Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Seismic monitoring of the Northparkes lift 2 block cave?part I undercutting ? SynopsisCaving of the second lift of the E26 orebody at Northparkes Mines was monitored with a comprehensive package of instrumentation, including an ISS seismic monitoring system. Seismicity was collected by
Jan 1, 2008
-
Is an 80th Percentile Design Point Logical?By D David
Clearly a plant designed only to treat average ore at the nameplate rate will fail to achieve nameplate in any typical year. To insert the necessary capability to achieve nameplate it is common proces
Jul 15, 2013
-
Some Calculations Dealing with Mine TimberONE of the phases of mining wide ore-bodies, such as are found in Broken Hill, is the laying-out and design of the sill floor gangway timber, When, in the above operation, a detail has to be repeated
Jan 1, 1923
-
Mine Accommodation Strategies ù Case Studies in Developing CountriesEarly strategic mine planning includes decisions over the organisation of work and workforce accommodation. These decisions involve significant commitments that affect not only employee quality of lif
Jan 1, 2006
-
Experience Gained At The Application Of Atlas Piles In PolandBy Kazimierz Gwizdala
In recent years, in Poland the ATLAS piles have been successfully applied for some constructions near Gdansk. The piles have been used as foundations for housing and another areas of civil engineering
Jan 1, 2006
-
Photographic technique for the detection and monitoring of ground movements associated with mining and quarryingBy P. Grainger, P. G. Kalaugher
Paper presented at conference and first published in preprint volume of: Risk assessment in the extractive industries, held in University of Exeter, 23-24 March 1994. London: IMM, 1994. Large, unpredi
Apr 1, 1996
-
RI 9332 - Evaluation of Ultrasonic Measurement Systems for Bolt Load DeterminationsBy Stephen C. Tadolini
The U.S. Bureau of Mines has developed ultrasonic measurement instrumentation capable of measuring strains and elongations on tensioned and untensioned mine roof bolting systems. This report evaluates
Jan 1, 1990
-
Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, TennesseeBy James L. Vinson
Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to
Jan 1, 2006
-
The West Driefontein Reclamation Carbon-In-Pulp Plant; Pilot Plant Testwork, Design, Commissioning And OptimizationBy G. D. Buson
Driefontein Consolidated Limited has a proud history in the South African gold mining industry dating back to March 1945 with the formation of the West Driefontein Gold Mining Company. The reclamation
Jan 1, 1999
-
Truck Lift System? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM
May 1, 2003
-
IC 8276 Water Requirements And Uses In New Mexico Mineral Industries (a1ed7c50-9bfd-4fd7-8bf7-857d0ec488ca)By M. M. Gilkey
This report on water requirements for the New Mexico mineral industry includes data on industrial operations closely related to mineral production. It contains general information concerning public wa
Jan 1, 1965
-
Optimum scale of an open pit operation: discount rate and riskFor a large scale open pit mining and concentrating operation, on a low-grade disseminated ore body, it is possible to set an approximate lower bound on economically feasible operating scales and an a
Jan 1, 1986
-
Image Processing of Central Volcanic Region GeophysicsBy M A. Mongillo
Most geophysical and geochemical data collected during regional exploration programmes are in vector form (location, value), and have traditionally been presented and interpreted in a profile or conto
Jan 1, 1992
-
Blasting Bridges and Culverts in Fish Streams: Water Overpressure and Vibration AnalysisBy Kristen Dunlap
There are several thousand remote stream crossing structures in the Tongass National Forest in need of removal. In 2007 thirty-three collapsing log bridges, log culverts, and metal culverts no longer
Jan 1, 2009
-
Treatment of Hard Water for Furnace JacketsIn Broken Hill, Northern Rhodesia, two water jacket lead furnaces have been in operation for the past three years. The furnaces were erected in war time, and only absolute essentials were procurable.
Jan 1, 1920
-
Application of Multivariate Image Analysis (MIA) to Predict Concentrate Grade in Froth Flotation ProcessesBy Pierre Pelletier, Julie Fournier, Gianni Bartolacci, Yves Breau, Dominique Girard, Ahmed Bouajila, Carl Duchesne
"The development of on-stream analyzers (OSA), such as those based on X-ray fluorescence (XRF), has been key to improve metallurgical performance of flotation processes. However, since these analyzers
Jan 1, 2003
-
Accelerated leaching of mine spoils as means of reducing specific conductivity - SME Transactions 2015By S. A. Smith-Hamm, E. A. Sarver, A. S. Cox
Appalachia is an increasing concern, as unnaturally high TDS and/or associated specific conductivity (SC) may contribute to deteriorated stream ecosystem health. The aim of this preliminary study was
Jan 1, 2015
-
Non-Linear Analysis Of Large Pile Groups For The New Wembley StadiumBy S. Hardy
The paper describes state of the art non-linear analyses of the pile groups that were employed during the raising of the 133m high triumphal arch which forms the centre piece of the new Wembley stadiu
Jan 1, 2006
-
Breakage Characteristics for Ores for Ball Mill ModellingBy Whiten W. J
An investigation on the breakage characteristics of closely sized orc samples at different levels of input energy was carried out to determine an appearance function for possible use in ball mill mode
Jan 1, 1983
-
Challenges Associated with the Construction of a Cofferdam – A Case StudyBy Eric S. White, Thomas J. Sabourin, Khuram R. Mohib
"This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init
Jan 1, 2017