Search Documents

  • SAIMM
    Rapid Sensors For Ferroalloy Production And Processing

    By A. McLean, M. Iwase, K. Wakimoto, K. Katogi

    For many decades control strategies have been based upon samples taken from liquid steel, molten slag and gas phase as well as from solid products. Because of recent developments in the areas of dynam

    Jan 1, 2004

  • NIOSH
    OFR-29(1)-82 Visual Attention Locations For Operating Continuous Miners, Shuttle Cars, And Scoops

    By Mark S. Sanders

    This report presents recommended visibility requirements for continuous miner, shuttle car and scoop operations and details the methodology used to generate them. A task analytic approach was used to

    Jan 1, 1981

  • AUSIMM
    Sedimentary Structures in the Metamorphic Rocks and Orebodies of Broken Hill

    Undisturbed minor sedimentary structures-cross-bedding, ripplemarking, scour-and-fill, slumping-are present in most of the rock types in the Willyama Series of the Broken Hill district and in the oreb

    Jan 1, 1959

  • AUSIMM
    Museums, The Mining Sciences and Public Education

    The mining industry has recognised for some time the importance of supporting programs which serve to educate the Australian public about the socio-economic benefits of mineral resource development

    Jan 1, 1989

  • CIM
    The Treatment of Roaster - Off Gases at Campbell Red Lake Mines Limited

    By J. S. Roberts

    "Campbell mines has been in operation since 1948. Part of the process consists of roasting of a flotation concentrate which contains arsenopyrite.At present operation level the milling rate averages a

    Jan 1, 1976

  • SME
    A Dynamic Systems Modeling Approach To Evaluating Backfill Designs

    By M. Wickham

    Design of an open pit backfill requires an understanding of highly varied processes including slope stability, hydrogeology, pit lake chemistry, climate, runoff, and mine waste behavior. Dynamic syst

    Jan 1, 2001

  • SAIMM
    Processing options for the optimal rejection of silicate bearing gangue minerals from a siliceous dolomite fines, S.K. Tripathy, Y.R. Murthy, S. Angadi, A.K. Bhatnagar, and L.O. Filippov

    By Y. R. Murthy, S. Angadi, A. K. Bhatnagar, S. K. Tripathy, L. O. Filippov

    Dolomite is an essential raw material for the refractory industry, a flux in the iron and steel industry and also for the extraction of magnesium metal. Generally, particle size reduction, screening a

    Jan 1, 2020

  • AIME
    Technical Papers and Notes - Institute of Metals Division - The Measurement of Grain Contiguity in Two-Phase Alloys

    By J. Gurland

    A method of measuring the degree of contact between grains of 1 phase in multiphase alloys is derived. It is shown that the number and the areas of contacts between grains can be determined by metal

    Jan 1, 1959

  • AUSIMM
    Use of Geometallurgy to Predict Tailings Leach Acid Consumption at Olympic Dam

    By E Macmillan

    For any processing plant there will be deleterious elements or minerals which affect production or quality, and a strategy to predict their occurrence and mitigate their impact is required. An early o

    Sep 5, 2011

  • NIOSH
    RI 4941 Preparation Characteristics Of Coal From Jefferson County, Pa. ? Introduction

    By William L. Crentz

    Late in the nineteenth century en active coal-mining industry was begun in the Lower Freeport bed near Reynoldsville, Pa., where the bed thickened to more than 10 feet in places . The coal was readily

    Jan 1, 1953

  • SME-ICGCM
    Physical Simulation of Overburden Movement and Stability of Aquiclude in Shallow Seam Mining

    By Qingxiang Huang

    Shallow seam coal field has the largest coal reserve in China. Mining in shallow depth causes serious problems. One of them is subsurface dewatering. In this paper, the physical simulating model was p

    Jan 1, 2006

  • SAIMM
    A Case Study Of Risk Evaluation At Cerrejon Mine

    By Luis-Fernando Contreras, Juliano Maran, Richard LeSueur

    A risk study was carried out at the Cerrejon coal mine in order to assess the impacts of pit slope failure in terms of safety of personnel and destruction of equipment with economic consequences. Res

    Jan 1, 2006

  • NIOSH
    RI 7388 Columbium Alloy Development With Boron, Hafnium, And Tungsten

    By H. R. Babitzke

    As part of a continuing project to develop refractory metal alloys for high-temperature structural applications, the Bureau of Mines applied solid solution and precipitation strengthening techniques t

    Jan 1, 1970

  • SME-ICGCM
    Multiple Seam Mining Feasibility in the Illinois Basin (USA): LaModel Stress Analysis Programs

    By Rebecca Hardy

    The escalating demand for coal, in addition to the steady depletion of reserves, has produced increasingly difficult mining conditions for coal mining companies within the United States, resulting in

    Jan 1, 2006

  • CIM
    Two roles of magnesium in sulphide mineral flotation

    By M. Mirnezami, D. Lascelles, J. A. Finch, E. El-Ammouri

    "In a previous publication, the depressant action of Mg above pH 10 on Cu-activated sphalerite was described (Lascelles et al., 2001). In the present communication, a second role, aggregation is intro

    Jan 1, 2002

  • DFI
    Steel Pile Foundations For Transmission Line Towers, As Used In Western Europe. - 1. Introduction.

    By Alexander J. Verstraeten

    The design and construction of foundations for power transmission line towers present some special problems. This paper describes a system of design and construction for these foundations that was dev

    Jan 1, 1987

  • AUSIMM
    A Dynamic Investigation of Continuous Grinding in a Small Wet Ball Mill

    By Reid K. J, Restarick C. J

    The breakage and flow characteristics of quartz, ground as a minor constituent with calcite in a continuous wet ball mill, have been determined by carefully controlled grinding tests.A mathematical mo

    Jan 1, 1966

  • ISEE
    Expansion of the Panama Canal

    By Tom Treleaven

    The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has

    Jan 1, 1997

  • CIM
    Mill Liner Bolt Removal System

    By Michel Fontaine, Bruno St-Cyr

    "The mission of the CENTRE DE RECHERCHE INDUSTRIELLE DU QUEBEC (CRIQ) is to stimulate economic development by guiding businesses in their pursuit of innovation.With a comprehensive approach to their n

    Jan 1, 2000

  • SME
    Interpreting Backfill QA/QC Test Data: Do We Need an Industry Standard?

    By D. Stone, R. Pakalnis, B. Seymour

    Most mines using backfill routinely carry out quality control (QC) testing of backfill mixes with unconfined compression test cylinders. This is true for paste operations, hydraulic fill operations, a

    Jan 1, 2019