Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    3D Computer Simulation of Bench Blasting with Precise Delay Timing

    By Dale S. Preece

    "Detonation delay timing has been an important aspect of quality rock blasting for decades. Detonators that enable delay timing have improved over the years especially with the recent advent of precis

    Jan 1, 2009

  • ISEE
    The Effect of Prill Specifications on Emulsion-ANFO Blends

    By Greg S. Williams, Richard W. Givens

    This paper examines the effect of prill size consistency, internal panicle density, and oil absorbency on Ammonium Nitrate Fuel Oil (ANFO)-emulsion blends. By analyzing these physical properties of pr

    Jan 1, 1992

  • ISEE
    Toxic Fume Comparison of a Few Explosives Used in Trench Blasting

    By Marcia Harris, Richard Mainiero, Michael Sapko

    Since 1988, there have been 17 documented incidents in the United States and Canada in which carbon monoxide (CO) is suspected to have migrated through ground strata into occupied enclosed spaces as a

    Jan 1, 2003

  • ISEE
    Report on the New Risk Criteria Proposed by the RCC Risk Committee

    By Tom Pfitzer, Alice Correa, Meredith Hardwick

    The past decade has brought significant changes in the use of risk-based criteria for safety within the U.S. Department of Defense. The Range Commanders Council (RCC) chartered a working group to deve

    Jan 1, 2007

  • ISEE
    Improving Geologic Knowledge with IOT Sensors on Blasthole Drills

    By Steven Putt

    Seismic While Drilling (SWD) is a newly developed technology in the mining industry. Improving upon Measurement While Drilling (MWD) systems, SWD measures mechanical properties of the rock at incremen

  • ISEE
    Borehole Geophone Method for Estimating Tunnel Blast Vibration Propagation

    By Kyle Ott, Bernard Daly, Syed Haq, Douglas Anderson, Parsons Brinckerhoff

    Drill and blast was determined to be the most cost-effective means of excavating the Raw Water Tunnel (RWT) for the Croton Water Treatment Plant in the Bronx, New York City. One of the major issues co

    Jan 1, 2012

  • ISEE
    "Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"

    By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo

    For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish

    Jan 1, 2016

  • ISEE
    Near-Field Blast Vibration Monitoring: Practical Considerations and Issues

    By John Heilig, Patrick Andrieux

    "Near-field monitoring of blast induced seismic vibrations is a practical and useful way of assessing blast field behaviour for diagnosis and optimization purposes. It is also necessary in order to pr

    Jan 1, 1995

  • ISEE
    Use of Signature Hole Analysis for Blast Vibration Control at the Highvale Mine

    By Ron J. Elliott, Dylan Wedgewood

    A series of five signature holes were blasted at the Highvale Mine and the resultant seismic data was analyzed to make recommendations on how best to address neighbour complaints regarding blast vibra

    Jan 1, 2018

  • ISEE
    Blast Control Measures at the Speekfontein Colliery Strip Mine Situated Close to a Major Power Situation in South Africa

    By A Rorke, B Cubitt, R Beeslaar

    The recent drop in the value of the South African Rand has resulted in an increased export value for South African coal and has lead to new coal reserves becoming available for mining. Very often thes

    Jan 1, 1997

  • ISEE
    Full-Field Deformation Measurements Under Explosive Loading Conditions Using Multi-Image Pattern Analysis

    By Xing Zhao, Michael A. Sutton, Vikrant Tiwari, Damien Bretall, Xiaomin Deng, William L. Fourney, Uli Leiste

    The dynamic response of a thin aluminum plate subjected to both shallow and deeper buried blast loading was studied. Using a combination of high speed stereo-vision and three dimensional digital image

    Jan 1, 2010

  • ISEE
    Experience with the change from cartridged to bulk site sensitized emulsion products.

    By Peter Moser, G. Reihholf

    Holcim, one of the world's leading suppliers of cement, aggregates and concrete, has set up a few years ago a working group “Quarry” in order to optimize the performance of its central European quarry

    Jan 1, 2006

  • ISEE
    What We Learned While Determining VOD’s in Underground Small Hole Blasting

    By Scott Rosenthal, Kyle Murphy

    This paper discusses the trials and tribulations of obtaining Velocity of Detonation (VOD) readings in small diameter blast holes in an underground mine. Montana Technological University (Montana Tech

  • ISEE
    Experimental and Computational Investigation of the Fundamental Mechanisms of Cratering (c03a8e57-961a-42b6-9348-3dd891fa944e)

    By B Brown, P J. Hommert, B J. Thorne

    "Early attempts at estimation of stress wave damage in blasting by use of finite element analysis met with limited success due to numerical instabilities that prevented calculations from being carried

    Jan 1, 1990

  • ISEE
    Computer and Centrifuge Modeling of Decoupled Explosions in Civilian Tunnels

    By Neil T. Davie, Thomas K. Blanchat, Thomas C. Togami, Joe R. Weatherby, Dale S. Preece, Robert A. Benham, James J. Calderone

    "Geotechnical structures ,such as underground bunkers, tunnels, and building foundations aresubjected to stress fields produced by..the gravity load on the structure and/or any overlyingstrata. These

    Jan 1, 1998

  • ISEE
    Analysis of Rock Fragmentation by Blasting Using Combined CFD/FEZ/DEM Models

    By Alejandro Ferrada Vergara, Héctor Espinoza Muñoz

    Drilling and blasting stages are considered factors that impact downstream processes significantly and over all the mining business value chain. Adequate control of these processes may represent energ

    Jan 1, 2016

  • ISEE
    Concrete Bridge Pier Removal in an Environmentally Sensitive River

    By Paul Kunze

    When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.

    Jan 1, 2014

  • ISEE
    Using the Superposition of Seed Waveforms to Predict Seismic Effect by Blasting

    By Yang Jun, Qu Mei, Zheng Yao-wu, Chi Li-yuan

    Due to the necessity of the prediction of blasting seismic effect around strip mine bench blasting area, the paper provides a method to predict the blasting seismic effect by employing the superpositi

    Jan 1, 2015

  • ISEE
    Concepts and Case Study for Regular Rhythmic Timing and Sequence

    By Neal Lee, Braden T. Lusk, Jhon Silva-Castro, Patrick J. Jenks

    "Timing and charge sequence are very important for optimized blast design. Traditional nonelectricinitiation systems have moved the industry toward a system of delays consisting of hole-to-hole androw

    Jan 1, 2016

  • ISEE
    Accurate, Secure Internet Explosives Silo Weight Database using Bolt-on Sensors

    By Robin Shepherdson

    Security concerns have prompted the Department of Homeland Security to investigate the use of recording systems on all vessels holding materials used for blasting; a new regulation is expected in the

    Jan 1, 2015