magnetic Separator and Centrifugal Separator for Processing Oxidised Iron Ores
By X Dahe
SLon vertical ring and pulsating high gradient magnetic separators possess excellent mineral processing ability and have been widely applied to process oxidised iron ores. SLon centrifugal separators
Jul 11, 2011
-
RISKGATE – Shared Coal Mining Knowledge for Managing Risks across Ground Management
By P Bergin, J M. Galvin, J Harris, J Li, P Kirsch, M Shi, B Hebblewhite, B Whittaker, R Mitra, D Sprott
Controlling unwanted ground movement is critical in mining as well as many other highly hazardous environments, such as construction and tunnelling. Sharing knowledge about effective hazard management
Nov 5, 2014
-
Maximising the value of a drilling program – case study in a challenging environment
By A A. Latscha, D O’Connor
Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO
May 24, 2023
-
Sampling strategy by statistical analyses of LIBS data in the context of a portable gold analyser
By M Castello, P Bouchard, M Sabsabi, A Blouin, B Nguegang Kamwa, M Constantin, K Fytas, M Laflamme, K Rifai, F Vidal
Canada’s Quebec province operates 26 metal mines, 19 of which are producing gold and generating over C$1.8 billion (US$1.3 billion) annually. In all those mines, numerous samples of rock are collected
Sep 20, 2017
-
Simplified Hybrid Semi-autogenous Grinding Mill Control – Explanation and Practical Results at the Porgera Concentrator
By E Beltran, S Ngunz, F Orrante, F van Zyl, M Westcott
"The primary control objective of the project is to achieve milling optimisation by ensuring that the energy available for rock breakage is used as efficiently as possible. This is achieved by increas
Oct 10, 2016
-
Automation of the Kimberley Nickel Mine Flotation Operation Using an Advanced Control System
By J Knoblauch, D, P J. J Strobos, C Foggo
The Sally Malay Project is located 120 km north of Halls Creek in the eastern Kimberley region. Since commissioning, ongoing improvements on the plant have resulted in recoveries now greatly exceeding
Jan 1, 2006
-
Optimisation Opportunities for High Pressure Grinding Rolls Circuits
By B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson
The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on
Oct 29, 2012
-
Operating Strategies for Custodians of Company Assets Creating Wealth
By A L. Welsh, P S. Newling
Mill operators are entrusted to manage what are normally the largest capital assets on any mine site. Achieving maximum utilisation and lowest costs that drive operating margins are realised by applyi
Sep 7, 2015
-
Flotation Mechanism Design for Improved Metallurgical and Energy Performance
By R Coleman
The flotation mechanism plays a key role in the flotation process. It is used to provide the contact between solid particles and bubbles and also the energy for these particles and bubbles to attach.
Aug 8, 2011
-
Acid Mine Drainage Treatment at Herbert Stream, Stockton
By M Watts, P Lindsay
Herbert Stream, a tributary of the Waimangaroa River on the Stockton Plateau, has elevated metal concentrations and low pH characteristic of acid mine drainage (AMD). Dissolved aluminium concentration
Jan 1, 2007
-
Designing User Interfaces for the Mines of the Future – User Centred Approach
By E Widzyk-Capehart
The mines of the future can be envisioned as complex, large-scale technological systems being operated remotely from few centrally located (major cities) operating centres and skeletal crew stationed
Nov 22, 2011
-
Fatal Flaws in Technical Due Diligences
By A J. H Newell
The background and the basis for conducting a Technical Due Diligence are discussed as well as the source information, typical studies and potential limitations. Typical short comings including ‘show-
Sep 7, 2015
-
Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field
Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field
Sep 13, 2010
-
Didipio - Learning the Lessons, Adapting and Getting Ready for Production
By R Redden
"The Didipio Gold-Copper project in the Philippines has been a well-defined reasonably high gold grade porphyry for almost two decades. OceanaGold are now bringing the project into production in late
May 24, 2012
-
Kopanang Mine Rail Haulage Tramming System
With the theme of û æUnderground Ore Handling SystemÆ, Kopanang Mine completed an extensive project on a specific system with technologies for the handling of ore from a dedicated drawpoint to the sha
Jan 1, 2005
-
Is an 80th Percentile Design Point Logical?
By D David
Clearly a plant designed only to treat average ore at the nameplate rate will fail to achieve nameplate in any typical year. To insert the necessary capability to achieve nameplate it is common proces
Jul 15, 2013