Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Open Pit Mine Planning: A Practical Optimization and Evaluation Approach Under Uncertain Markets

    By Sabry A. Sabour

    Metal price is among the key variables in the open pit optimization and the economic evaluation process. The common approach to handle metal prices in open pit mine planning is to optimize the ultimat

    Aug 1, 2013

  • CIM
    Effective Methods of Arsenic Removal from Gold Mine Wastes

    By J. Lee, R. G. Rosehart

    "The basic problem of arsenic contamination from mine water is discussed. Effective methods of removal involving chemical precipitation, activated carbon adsorption, ion exchange and reverse osmosis a

    Jan 1, 1972

  • CIM
    An Alkaline Glycine-Based Process for Copper Recovery and Iron Rejection from Chalcopyrite

    By B. Tanda

    A process has been developed at Curtin University whereby glycine is used in an alkaline environment to leach gold, silver and copper from their ores, concentrates, process intermediates and wastes. C

    Jan 1, 2016

  • CIM
    40Ar/39Ar Geochronology of Alteration and Petrogenesis of Porphyry Copper-Related Granitoids in the Darreh-Zerreshk and Ali-Abad area, Central Iran

    By P. H. Reynolds, S. Liaghat, A. Zarasvandi

    "Darreh-Zerreshk and Ali-Abad are two relatively small porphyry copper-type deposits in Yazd Province in central Iran. They are located within the central Iranian volcano-plutonic belt, formed above t

    Jan 1, 2007

  • CIM
    Technology Selection for the Genesee Phase 3 Electricity Generating Station Expansion

    By Les Johnston

    _ BACKGROUND - About EPCOR - Genesee Generating Station - Phase 3 Expansion _ TECHNOLOGY SELECTION - Selection Criteria - Combustion Options - Flue Gas Emission Control Options _ STAKEHOLDER V

    May 1, 2002

  • CIM
    Gold Milling at Lac Shortt

    By P. Dyas, H. Zouitt, D. M. Smith

    "Falconbridge Copper's Lac Shortt gold mine is located in northern Quebec approximately 300 km northeast of Val D'Or and 100 km west of Chibougamau (Pig. 1). Engineering for the mill commenced in earl

    Jan 1, 1987

  • CIM
    AC drive application issues

    By A. C. Stevenson

    "There are many critical application issues that affect all AC drives, but there are several that are absolutely mandatory for pulse width modulated (PWM) AC drives. If these rules are not followed, t

    Jan 1, 2000

  • CIM
    Potash Processing: 25 Years of Process Development

    By A. F. Banks

    "Potash processing in Canada commenced on a commercial scale in 1962. Over the last 25 years it has grown into a world-class industry with many advances in processing technology. As it is a relatively

    Jan 1, 1987

  • CIM
    Value Added Aluminum Smelter System Integration: Alouette Phase II Experience

    By A. Noël, R. Lapierre, M. Provencher

    "Modem aluminum smelters are facing significant operating cost pressure. Key methods used by smelters to manage this pressure are automation and production-information systems to optimize processes, m

    Jan 1, 2006

  • CIM
    The Pogo project: flowsheet development and design

    By Eric Konigsmann

    "The Pogo project is located on the Goodpaster River, 38 miles north of Delta Junction in east central Alaska. Sumitomo Metal Mining and Teck Corporation are planning to develop a 2,500 ton per day un

    Jan 1, 2002

  • CIM
    Textural Analysis Provides Clue to Poor Ground Conditions in a Saskatchewan Potash Mine

    By A. Dave Mackintosh

    In 2001, at the CIM AGM in Quebec, a paper discussing poor ground conditions in a newly opened area at Agrium?s Vanscoy Potash Operation?s, suggested load transfer around old workings as a possible re

    Apr 1, 2005

  • CIM
    Mine backfill design and testing

    By Robert J. Mitchell

    A general approach to mine backfill design, including laboratory testing procedures, is outlined in this paper. Relationships between certain design parameters are developed and the effect of other fa

    Jan 1, 1979

  • CIM
    Mocca: A Grinding Circuit Control Application

    By C. Larsen, D. Fragomeni, A. Vien, D. G. Fisher

    "MOCCA is a Multivariable Optimal Constrained Control Algorithm developed specifically for non-square industrial control applications with practical difficulties such as interactions, time delays, con

    Jan 1, 1991

  • CIM
    Electrical and environmental protection of high- and low-voltage mine cables

    By R. W. Mei, R. A. Strombom, D. J. Moore

    "Heat-shrinkable cable accessories are solving problems in the mining industry. This paper describes a range of products used by the industry, including low-voltage splices, high-voltage splices to 8.

    Jan 1, 1980

  • CIM
    Automated Mine Scheduling: What is it and will it help me?

    By Fraser Rowe

    This paper discusses the philosophies, strategies, goals and pitfalls in automating a mine schedule. The intention of the paper is to give an open and honest view of who could benefit from moving to a

    Oct 1, 2009

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • CIM
    Research, Innovation & Reality

    By Richard Burt

    "In seeking to supply the ever increasing needs for raw materials, the mining industry has been required to develop lower grade resources in increasingly remote regions of the world. This has resulted

    Jan 1, 1999

  • CIM
    Chrome Grinding Balls at Campbell Mine

    By Bill Shand

    "Placer Dome - Campbell Mine is a gold mine located at Balmertown in the Red Lake District of North Western Ontario. During the last 50 years, the mine has produced over ten million ounces of gold.A c

    Jan 1, 2001

  • CIM
    A database of underground hardrock mines

    By Peter Moser, Thoma Oberndorfer

    "Within the research project “Mine Development” (Fettweis and Moser, 1990) a PC-based mine database has been built up since 1991 and so far includes detailed technical and economic data of about 150 u

    Jan 1, 1996

  • CIM
    Integrated seismic reflection and borehole geophysical studies at Les Mines Selbaie, Quebec

    By E. Adam, B. Milkereit, M. Salisbury, L. E. Reed, G. Perron

    Integrating seismic reflection, borehole geophysical, and physical rock property studies is an effective means of mapping lithological contacts and structures in the crystalline crust. At Les Mines Se

    Jan 1, 1997