Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Lake Cowal Foundation- Environmental and Community Sustainability Beyond the Mine Fence

    By D Johnston

    Within the first full year of BarrickÆs Cowal Gold Mine operation, the Lake Cowal Foundation Limited (LCF) has already been delivering results consistent with its goal to protect and enhance the natur

    Jan 1, 2007

  • AUSIMM
    The State of Sampling Practice in the South African Minerals Industry

    The state of sampling practice in South African minerals industry must be appreciated in the context of the changes that the country has recently lived through. These include the entrepreneurship and

    Mar 1, 2010

  • AUSIMM
    Spodumene: A Mineral Source of Lithium

    By Elliott A, Kingsnorth D. J

    The development of a large high grade spodumene orebody, in excess of 30M tonnes containing at least 7M tonnes at 4.0% Li20, by Lithium Australia Ltd at Greenbushes, Western Australia is significan

    Jan 1, 1989

  • AUSIMM
    Challenges of Developing Low-Grade Deposits in æNew WorldÆ Countries from a Mining ConsultantÆs Perspective

    By L Lorenzen, H Muller, L Bernard

    Australian companies and consultants are becoming ever more involved in projects in African, South American, East European and Middle Eastern countries. However, significant differences in culture and

    Sep 26, 2013

  • AUSIMM
    Geotechnical Challenges in Cave Monitoring – a Modern Approach

    By A Jäger, J L. Lett, J Rachocki and B Mobilio

    The Newcrest Mining Limited Cadia East Panel Cave mines near Orange, New South Wales, Australia commenced production 1200 m below the surface in May 2014. Understanding the mine-wide impact caving had

    May 9, 2016

  • AUSIMM
    Computer Assisted Ore Reserve Calculations at Western Mining Corporation Ltd's Kambalda Nickel Operations

    By Reichman J. P

    Extensive use is made of a small scale computer (IBM 1130), in the calculations of ore reserves for Western Mining Corporation's nickel mine at Kambalda, W.A. All surface drilling data such a

    Jan 1, 1973

  • AUSIMM
    Paste Backfill for Enterprise Mine

    By D Morrison, P Goodman

    The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cur

    Jan 1, 1998

  • AUSIMM
    Poorly-diffracting Material as a Trace Element Repository

    By Eggleton R. A

    X-ray diffraction techniques are commonly used in the identification and quantification of fine-grained materials. A relationship exists between the size of crystals in a sample and the degree to w

    Jan 1, 1997

  • AUSIMM
    Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle Mine

    By G B. Smith

    Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot

    Mar 21, 2011

  • AUSIMM
    Precharging in previously preconditioned ground

    By E Hawkins, S Sheldon

    Block caving is becoming a more widely adopted mining method allowing for underground massive low grade orebodies to be extracted economically. Underbreak during cave propagation is difficult to predi

    Mar 15, 2021

  • AUSIMM
    Technical Note - Rapid Production of High Quality Polished Sections for Automated Image Analysis of Minerals

    By Wittenberg J. C, Reid A. F

    A method is described for the rapid and effective production of polished section mounts of ore and mineral particulates to the standards required for automated image analysis. This requires mounting w

    Jan 1, 1984

  • AUSIMM
    Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to Mining

    By J Joy, A Bye, G V. Kizil

    This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame

    Jul 10, 2012

  • AUSIMM
    Mining Methods at Mount Morgan Limited, Mount Morgan, Queensland

    By Patterson B. G

    The small party of mining men who formed the original Mount Morgan Syndicate in 1882, commenced operations on the top of the mountain with what were practically nothing more than small hillside quarri

    Jan 1, 1939

  • AUSIMM
    Development of new performance prediction models for a raise boring machine based on indentation tests

    By C Balci, D Tumac, A Sheterpour-Mamaghani, E Dogan, A Kocbay, T Erdogan, A Gumus, H Copur, E Altintas

    Excavation of vertical and/or inclined shafts in the underground structures requiring careful design and planning. Raise Boring Machines (RBMs) are commonly used for excavation of shafts for different

    Nov 29, 2022

  • AUSIMM
    Climate Alarm's Lessons for New Leaders - Overcoming Fear with Facts for Freedom

    People in economically developed societies demonstrate inherent human care for Earth and want to stop pollution. Yet efforts to clean Earth seem bogged in confusion from wildly contradictory and alarm

    Jan 1, 2009

  • AUSIMM
    A Three-Dimensional Structural Interpretation of the Olympic Dam Deposit ù Implications for Mine Planning and Exploration

    By J, T C. McCuaig, J Hodgkison, T Fouet

    Olympic Dam is the eighth largest Cu deposit and the largest U deposit in the world, with approximately 35 million tonnes of contained Cu and 1.2 million tonnes of U. The most recent resource estimate

    Jan 1, 2004

  • AUSIMM
    Paper No. 130. Gold Dredging in Otago.

    As the chief field of the gold dredging industry in Otago is the district traversed by the Molyneux River (called above Cromwell the Clutha) and its tributaries, a brief reference to the geology of th

    Jan 1, 1903

  • AUSIMM
    Active and Passive Seismic Monitoring of Cave Front Evolution

    By R A. Lynch

    The state-of-the-art in cave seismic monitoring is reviewed, with the latest developments in active seismic monitoring included. Seismic monitoring systems are routinely used by most of the world’s bl

    May 9, 2016

  • AUSIMM
    Control System Selection, Strategy and the Future at Pasminco Mining - Broken Hill's Southern Concentrator

    In 1987 the control strategies at the then ZC Mines' New Broken Hill Consolidated concentrator were a miscellaneous mixture of computer hardware and technology for ISA, grinding and residue thi

    Jan 1, 1991

  • AUSIMM
    Production Drill and Blast Practices at Ridgeway Gold Mine

    Newcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram

    Jan 1, 2002