Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Optimizing the Initiation Position of Geophysical Exploration Charges

    By E. McCullough, D. Preece, M. Ortel

    Geophysical explosive charges are used in mineral resource exploration. They are detonated subsurface and radiate sonic waves into ground monitors, which detect the vibration waves and their interacti

    Jan 1, 2013

  • ISEE
    The Role of Particle Size and Shape on the Propagation of Reaction in Explosive and Pyrotechnic Formulations

    By James L. Austing, Allen J. Tulis, Ronald Pape, Ronald G. Draftz

    In a certain sense, the explosives industry began in the 13th century with the invention of black powder, which is an intimate mixture of sulfur, carbon black or charcoal, and potassium or sodium nitr

    Jan 1, 1995

  • ISEE
    An Integrated Explosive Management, Blast Design and Loading System

    By Ola Lindahl, Mark Irving, John Hutchings

    "Blasting is a process starting with a geometric description of the block of rock and ending with a pileof fragmented material. A key step in improving the productivity and quality control over the pr

    Jan 1, 1997

  • ISEE
    Studies on Safe Blasting Technique in Fire Area of Coal Mines

    By A Bagchi, Nabiullah, Jagdieh

    "A number of coal mines in India are affected by fire. Most of coking coal reserves in the country are located in Jharia coalfield where more than 18 sq. km is in the grip of fire. Generally such fire

    Jan 1, 1993

  • ISEE
    Instruments and Available Internet-Based Data for Documenting Weather Conditions

    By Donna Kliche, Charles Kliche

    It has been previously documented that various weather conditions such as wind direction and speed, cloud cover and, especially, temperature inversions can significantly affect the overpressure genera

    Jan 1, 2011

  • ISEE
    Positioning of Mobile Mining Equipment Using GPS Technology & Mining and Information, Defining the Need

    "AQUILA Mining Systems Ltd. is a Canadian company that designs and develops monitoring, control and navigation systems for the surface and underground mining industries. In 1992, AQUILA Mining Systems

    Jan 1, 1997

  • ISEE
    Relationship between peak particle acceleration, velocity and displacement of blast vibration

    By Ruilin Yang

    The following simple equations are frequently used within the blast vibration community;PPA f PPV v = 2p · , PPV f PPD d = 2p · ,a f PPV PPA 2p = , and v f PPD PPV 2p = where, PPA is the peak particle

    Jan 1, 2012

  • ISEE
    Journal: 100 Years / THE ST. MARY’S PARK TUNNEL, N.Y.C. & H.R.R.R.

    By Robert Hopler

    As a part of the depression and rectification work on the Port Morris branch of the Harlem Division of the New York Central & Hudson River Railroad, a short tunnel is being driven under St. Mary’s Par

    Jan 1, 2006

  • ISEE
    Seismograph Calibration - What You Should Know

    By Bob Turnbull

    The dictionary definition of calibration is: to determine by measurement or comparison with a standard, the corre c t value for each scale reading on a device.1 As a consultant or blast contractor, yo

    Jan 1, 2004

  • ISEE
    Determining the Quickest Way to Prepare a Dragline Pad Using i-PushTM Dozer Simulation Software

    By Stephen Chung, Graham Mustoe, Joe Haid

    In an open cast coal mining operation, a 305 m (1000 ft) long by 49 m (160 ft) thick overburden cast blast can produce more than a million cubic yards of broken muck that needs to be removed before th

    Jan 1, 2006

  • ISEE
    A Mine-to-Crusher Framework for Aggregate Operations

    By Diogo Fonseca, José Manuel, Nuno Fernandes, Blessing Taiwo

    This research focuses on enhancing the synergy between blasting and primary crushing operations in quarries. A blast operation at dstgroup aggregate quarry in northern Portugal was simulated to fine-t

    Jan 21, 2025

  • ISEE
    Journal: Blasting in the New Millennium: To Wash or not to WashThat is the Daily Question

    By Steve Dillingham

    Here in the United States, as well as around the world, pose a daily dilemma - to wash or not to wash. Let’s face it, all trucks, especially our industry work horses - bulk trucks - get dirty. We all

    Jan 1, 2001

  • ISEE
    External Shock Migration for Buried Structures

    By Henry S. McDevitt

    External Shock Mitigation (ESM) is being studied as a possible means of retrofitting existing buried structures to provide additional protection from ground shock. As part of this study, two tests wer

    Jan 1, 1997

  • ISEE
    New Affordable, High-Sped, Solid State, PC Based Video Imaging Systems and Software

    By Don W. Lake

    Of all the blast monitor& instrumentation systems and techniques av&able today, highspeed photography and videography remain as the most valuable, stand alone, diagnostic techniques to evaluate full s

    Jan 1, 1992

  • ISEE
    The Fragblast History FB 1- FB 10

    By Agne Rustan

    This paper is intended to give a summary of the first ten Symposia on Rock Fragmentation by Blasting where the symposia activities were governed by a Steering Committee replaced at Fragblast 2 by an I

    Jan 1, 2014

  • ISEE
    I-40 Rockslide Causes Mountains of Problems

    By Corry Goumans, Dwayne Wallace

    "On July 1, 1997, a rockslide occurred on the I-40 in Hayward County, North Carolina that completelyblocked all lanes and disrupted traffic flow in the region. Remedial measures were undertakenimmedia

    Jan 1, 1999

  • ISEE
    A Tiered Approach to Mitigating the Environmental Effects of Underwater Blasting

    By Thomas M. Keevin, Gregory L. Hempen

    "Natural resource agencies, under various regulatory authorities, are challenged with permitting underwater explosive use while at the same time protecting aquatic resources. Deciding on whether or no

    Jan 1, 1995

  • ISEE
    A Simple Method of Determining Site-Specific Safe Decking Procedures in Order to Avoid Dynamic Pressure Issues When Decking

    By Neal Lee, Braden T. Lusk, Brendan McCray

    Determining the minimum amount of inert material that can be used between explosive columns is a complex problem. Using too little inert material can result in detonator/primer failure, either by symp

    Jan 1, 2016

  • ISEE
    DynoMiner™ APS Underground Explosive Loading System

    By Daniel Roy

    This paper introduces a new, safer bulk emulsion loading system for underground mining operations. The features and benefits of the equipment, along with the use of Dyno Nobel Inc. patented gassed emu

    Jan 1, 2003

  • ISEE
    The Mechanisms of Rock Damage in Blasthole Open Stope Mining: Blast Induced Versus Stress Induced

    By Qian (Ken) Liu, Remi Proulx

    A large scale blast damage project was carried out over the past two years at INCO Ltd Manitoba Division co-funded by the Canada/Manitoba Mineral Development Agreement. The experiment was conducted at

    Jan 1, 1995