Search Documents

  • SAIMM
    Seismic monitoring of the Northparkes lift 2 block cave?part I undercutting ? Synopsis

    Caving of the second lift of the E26 orebody at Northparkes Mines was monitored with a comprehensive package of instrumentation, including an ISS seismic monitoring system. Seismicity was collected by

    Jan 1, 2008

  • AUSIMM
    Is an 80th Percentile Design Point Logical?

    By D David

    Clearly a plant designed only to treat average ore at the nameplate rate will fail to achieve nameplate in any typical year. To insert the necessary capability to achieve nameplate it is common proces

    Jul 15, 2013

  • AUSIMM
    Some Calculations Dealing with Mine Timber

    ONE of the phases of mining wide ore-bodies, such as are found in Broken Hill, is the laying-out and design of the sill floor gangway timber, When, in the above operation, a detail has to be repeated

    Jan 1, 1923

  • AUSIMM
    Mine Accommodation Strategies ù Case Studies in Developing Countries

    Early strategic mine planning includes decisions over the organisation of work and workforce accommodation. These decisions involve significant commitments that affect not only employee quality of lif

    Jan 1, 2006

  • DFI
    Experience Gained At The Application Of Atlas Piles In Poland

    By Kazimierz Gwizdala

    In recent years, in Poland the ATLAS piles have been successfully applied for some constructions near Gdansk. The piles have been used as foundations for housing and another areas of civil engineering

    Jan 1, 2006

  • IOM3
    Photographic technique for the detection and monitoring of ground movements associated with mining and quarrying

    By P. Grainger, P. G. Kalaugher

    Paper presented at conference and first published in preprint volume of: Risk assessment in the extractive industries, held in University of Exeter, 23-24 March 1994. London: IMM, 1994. Large, unpredi

    Apr 1, 1996

  • NIOSH
    RI 9332 - Evaluation of Ultrasonic Measurement Systems for Bolt Load Determinations

    By Stephen C. Tadolini

    The U.S. Bureau of Mines has developed ultrasonic measurement instrumentation capable of measuring strains and elongations on tensioned and untensioned mine roof bolting systems. This report evaluates

    Jan 1, 1990

  • DFI
    Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, Tennessee

    By James L. Vinson

    Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to

    Jan 1, 2006

  • SAIMM
    The West Driefontein Reclamation Carbon-In-Pulp Plant; Pilot Plant Testwork, Design, Commissioning And Optimization

    By G. D. Buson

    Driefontein Consolidated Limited has a proud history in the South African gold mining industry dating back to March 1945 with the formation of the West Driefontein Gold Mining Company. The reclamation

    Jan 1, 1999

  • CIM
    Truck Lift System

    ? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM

    May 1, 2003

  • NIOSH
    IC 8276 Water Requirements And Uses In New Mexico Mineral Industries (a1ed7c50-9bfd-4fd7-8bf7-857d0ec488ca)

    By M. M. Gilkey

    This report on water requirements for the New Mexico mineral industry includes data on industrial operations closely related to mineral production. It contains general information concerning public wa

    Jan 1, 1965

  • AUSIMM
    Optimum scale of an open pit operation: discount rate and risk

    For a large scale open pit mining and concentrating operation, on a low-grade disseminated ore body, it is possible to set an approximate lower bound on economically feasible operating scales and an a

    Jan 1, 1986

  • AUSIMM
    Image Processing of Central Volcanic Region Geophysics

    By M A. Mongillo

    Most geophysical and geochemical data collected during regional exploration programmes are in vector form (location, value), and have traditionally been presented and interpreted in a profile or conto

    Jan 1, 1992

  • ISEE
    Blasting Bridges and Culverts in Fish Streams: Water Overpressure and Vibration Analysis

    By Kristen Dunlap

    There are several thousand remote stream crossing structures in the Tongass National Forest in need of removal. In 2007 thirty-three collapsing log bridges, log culverts, and metal culverts no longer

    Jan 1, 2009

  • AUSIMM
    Treatment of Hard Water for Furnace Jackets

    In Broken Hill, Northern Rhodesia, two water jacket lead furnaces have been in operation for the past three years. The furnaces were erected in war time, and only absolute essentials were procurable.

    Jan 1, 1920

  • CIM
    Application of Multivariate Image Analysis (MIA) to Predict Concentrate Grade in Froth Flotation Processes

    By Pierre Pelletier, Julie Fournier, Gianni Bartolacci, Yves Breau, Dominique Girard, Ahmed Bouajila, Carl Duchesne

    "The development of on-stream analyzers (OSA), such as those based on X-ray fluorescence (XRF), has been key to improve metallurgical performance of flotation processes. However, since these analyzers

    Jan 1, 2003

  • SME
    Accelerated leaching of mine spoils as means of reducing specific conductivity - SME Transactions 2015

    By S. A. Smith-Hamm, E. A. Sarver, A. S. Cox

    Appalachia is an increasing concern, as unnaturally high TDS and/or associated specific conductivity (SC) may contribute to deteriorated stream ecosystem health. The aim of this preliminary study was

    Jan 1, 2015

  • DFI
    Non-Linear Analysis Of Large Pile Groups For The New Wembley Stadium

    By S. Hardy

    The paper describes state of the art non-linear analyses of the pile groups that were employed during the raising of the 133m high triumphal arch which forms the centre piece of the new Wembley stadiu

    Jan 1, 2006

  • AUSIMM
    Breakage Characteristics for Ores for Ball Mill Modelling

    By Whiten W. J

    An investigation on the breakage characteristics of closely sized orc samples at different levels of input energy was carried out to determine an appearance function for possible use in ball mill mode

    Jan 1, 1983

  • DFI
    Challenges Associated with the Construction of a Cofferdam – A Case Study

    By Eric S. White, Thomas J. Sabourin, Khuram R. Mohib

    "This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init

    Jan 1, 2017