Bulletin 208 The Electrothermic Metallurgy of ZincBy B. M. O'Harra
Zinc smelting is frequently termed a ba.ckward art. The term is hardly true, for great progress has been made in recent years in the design and in the thermal efficiency of the retort furnace, in the
Jan 1, 1923
-
OFR-163(2)-81 Microseismic Roof Fall Warning System Development - Field Trials And Commercial Prototype Fabrication - Appendix C: Coal Mine Data Collection SummaryBy Carl Fisher
A microseismic roof fall warning system was field tested in Western and Eastern coal mines in the United States to better define the capabilities and limitations of the microseismic method in predicti
Jan 1, 1980
-
The Improved Detection of Geochemical Soil Anomalies by Multiple Regression Analysis of Biochemical DataMultiple regression analysis was used to predict elemental concentrations of copper and nickel in soils from consideration of the concentration of these elements in vegetation in an ultrabasic complex
Jan 1, 1972
-
Historic Mining Landscapes of Central OtagoAs the theme of this conference is æRediscover OtagoÆ it would seem appropriate to revisit the era of the gold rushes and subsequent mining industry which rapidly advanced settlement and economic pros
Jan 1, 1992
-
OFR-62-78 Automated Continuous Miner Preliminary Design - Section I - IntroductionBy K. C. McMahon
This report is the result of the engineering efforts performed by the Mining Equipment Operations of FMC to develop methods of automating a continuous miner. This work was done as part of modification
Jan 1, 1975
-
New developments and optimization of Wu Shan Phase I SABC comminution circuit : A systematic methodBy Liu Chun-Bao Sun, Hong-Jun, Wei Zhang, Tao Xu
SABC circuits have gained widespread attention within China, and are being gradually applied to many mines. However, the domestic knowledge of comminution process is still relatively basic, and the de
Jan 1, 2014
-
A Pile-Supported Mat Foundation For A 27-Story Building In Milwaukee, Wisconsin (USA)By Alan B. Wagner
The River Tower is a proposed 27-story condominium building in the heart of downtown Milwaukee, Wisconsin (USA). The tower will be over 100 m tall, and will have a ground area measuring 15 m by 40 m.
Jan 1, 2002
-
Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing StructureBy L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory
Jan 1, 1989
-
Pittsburgh Steelers Stadium - Deep Foundations Case StudyBy Larry Rayburn
In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified
Jan 1, 2001
-
Simultaneous Stochastic Optimization of Production Scheduling at Twin Creeks Mining Complex, Nevada"Twin Creeks is a gold mining complex that is part of Newmont’s Nevada operations. The mining complex is composed of two openpits, Mega and Vista, external ore sources and a set of existing stockpiles
Dec 1, 2018
-
Observational Method Using Real Time Surface Settlement Monitoring - The South Toulon Tunnel ProjectBy B. Caro Vargas
The Toulon South Tunnel in France is the second part of a project started 20 years ago. After the problems and delays suffered during the construction of the North Tunnel, due to a complex geologic co
Jan 1, 2012
-
E26 Lift 1 North block cave development and constructionBy R Cunningham
The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared
Mar 29, 2023
-
Recovery and Separation of Ni and Co from Cobaltite and Siegenite Leach Solutions with a Pyridine-Based Extractant Mixture .By Batric Pesic
Solvent extraction of nickel and cobalt from the real leach solutions was studied by using a novel extraction system. The extraction system was a mixture of 2,6-bis-[5-n-nonylpyrazol-3¬y]] pyridine (B
Jan 1, 1997
-
Dravo Systems Enhance Offshore Mining ProspectsBy Homer S. Frankhouser
Materials may be dredged, processed, stored and loaded for shipment at a single site in water depths ranging from 250 to 1200 ft. Solution mining may also be accomplished in deep sea situations. And,
Jan 1, 1971
-
OFR-23-81 Mine Grounding Systems - Evaluation Of In-Mine Grounding System And Codification Of Ground Bed Construction And Measurement Techniques.By Wils L. Cooley
Two major grounding topics are covered: mine ground systems and ground-check monitors. Performance characteristics of ground-check monitors for high-voltage surface mine distribution cables and low-vo
Jan 1, 1979
-
Variation In The Vibration Emission Of Rotary Hammer Drills Under Simulated Work-Site Conditions - IntroductionBy Neil J. Mansfield
Tool manufacturers are required to provide declarations of vibration emission values in order to sell their tools within Europe. To ensure that users can compare results obtained from different manufa
Jan 6, 2006
-
Was that Locked Cycle Test Any Good?By Mike Ounpuu
"Locked cycle testing has become more common practice in the last 10 years. Reasons vary from a desire to avoid pilot plant testing, demand for more variability testing within deposits, and perhaps mo
Jan 1, 2001
-
A structured approach to the evaluation of the energy requirements of HPGR and SAG mill circuits in hard ore applications - SynopsisBy P. Rosario
The application of high pressure grinding rolls (HPGR) has been growing in the mining industry for the last 10 to 15 years. The major benefits supporting this trend are better energy efficiency, impr
Jan 1, 2010
-
OFR-176-82 Development Of A DC Current Limiting Interrupting System For MinesBy Howard B. Hamilton
A switching system for high fault current 300 and 600 volt DC trolley and haulage systems, as used in the mining industry is presented. The system consists of paralleled main and auxiliary contactor c
Jan 1, 1982
-
IC 8507 Mine Subsidence-Extent And Cost Of Control In A Selected AreaBy William Cochran
The Bureau of Mines investigated mine subsidence caused by recent underground mining, estimated the extent of damages, and formulated a procedure for evaluating subsidence costs. On the basis of the q
Jan 1, 1971